ZYC800 Hammer Pile Driver Hydraulic Static Pile Driver
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
ZYC800 Hammer Pile Driver Hydraulic Static Pile Driver for Sale
Lower Energy Consumption: | |
>>We use variable hydraulic systems with low loss and constant power in this series of products, so that energy consumption decreases by 30% and working efficiency increase by 60%. |
High Efficiency: | |
>>To ensure the high working efficiency of the whole machine, we use hydraulic systems with big power and great flow, the pile driving mechanism with multi-speed control and being quick in getting ready for operation. |
High Reliability: |
>>To ensure the high reliability of our products which engineering machines should possess, we improve the design and use very reliable materials or components which we select carefully in the process of purchasing. |
|
Convenience in dismantling, transportation and maintenance: |
>>Since we have constantly improved our design of pile drivers for more than 10 years, every part of the machine is easy to be taken apart, which provides convenience in transportation and maintenance. |
|
Multi-function: |
>>Our products are multi-function static hydraulic pile drivers with embracing pile driving, top-pressing pile driving or both at the same time because they are well combined with each other. |
Systemization and Maximization: |
>>Our company has developed 14 models of pile drivers with the capacity of 60 tons to 1200 tons and each model is classified into 4 kinds according to its function with the maximum tonnage of 1200. |
|
Flexibility in Designing: |
>>To keep up with the development in the engineering machinery of the world, we will integrate all useful high technologies from machine-building, electricity, hydromechanics and electronics into our products and meet different individual needs of our customers. |
|
Two Patents: | |
>>The design of inverted cylinder as a supporting leg which avoids the radial force on the piston extends the life-time Of the cylinder. |
Parameter/Model | ZYC800 | |
---|---|---|
Rate piling pressure(KN) | 8000 | |
Piling speed(m/min) | Fast | 6.8 |
Low | 10.2 | |
Piling stroke(m) | 1.9 | |
Pace(m) | Longitudinal | 3.6 |
Horizontal | 0.7 | |
Angle range(°) | 11 | |
Rise stroke(m) | 1.2 | |
Square pile(mm) | Max | 550 |
Circle pile(mm) | Max | 600 |
Side piling(mm) | 1420 | |
Corner piling space(mm) | 2850 | |
Lifting weight(t) | 16 | |
Pile hanging length(m) | 15 | |
Power(KW) | Piling | 141 |
Lifting | 30 | |
Main dimension(m) | Work length | 14.00 |
Work width | 8.32 | |
Transpot height | 3.15 | |
Total weight(t) | 800 |
FAQ
1.Which payment terms can we accept?
Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.
2.How long will our price be valid?
We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.
3.What are our advantages compared with manufacturers?
a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.
b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.
- Q:Excavators, pile drivers, how to operate? The master knows,
- Simple, first stop the car, push the right handle forward (big arm down), push the left hand lever (small arm out), handle the right (release bucket), do the above three actions at the same time until the bucket touches the ground. Then, the left handle back down and right arm handle down the left arm when receiving bucket, bucket is full. Then the big arm, left or right rotation and small rotating arm bucket on the line! Got it?! You can also question me!
- Q:Which is better, wheel driven pile driver or caterpillar rotary drilling rig? What's the difference between workmanship?
- Wheeled come and go convenience, crawler effect is better!
- Q:How much is a small pile driver with a 15 meter depth? When can I get a discount?
- A is specialized in Matlock piling machine, there are a variety of support, help you money... In Matlock is south of the Yangtze River's first professional production of piling.
- Q:Highway guardrail, piling machine, drilling, piling price
- Highway guardrail, piling machine, drilling, piling price8-10 contact me
- Q:I have two pile drivers, followed by engineering piling, what qualifications do you need?
- Hang on it, for qualification trouble. You can contact me if you need to buy piling equipment.
- Q:How did the pile of clay work after the pile driver finished?
- Classification according to the setting effect of pilesNon compaction pile: such as drilling (punching or digging) pile and bored after the first and then into the precast pile, due to removal of holes in the soil in the process of setting up, the soil around the pile is not to be excluded, and may move to the pile hole, the soil shear strength decreased, pile side friction decreases.Partially squeezed soil pile: impact bored pile, H steel pile, open steel pipe pile and open prestressed concrete pipe pile, etc.. In the process of pile setting, the soil around the pile is slightly squeezed out, but the strength and deformation of soil have little change.Pile: solid precast pile and lower pile, piles and closed cast-in-place pile in hammer and vibration during the penetration will be located at the position of pile soil mass out, the serious disturbance of the soil structure, soil strength and deformation properties influence.Classification according to the formation method of pilesDriven pile: the use of machinery will be prefabricated concrete piles, stakes, steel sheet pile into the soil layer, the soil compaction, so as to achieve the purpose of strengthening the foundation.Bored pile: the underwater concrete is used to form an end bearing pile or a friction pile, so as to reinforce the foundation.
- Q:What's the difference between a track type diesel pile driver and a crawler diesel pile driver?
- 2) each characteristicBecause of the different ways of exercise, they determine their respective characteristicsRail type diesel hammer: firm and level is good, generally larger power; Caterpillar diesel hammer: firm and level in general, but the convenience of high efficiency (without a rail type diesel hammer pile re install each playing a track)
- Q:How many meters per day can a foundation shovel in Luoyang be 80 centimeters in diameter? Is it easy to damage?
- According to the different soil layers, if silt if one hour is 8 meters, if encountered in geological almost but also to add some water, general soil clay, the clay soil mainly depends on pull speed hit the car with no follow on, Luoyang has specialized in the production of large caliber. Peony motor Luoyang shovel, one hour fast hit 35 meters, average 20 meters.
- Q:Safety requirements for diesel hammer pile drivers for diesel hammer pile drivers
- 1, the pile driver walking and slewing, hanging pile, hammer should not be carried out simultaneously. The pile driver shall not turn or walk in full swing after hanging the pile. 2 Side Piling and long distance pulling pile are not allowed in pile driver. When the pile is hoisted in front, the horizontal distance of concrete shall not be greater than 4m, and the steel pile shall not be larger than 7m, and the pile shall be prevented from colliding with the post. 3 when the column is turned into place and the column is locked, the piling frame of the double guiding post can be operated. 4 before the start of the diesel hammer, the pile hammer, the pile cap and the pile should be on the same axis, and shall not be driven by eccentric piling. 5 in soft soil pile driving, should first close the throttle, cold beat, to each attack penetration is less than 100mm, can start the pile hammer. 6 after the start of the diesel hammer, the landing gear should be lifted. The distance between the landing gear and the top of the cylinder of the cylinder hammer shall not be less than 2m during the hammering process. 7 when the diesel hammer is running, the jumping height of the impact part shall be visually observed, and the requirements of the instruction manual shall be strictly enforced. When the required height is reached, the throttle shall be reduced and the stroke of the impact part shall be controlled. 8 during the operation, attention should be paid to the change of the soil layer and the operation of the pile driver, and the necessary measures should be taken in time. 9 diesel hammer appear early ignition, should stop working, according to the instructions for processing. 10 when the piston jumps on the cylinder hammer, the grease should be observed to flow out of the drain hole. The lubricating oil of the lower piston shall be filled according to the instruction manual.
- Q:Is the prestressed pipe pile driven by a diesel pile driver or a static pile driver?
- Hydraulic press-in is a jacked pile. Hydraulic hammer is a hydraulic pile hammer, and also a kind of impact pile. The single acting hydraulic hammer is only the rising driving mode, which is hydraulic and then released. The double acting hydraulic hammer also uses hydraulic acceleration when falling down. The speed is fast, and the lighter hammer core can be used. The impact force is larger than the ordinary one, and the steel pile is usually used
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
ZYC800 Hammer Pile Driver Hydraulic Static Pile Driver
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords