Hydraulic Pile Hammer

Hydraulic Pile Hammer Related Searches

Fsp Sheet Pile Static Pile Driver Static Worx

Hot Searches

Hydraulic Scaffolding For Sale Glasshouses For Sale Aeration Machine For Sale Hydraulic Scaffolding For Sale

Hydraulic Pile Hammer Supplier & Manufacturer from China

Okorder.com is a professional Hydraulic Pile Hammer supplier & manufacturer, offers integrated one-stop services including real-time quoting and online cargo tracking. We are funded by CNBM Group, a Fortune 500 enterprise and the largest Hydraulic Pile Hammer firm in China.

Hot Products

FAQ

What is the depth of the pile? What is the principle of hydraulic pile?
When the bearing capacity of the foundation is not enough, it is not suitable for the direct excavation of the ground (such as quicksand, silt, marshes, etc.) using piling. Aimed at:Reinforce the soil and transfer the load to ensure that the superstructure will not be deformed or damaged due to uneven settlement of the foundation.Pile shape: pile, steel pile, cement pile, reinforced concrete pile and so on;The stress forms of the pile are end bearing pile, friction pile and mixed pile;Pile depth: sufficient to withstand the pressure of the superstructure, without deformation, according to the design life of the building: (permanent, short, temporary)Usually to the design bearing layer;The principle of hydraulic pile: the stake is carried to the bearing layer by the hydraulic press.The above answer, I hope you will be satisfied.
I have a pile machine construction record card, but Supervision said or not, please master pointing.
Construction permit and quality assurance certificate, and environmental noise shall comply with the Supervision Certificate
A screw driver pile diameter 400mm depth of not less than 12 meters, 24 hours a day non-stop, how much can be hit?
A screw driver pile diameter 400mm depth of not less than 12 meters, 24 hours a day non-stop, how much can be hit?
What's the profit of a pile driver for a day at the site?
Because, after all, the pile driver is not only a few years, the choice of good quality in the early may not be cost-effective, but after taking into account, or suggest that you buy a little bit of the machine. After all, if the driver problem that you every two or three days, the work is not good for.
Which is better for the building foundation treated by a pile driver and a rammer?
Compaction can not deal with: 1. around the fear of loess foundation soft soil /2. /3./ fall of vibration building. But the cost is cheap. The long-term effect is good.Piling can basically cope with any situation, but the cost will be high
How much money in a pile driver Huilong piling machine price?
Piling machine prices from more than ten million to millions of, and the specific depends on how big you hit the pile, the specific configuration. Selection of models requires selection according to use.A lock of rotary drilling rig advantage Hui omron:1, the fastest 20 minutes, you can dig 15 meters of earth drilling2, drilling can be broken cement concrete floor.3, the use of XCMG power head, multi-stage shock absorption technology to ensure that the overall construction of more stable, power head key bar used in reverse and used to extend its service life.
Can you drive an excavator? Can you learn it quickly?
What you said is the steel sheet pile hammer shock, will not have to open the machine learning
Can the piling machine be built at night?
In principle, it is not allowed to work at night, unless it does not affect anyone's life, study and work, and does not constitute noise pollution.