ZYC120Hydraulic Static Pile Driver for Sale
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
ZYC120Hydraulic Static Pile Driver for Sale
Lower Energy Consumption: | |
>>We use variable hydraulic systems with low loss and constant power in this series of products, so that energy consumption decreases by 30% and working efficiency increase by 60%. |
High Efficiency: | |
>>To ensure the high working efficiency of the whole machine, we use hydraulic systems with big power and great flow, the pile driving mechanism with multi-speed control and being quick in getting ready for operation. |
High Reliability: |
>>To ensure the high reliability of our products which engineering machines should possess, we improve the design and use very reliable materials or components which we select carefully in the process of purchasing. |
|
Convenience in dismantling, transportation and maintenance: |
>>Since we have constantly improved our design of pile drivers for more than 10 years, every part of the machine is easy to be taken apart, which provides convenience in transportation and maintenance. |
|
Multi-function: |
>>Our products are multi-function static hydraulic pile drivers with embracing pile driving, top-pressing pile driving or both at the same time because they are well combined with each other. |
Systemization and Maximization: |
>>Our company has developed 14 models of pile drivers with the capacity of 60 tons to 1200 tons and each model is classified into 4 kinds according to its function with the maximum tonnage of 1200. |
|
Flexibility in Designing: |
>>To keep up with the development in the engineering machinery of the world, we will integrate all useful high technologies from machine-building, electricity, hydromechanics and electronics into our products and meet different individual needs of our customers. |
|
Two Patents: | |
>>The design of inverted cylinder as a supporting leg which avoids the radial force on the piston extends the life-time Of the cylinder. |
Parameter/Model | ZYC120 | |
---|---|---|
Rate piling pressure(KN) | 1200 | |
Piling speed(m/min) | Fast | 10.0 |
Low | 3 | |
Piling stroke(m) | 1.6 | |
Pace(m) | Longitudinal | 1.6 |
Horizontal | 0.5 | |
Angle range(°) | 15 | |
Rise stroke(m) | 0.8 | |
Square pile(mm) | Max | 350 |
Circle pile(mm) | Max | 300 |
Side piling(mm) | 720 | |
Corner piling space(mm) | 1500 | |
Lifting weight(t) | 8.0 | |
Pile hanging length(m) | 12 | |
Power(KW) | Piling | 37 |
Lifting | 22 | |
Main dimension(m) | Work length | 9.45 |
Work width | 5.2 | |
Transpot height | 2.9 | |
Total weight(t) | 120 |
FAQ
1.Which payment terms can we accept?
Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.
2.How long will our price be valid?
We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.
3.What are our advantages compared with manufacturers?
a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.
b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.
- Q: How many meters can a small pile driver reach?
- 1.2 meters in diameter, wylong machinery had sold a small machine
- Q: Which is better, wheel driven pile driver or caterpillar rotary drilling rig? What's the difference between workmanship?
- Wheeled come and go convenience, crawler effect is better!
- Q: How many prestressed concrete pipe piles can a pile driver hit in a day?
- 1, a pile driver can play the prestressed concrete pipe pile in a day, and the number of skilled workers, geological conditions, as well as the quality of the pile driver. Under normal circumstances, you can hit around 400 a day.2, in order to make up for the prestressed concrete concrete cracks in the phenomenon, in the use of components (load) before, to advance a concrete pre pressure in concrete in the tensile zone, using the method of artificial force, reinforced by stretching, the retraction force of steel, the tension zone of the concrete in advance under pressure. This stored pre pressure, when the components bear the tension produced by the load when the first offset by pre stress tension zone in concrete, and with the increase of load, the concrete tension, which limits the concrete elongation, delay or not lead to cracks, which is called prestressed concrete. Prestressed concrete pipe pile is a kind of precast concrete pile, which embodies the progress of modern concrete technology and the high and new technology level of concrete products.3, [prestressing: force] is a prestressed prestressed structure in order to improve the service performance during the construction to the structure of pre applied stress structures of pre compressive stress can be wholly or partially offset load caused by tensile stress, avoid structural damage. Commonly used in concrete structure, concrete structure under load is before, in advance to put pressure on it to make it in the outside load when the concrete tensile stress compressive stress produced in order to offset or reduce the load due to the tensile stress, the structure in the case of normal cracks or crack late.
- Q: A pile driver 1 team can play many 12mI36b steel sheet pile
- According to the geological conditions are different450 pile driverThe number of 9m Larson steel sheet piles is about 100 a day300 times the pile driver
- Q: What's the difference between a walking tube type diesel pile driver and a track type diesel pile driver?
- The piling machine works on the top and bottom of the pile hammer. The pile hammer moves up and down on the 2 rail. It is called a track type diesel pile driver, and the pile hammer operates in the pipe way up and down. It is called a tube type diesel pile driver
- Q: What are common piling steel pile equipments?
- 3, piling ship, hull steel box structure, the deck with pile frame, can be applied to meet the need of batter pile up.4, static piling machine, static piling machine is a relatively new piling equipment, with low noise, small vibration, driving speed, the construction site of the advantages of less pollution, but the cost is relatively high, the current construction is still relatively less used.
- Q: Which is better for the building foundation treated by a pile driver and a rammer?
- Generally speaking, the pile foundation is better. Of course, the dynamic compaction also has advantages, such as price and time. But when it comes to earthquake, certainly pile foundation compaction is not dominant, anti transverse shear and settlement, once the earthquake or what other effects caused by displacement and settlement, is very dangerous, as here in Hainan as an example, there are high-rise pile foundation, and the design of pile bottom are entered into force layer.
- Q: How much is piling foundation for pile driving machine?
- I was in Guizhou, bought the first 11 years, 14 years and bought 2 units, 3 units are now everywhere, run the project, if the driver what is wrong, in a Matlock service team would hasten to help you solve!
- Q: Under the high voltage line, within two meters on both sides, no pile driver shall be installed
- In case of special circumstances, the safety technical measures must be taken and the installation can be installed after the approval of the higher technology supervisor.
- Q: Why do some people need to dig the foundation and pile it up to dig a hole?
- how to do?You say the digging and then piling, probably because the pile is the need for technology, such as filling piles, you do not dig, you can not do, or that you have obstacles on the surface, to dig into the original soil piling, so good control piling quality
Send your message to us
ZYC120Hydraulic Static Pile Driver for Sale
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords