ZYC100 Used Pile Driver Hydraulic Static Pile Driver Machine for Sale
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
ZYC100 Used Pile Driver Hydraulic Static Pile Driver Machine for Sale
Lower Energy Consumption: | |
>>We use variable hydraulic systems with low loss and constant power in this series of products, so that energy consumption decreases by 30% and working efficiency increase by 60%. |
High Efficiency: | |
>>To ensure the high working efficiency of the whole machine, we use hydraulic systems with big power and great flow, the pile driving mechanism with multi-speed control and being quick in getting ready for operation. |
High Reliability: |
>>To ensure the high reliability of our products which engineering machines should possess, we improve the design and use very reliable materials or components which we select carefully in the process of purchasing. |
|
Convenience in dismantling, transportation and maintenance: |
>>Since we have constantly improved our design of pile drivers for more than 10 years, every part of the machine is easy to be taken apart, which provides convenience in transportation and maintenance. |
|
Multi-function: |
>>Our products are multi-function static hydraulic pile drivers with embracing pile driving, top-pressing pile driving or both at the same time because they are well combined with each other. |
Systemization and Maximization: |
>>Our company has developed 14 models of pile drivers with the capacity of 60 tons to 1200 tons and each model is classified into 4 kinds according to its function with the maximum tonnage of 1200. |
|
Flexibility in Designing: |
>>To keep up with the development in the engineering machinery of the world, we will integrate all useful high technologies from machine-building, electricity, hydromechanics and electronics into our products and meet different individual needs of our customers. |
|
Two Patents: | |
>>The design of inverted cylinder as a supporting leg which avoids the radial force on the piston extends the life-time Of the cylinder. |
Parameter/Model | ZYC100 | |
---|---|---|
Rate piling pressure(KN) | 1000 | |
Piling speed(m/min) | Fast | 10.0 |
Low | 2.0 | |
Piling stroke(m) | 1.6 | |
Pace(m) | Longitudinal | 1.6 |
Horizontal | 0.5 | |
Angle range(°) | 15 | |
Rise stroke(m) | 1.45 | |
Square pile(mm) | Max | 350 |
Circle pile(mm) | Max | 350 |
Side piling(mm) | 450 | |
Corner piling space(mm) | 900 | |
Lifting weight(t) | 8.0 | |
Pile hanging length(m) | 12.0 | |
Power(KW) | Piling | 37 |
Lifting | 11 | |
Main dimension(m) | Work length | 6.65 |
Work width | 4.20 | |
Transpot height | 2.70 | |
Total weight(t) | 100 |
Advantages
1 sincere
CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the outdoor heaters produced by CNBM are compliant with the national level quality.
2 professional
Our engineers will at your services 24hours to answer your questions. Our goal is to provide the best professional services.
3 quality
CNBM International’s outdoor heater have strict quality control, only the best quality products can pass the test.
4speed
We have professional sales team to guarantee your reply within 12hours to save your precious time.
5 After sales
If the tower crane has any problems, we will solve your problems in first time.
FAQ
1.Which payment terms can we accept?
Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.
2.How long will our price be valid?
We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.
3.What are our advantages compared with manufacturers?
a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.
b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.
Company Information
China National Building Materials Group Corporation is the full name of CNBM, which is one of the largest state-owned group in China. In 2013, the total asset of CNBM exceeds US$60 billion dollars with a total staff of 180,000. CNBM is listed in the World Top 500 Enterprises!
CNBM International works as the international platform for CNBM Group. In 2013, our total sales income was more than US$16.8 billion dollars.Every year we import large quantity of iron ore, coking coal and thermal coal etc from India, Brazil, Australia and Russia and other countries.ld'>Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.
Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.
1,Are you trading company or manufacturer?We are professional manufacturer, and our factory mainly produce water well drilling rig, core drilling rig, DTH drilling rig, piling rig, etc. Our products have been exported to more than 50 countries of Asia, South America, Africa, and get a good reputation in the world.
2,Are your products qualified?Yes, our products all have gained ISO certificate,and we have specialized quality inspection department for checking every machine before leaving our factory.
3,How about your machine quality? All of our machines hold the ISO, QC and TUV certificate, and each set of machine must pass a great number of strict testing in order to offer the best quality to our customers.
4,Do you have after service?Yes, we have special service team which will offer you professional guidance. If you need, we can send our engineer to your worksite and provid the training for your staff.
5,What about the qaulity warranty?
We offer one-year quality warranty for machines' main body.
6,How long can you deliver the machine?
Generally, we can deliver the machine in 7 days.
- Q:Why should the pile foundation be excavated after the pile driving?
- The general construction of pile foundation is the basic to the pile of soil by mechanical or artificial (gravel pile is discharged by extrusion) of earthwork digging a lot, if the first operation is likely to damage the basal layer of base bearing capacity requirements of earth will also affect dug the basement level! After excavation, the construction schedule will be accelerated and the quality hidden from the long exposure of the basement will be reduced!
- Q:Is the architecture of the pile driver strong in single core performance or multi - core capability? Or?
- Overall, the AMD's nuclear performance has not been improved for almost 10 years. Basically maintained at the level of K8.
- Q:How to maintain the pile driver daily?
- Daily maintenance of pile driver1 、 maintenance of each shift (after class, after class)(1) before the daily operation, the operator should clean the surface of the pile driver. Parts that need oiling must be lubricated 1-3 times a day to keep the lubricated parts lubricated. (2) remove dirt and dirt from the equipment. (3) check and fasten the connecting bolts of each department, check the lubrication and wear of main clutch, steering pump, fan bearing, high pressure oil pump, load wheel and idler pulley. If there are any problems, they should be dealt with in time.
- Q:Invite friends together to buy a long spiral step of 30 meters of the pile driver, told me as long as the project profits are objective, you can package to 200W/, would like to ask the experts familiar with the bank bosses according to your local market if the annual package is how much money, how much is the monthly package, or by how many meters.. Thank you。。 Thank you
- 1, Shandong small 360 degree rotation of the kind of Shandong strong machinery factory, sold in about 6-8;2, long spiral pile driver is a long spiral drilling machine another name, later called long spiral drilling machine.
- Q:Rural housing foundation, piling machine generally can play how deep?
- In a spiral track Matlock advantage:1 、 simple operation, one hole forming,2, fast, 3-5 minutes can become holes 5 meters3, the maximum diameter of the hole 800mm, the maximum hole depth of 10m, suitable for housing construction, highway, high-speed rail slope protection and other pile foundation construction4, special, mobile convenient, 360 degrees of free rotation5, firewood and electricity dual-use, reduce cost expensesA Hui Omron caterpillar rotary drilling rig advantage:1, the fastest 20 minutes, you can dig 5-8 meters of earth drilling2, drilling can break strong weathering rock layer3, the well-known brand of the engine, "Yuchai, Weichai, fuel consumption of 40-50 yuan per hour.4 、 selection of multi-functional parts, such as: Clay bit, sand fishing drill, bottom drill bit, easy to change, practical.
- Q:what kind of VLV cable is needed, how to determine, after the cable from the low-voltage distribution box out, 460m arrived distribution of electricity 100It's best to explain how to calculate, how to determine the current, and the specifications of the cable, thank you very much!630 of the box changed to the distribution box for the cable, 240 of the cable is single core, or 3*240 cable. What kind of cable can be specific about it? Underground directly buried, directly to a cable model, aluminum core cable
- Two way 240 are used together,Pe=75*5=375Kx=1Pjs=pe*kx=375Cos=0.8Ijs=pjs/ue/3/cos=375/220/3/0.8=710Adopt cable specification, 2 way 4*240+1*120 parallel useIn the case of direct buried laying, the selection of outer sheath of cable shall comply with the following provisions:1 when the cable is under greater pressure or has mechanical damage, it should have reinforced layer or steel tape armour.2 in the quicksand, backfill, land and other possible displacement of soil, the cable should be steel wire armored.3 termite serious harm extrusion cable area, should choose higher hardness of the outer protective layer can also be thin in common outer sheath is extruded on the higher hardness of the protective layer, which can be used as the material of nylon or special polyolefin copolymer, also can be made of metal or steel armor.4 the outer layer of polyethylene should be used in areas with high underground water table.5 in addition to the above circumstances, the outer sheath without armour may be used.
- Q:is it a good comment or a bad review? What does a pile driver mean? Good, bad?
- AMD is a company specializing in research and development of high performance processor sales company, bulldozer is a high performance multi core architecture module for positioning server processor of the platform, the representative works of FX8150 has 8 integer arithmetic and 4 floating-point operations, huge cache and ring out of order line and put it on the server with multi input and multi output field has an absolute advantage.
- Q:What is the working principle of a vibratory pile driver?
- Vibratory pile driver is to use high frequency vibration to vibrate the pile body with high acceleration to transfer the vertical vibration of the pile to the pile body, so that the soil structure around the pile changes because of the vibration and the strength decreases.
- Q:How much is a small pile driver with a 15 meter depth? When can I get a discount?
- You see the house of small housing foundation piling is large area, much need to play a play pile, deep foundation piling are in accordance with the meter to calculate, how much money is one meter, the general area of different prices in different regions, like Changsha, is about 150-200 meters.
- Q:such as bulldozers, pile drivers, cranes and cement mixers?
- Promote。 As for Chinese chopsticks, fork to foreigners, the Xu
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
ZYC100 Used Pile Driver Hydraulic Static Pile Driver Machine for Sale
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords