Aerial view of production workshop


The machine uses three-fulcrum pile frame with crawler chassis, Which ensure the excellent performance. It is not only suitable for all kinds of pile foundation work,But also suits the scattered pile foundation work as well as the no-regulation special foundation engineering. Frequent transfer, poor working environment and narrow space are all the suitable working conditions for this equipment.

Main technical data



Recently,all the world are vigorously promoting the power,energy and infrastructure construction projects,therefore,full hydraulic crawler pile driver will have more and more application and broad prospects.

Q: Multilayer, six layers! Real Estate Company real estate. I would like to ask you to build the foundation is a good pile or independent column good? May I have some questions from insiders?! Thank you
Depends on geological reports, can not pile, it is best to save a lot of money Oh!
Q: Piling of percussive drilling
7, the drilling process control should be rigorous, but also do not have to worry about failure, a reasonable choice of treatment methods, generally can be solved, the common, foot blade perforation, hole collapse, partial hole, cross hole, drilling, drilling, drilling buried crane, well preventive measures are generally not in advance, very important duty responsibility. 8, the remaining holes, steel cage decentralization, concrete pouring, sealing and other are more conventional, do not write more. But the bottom of the hole, sediment, sediment, etc. must be recycled clean, otherwise it will be buried in the later works of greater risk. When the concrete is poured, the bottom concrete under the impact of residue inclusion in steel or bond caused by defects in the pile in concrete, on the upper structure of the load transfer to the bottom of the pile, the structure will definitely should produce uneven settlement for residue.
Q: I've heard that the pile driver's pay is high. I want to study. Also please seniors pointing. Be deeply grateful!
However, the piling machine is not stable, but also a team together. And we're going out of town, this month, ten days.
Q: What is the classification of piling equipment? A little more detail, please
The vibration pile machine, static uplift pile machine, pile hammer machine, static pile machine, deep mixing pile machine, jet pile base and so on, the general pile hammer machine for suburban noise, smoke pollution, static pressure pile machine is used in the city, small noise will probably ~ ~
Q: I have a pile machine construction record card, but Supervision said or not, please master pointing.
If there is any nonconformity, the rectification shall be completed and checked by the supervision.
Q: How many hours will it take for the 200 piles and the 1 pile drivers?
200 piles of 1 piling machine is generally need 19 day time is finished, also need 152 hours to complete.
Q: Does the pile driver belong to special equipment?
Special equipment is the safety of life, the risk of large boilers, pressure vessels (including gas cylinders, the same below), pressure piping, elevator, crane, passenger ropeway, large recreation facilities and special motor vehicle factory. Piling machine does not belong to special equipment
Q: Why should the pile foundation be excavated after the pile driving?
It is convenient to measure and locate the center of the pile, and also facilitate the approach of the piling machine
Q: How many small pile drivers are there in Hunan? It's best to have the exact location
Hunan small piling machine manufacturers or a lot, like Hunan wylong machinery should be more excellent in mechanical industry.
Q: Is there an operation certificate for percussive drill driver?
at the top of the main frame is fixedly connected with the pulley first, the lower part is provided with a steering pulley, the pulley head and a steering pulley connected by wire rope transmission; one end of the wire rope is fixedly connected with the hammer, the other end is connected to a winch Part; the manipulation of PLC electric control box, automatic operation mechanism began to work, you can control the opening and closing part of piling winch clutch, the automatic impact drill piling machine has the advantages of simple structure, low cost, convenient operation, reliable performance.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords