ZYC500 Hydraulic Static Pile Driver for Sale
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
ZYC500 Hydraulic Static Pile Driver for Sale
Lower Energy Consumption: | |
>>We use variable hydraulic systems with low loss and constant power in this series of products, so that energy consumption decreases by 30% and working efficiency increase by 60%. |
High Efficiency: | |
>>To ensure the high working efficiency of the whole machine, we use hydraulic systems with big power and great flow, the pile driving mechanism with multi-speed control and being quick in getting ready for operation. |
High Reliability: |
>>To ensure the high reliability of our products which engineering machines should possess, we improve the design and use very reliable materials or components which we select carefully in the process of purchasing. |
|
Convenience in dismantling, transportation and maintenance: |
>>Since we have constantly improved our design of pile drivers for more than 10 years, every part of the machine is easy to be taken apart, which provides convenience in transportation and maintenance. |
|
Multi-function: |
>>Our products are multi-function static hydraulic pile drivers with embracing pile driving, top-pressing pile driving or both at the same time because they are well combined with each other. |
Systemization and Maximization: |
>>Our company has developed 14 models of pile drivers with the capacity of 60 tons to 1200 tons and each model is classified into 4 kinds according to its function with the maximum tonnage of 1200. |
|
Flexibility in Designing: |
>>To keep up with the development in the engineering machinery of the world, we will integrate all useful high technologies from machine-building, electricity, hydromechanics and electronics into our products and meet different individual needs of our customers. |
|
Two Patents: | |
>>The design of inverted cylinder as a supporting leg which avoids the radial force on the piston extends the life-time Of the cylinder. |
Parameter/Model | ZYC500 | |
---|---|---|
Rate piling pressure(KN) | 5000 | |
Piling speed(m/min) | Fast | 8.6 |
Low | 1.7 | |
Piling stroke(m) | 1.9 | |
Pace(m) | Longitudinal | 3.6 |
Horizontal | 0.7 | |
Angle range(°) | 11 | |
Rise stroke(m) | 1.2 | |
Square pile(mm) | Max | 550 |
Circle pile(mm) | Max | 600 |
Side piling(mm) | 1250 | |
Corner piling space(mm) | 2500 | |
Lifting weight(t) | 16 | |
Pile hanging length(m) | 15 | |
Power(KW) | Piling | 111 |
Lifting | 30 | |
Main dimension(m) | Work length | 13.50 |
Work width | 7.45 | |
Transpot height | 3.10 | |
Total weight(t) | 500 |
FAQ
1.Which payment terms can we accept?
Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.
2.How long will our price be valid?
We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.
3.What are our advantages compared with manufacturers?
a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.
b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.
- Q: What's the difference between a amd bulldozer and a pile driver?
- when processing the CPU performance when sharing CPU acceleration, when GPU needs to deal with a large amount of card game when the bias display processing GPU side to speed up, so some complete performanceFor example, I have 2 truck drivers and night driving (which has a driver is spare Porter and 2 part-time drivers) at Porter, I drove with the driver, I can call a driver when handling spare porters so I have 3, this is called distribution acceleration, rational use
- Q: Which is better, wheel driven pile driver or caterpillar rotary drilling rig? What's the difference between workmanship?
- A wheel on a walking crawler. Matlock crawler can, more than 10 cm of the silt to climb.
- Q: How to maintain the pile driver daily?
- (1) engine parts: washable air filter, oil filter, diesel filter net. Release the fuel tank deposits and clean the fuel tank strainer. Check the main engine crankcase lubricating oil and clean the respirator. Check and adjust the tightness of generator belt and fan belt, and lubricate fan bearing. Check the water leakage of the pump and clean the oil outside the water tank. Check the flywheel connecting screws and connections with no breaks and replace them if necessary. (2) walk and control mechanism. Inspect the lubrication surfaces of each gear box and reducer. Add lubricating oil according to the standard level. Check the bearing wheel, idler pulley, driving wheel and axle bush, add enough lubricating oil and grease. The check and adjust the track tension, full track bolt tightening.
- Q: now to pull out, how can pull out? FiveThe machine can not be used, how to take out in a simple way! Now, how many tons of jacks do I need if I use a jack?
- Choose the proper crane and vibratory pile driver. Find out about the manufacturer.If Jack would estimate the pile weight of 14 tons, steel pipe in the soil weight of 50 tons, the friction pile is difficult to calculate, and the soil, curing time and pile, an estimated 600 tons to 2000 tons, to do a ring plate tooling, sheathed on the steel pipe, the gap should be small, on the tooling welding on the 1 meter long handle jack. Of course, you know, the hydraulic pad, the larger area, or the steel beam.
- Q: Why are pile driving boring often deflected?
- What machine? You can not speak this person, piling, Ken positioning, partial hit
- Q: How much is the average cost of piling a metre?.Construction Engineering piling machine how much money? (can be more than 30) piling generally hit a meter, what is the cost?. How much can I pay for a metre? What's the procedure for piling operators?
- Domestic about 2000000, the best to count Germany and Italy one, at least 500 - about 6000000! About one meter. Need fifty or so, a twenty meters stake will not exceed one thousand dollars, the operation of pile machine need pile machine driver's license, also can hang some of the company's account.
- Q: What's the effect of Engineering piling?
- Provide the foundation with carrying capacity. Figuratively speaking: you want to select a piece of land, build a house on it, but the soil is not good, if the house made above may sink may also occur uneven settlement drained, it is necessary to carry out treatment on the site, a lot of processing method, which is a kind of pile. Thus the building passes the load to the foundation, the foundation passes to the pile and the pile passes to the rock below the pile.
- Q: HD50 cylinder type diesel hammer, HD62 hammer, HD80 hammer, walking pile driver, crawler type pile driver
- HD50 refers to the 5 tons of diesel pile hammer; HD62 refers to the 6.2 tons of diesel pile hammer; HD80 refers to the 8.2 tons of diesel pile hammer; walking pile driver is walking pile frame supporting diesel pile hammer general "walking hammer" or "walking type diesel pile hammer" or "walking type diesel pile hammer";
- Q: How many meters per day can a foundation shovel in Luoyang be 80 centimeters in diameter? Is it easy to damage?
- According to the different soil layers, if silt if one hour is 8 meters, if encountered in geological almost but also to add some water, general soil clay, the clay soil mainly depends on pull speed hit the car with no follow on, Luoyang has specialized in the production of large caliber. Peony motor Luoyang shovel, one hour fast hit 35 meters, average 20 meters.
- Q: What's the use of a pile driver?
- It is a spiral into the hole, drilling, torsion, flexible application in different soil, different pile rod, a Hunan photovoltaic site ente spiral auger, the finished pile rod placed in a spiral drill under the hook on the second column, is a very typical case of PV column pile. With such an efficient job, wouldn't it make you realize your dream of getting your cost back in 10 days?In addition, it can be applied for diversified garden landscaping, well drilling, drilling, sampling, planting pit coal pillar foundation drilling, bridge with pit wells, drilling hole, wind generator column pole hole (hole) of the drill, expand your business to expand your money.Choose gornt heavy bosses don't have to worry about the machine idle.
Send your message to us
ZYC500 Hydraulic Static Pile Driver for Sale
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords