Static Pile Driver

Hot Products

FAQ

Is there a pile driver in it?
There's one in the neighborhood. Can find other counterparts to learn, skilled in their own open. However, the piling machine is not stable, but also a team together. And we're going out of town, this month, ten days.
The impact of drilling pile driver how much money
See how big you want to play, I want to hit a big pile on your point
The pile driving team has many years of piling experience, to undertake the construction of large and small piles, includingKongguanzhu
To consider how the site can take back the unearthed excavation method is ABC pile test done to dig a long tight schedule but also increase the test equipment such as AC two AC after completion of the test sequence can also do a ramp to the middle of the excavation
How many hours will it take for the 200 piles and the 1 pile drivers?
Depending on the groundwater and the readings, I estimate that the minimum number of people is 1 months to 45 days. If the machine is good. No problem for a month.
Is the equipment used in the real estate pile driving machine high or low?
Conventional pile drivers and pile drivers are all plain motors, 380 volts.
Will the crawler auger / pile driver dig out the soil and put it aside or can it be removed far away?
Put it aside, and then shovel truck shovel to pull earth car pulled far,
How to safely operate a pile driver?
Code of practice for safety operation of pile drivers(1) all kinds of pile operators should be trained and tested, and obtain special operation personnel operation certificate, with operation permit operation.(2) the pile shall be vertical and the pile forward shall not exceed 5 degrees, and the back shall not exceed 18 degrees.(3) the angle between the steel wire rope and the guide rod shall not be greater than 30 degrees, and the lifting stake shall be operated according to the operation rules of the lifting operation. It is strictly prohibited to tilt or tilt when lifting precast piles.(4) the hammer of the wire rope should be slightly relaxed after instrumentation, to prevent the hammer lay wire rope, tug, hammer head hook should be locked.(5) diesel hammer pile machine, hoist hammer, hanging pile must use the winch ratchet insurance. Start piling hammer should be opened before the mechanical lock, the hammer claw retracts, starting out before starting the hook, prevent the hammer hanging from the pile top pile accident.
What are the preparations for the piling site?
1, the pile position determination: according to the project provided by the construction unit and the pile axis location map of pile location, pile location must be accurate, and in the pile position by a soldering iron drilling, hole depth is 15~20cm, filled with lime, prevent in the process of driving the wrong pile.2. Pile up(1) pile stacking shall be determined by pile driving route and pile driving sequence(2) the site shall be level and level with three passes and one leveling. Remove obstacles in the ground, underground and air in the range of the moving of the pile driver. The wooden posts and the pile rings shall be of the same position, except for the contact between the pile and the pile, and nothing else shall be in contact with the pile so as to prevent cracks in the pile.(3) the strength of reinforced concrete precast piles must be up to 100% before they can be transported and piled3, the selection of pile machineAccording to the design of single pile bearing capacity and pile length, this project intends to use hammer weight 2.5t track type diesel pile driver.