• ZYC100 Used Pile Driver Hydraulic Static Pile Driver Machine for Sale System 1
  • ZYC100 Used Pile Driver Hydraulic Static Pile Driver Machine for Sale System 2
  • ZYC100 Used Pile Driver Hydraulic Static Pile Driver Machine for Sale System 3
ZYC100 Used Pile Driver Hydraulic Static Pile Driver Machine for Sale

ZYC100 Used Pile Driver Hydraulic Static Pile Driver Machine for Sale

Ref Price:
$200,000.00 - 500,000.00 / unit get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

ZYC100 Used Pile Driver Hydraulic Static Pile Driver Machine for Sale




ZYC100 Used Pile Driver Hydraulic Static Pile Driver Machine for Sale

ZYC100 Used Pile Driver Hydraulic Static Pile Driver Machine for Sale



 

Lower Energy Consumption:

>>We use variable hydraulic systems with low   loss and constant power in this series of products, so that energy   consumption decreases by 30% and working efficiency increase by 60%.

 


 

High Efficiency:

>>To ensure the high working efficiency of the   whole machine, we use hydraulic systems with big power and great flow, the   pile driving mechanism with multi-speed control and being quick in getting   ready for operation.

 


 

High Reliability:

>>To ensure the high reliability of our   products which engineering machines should possess, we improve the design and   use very reliable materials or components which we select carefully in the   process of purchasing.
  >>For example we use inverted cylinder as a supporting leg which has   become a patent in our country so as to avoid the easy breakage of cylinder   which was the case with traditional design.


 
 

 


 

Convenience in dismantling, transportation and   maintenance:

>>Since we have constantly improved our design   of pile drivers for more than 10 years, every part of the machine is easy to   be taken apart, which provides convenience in transportation and maintenance. 
  >>Compared with the pile drivers made by other companies, ours are more   convenient to be taken apart and shipped as the connection and lay out of the   long boat and the short boat are different.
  >>Take the driver's cab for example; it can be opened at the middle so   that the lifting arm of the crane can pass through it during transportation.   Besides, the side piling mechanism can be taken off so as to reduce the   length of machine to be shipped and greatly reduce the weight of separated   units in transportation.


 
 

 


 

Multi-function:

>>Our products are multi-function static   hydraulic pile drivers with embracing pile driving, top-pressing pile driving   or both at the same time because they are well combined with each other.
  >>Our products have bigger capacity of side piling and corner piling   than those of other companies, and the power of side or corner piling reaches   60% of the middle piling.
  >>Our pile drivers can work with a variety of piles, square piles or   round piles or other shape of steel piles, no matter thin-walled round   concrete piles or thick-walled ones.

 


 

Systemization and Maximization:

>>Our company has developed 14 models of pile   drivers with the capacity of 60 tons to 1200 tons and each model is   classified into 4 kinds according to its function with the maximum tonnage of   1200.


 
 

 


 

Flexibility in Designing:

>>To keep up with the development in the   engineering machinery of the world, we will integrate all useful high   technologies from machine-building, electricity, hydromechanics and   electronics into our products and meet different individual needs of our customers. 
  >>For example, we can, if any customer requires, install a   position-controller for the crane, and a digital screen showing the tonnage   of piling force, etc.


 
 

 


 


Two Patents:

>>The design of inverted cylinder as a   supporting leg which avoids the radial force on the piston extends the   life-time Of the cylinder. 
  The patent number is ZL01249443.7.
  >>Embracing pile driving or top-pressing pile driving or both are used   in operation with one machine. 
  The patent Number is ZL02139875.5.


Parameter/ModelZYC100
Rate piling pressure(KN)1000
Piling speed(m/min)Fast10.0
Low2.0
Piling stroke(m)1.6
Pace(m)Longitudinal1.6
Horizontal0.5
Angle range(°)15
Rise stroke(m)1.45
Square pile(mm)Max350
Circle pile(mm)Max350
Side piling(mm)450
Corner piling space(mm)900
Lifting weight(t)8.0
Pile hanging length(m)12.0
Power(KW)Piling37
Lifting11
Main dimension(m)Work length6.65
Work width4.20
Transpot height2.70
Total weight(t)100

 

Advantages

1 sincere

CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the outdoor heaters produced by CNBM are compliant with the national level quality.

2 professional

Our engineers will at your services 24hours to answer your questions. Our goal is to provide the best professional services.

3 quality

 CNBM International’s outdoor heater have strict quality control, only the best quality products can pass the test.

4speed

 We have professional sales team to guarantee your reply within 12hours to save your precious time.

5 After sales

If the tower crane has any problems, we will solve your problems in first time.

FAQ

1.Which payment terms can we accept?

  Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.

2.How long will our price be valid?

We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.

3.What are our advantages compared with manufacturers?

a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.

b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.

Company Information

China National Building Materials Group Corporation is the full name of CNBM, which is one of the largest state-owned group in China. In 2013, the total asset of CNBM exceeds US$60 billion dollars with a total staff of 180,000. CNBM is listed in the World Top 500 Enterprises!

CNBM International works as the international platform for CNBM Group. In 2013, our total sales income was more than US$16.8 billion dollars.Every year we import large quantity of iron ore, coking coal and thermal coal etc from India, Brazil, Australia and Russia and other countries.ld'>Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.

Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.

1,Are you trading company or manufacturer?We are professional manufacturer, and our factory mainly produce water well drilling rig, core drilling rig, DTH drilling rig, piling rig, etc. Our products have been exported to more than 50 countries of Asia, South America, Africa, and get a good reputation in the world. 

 

2,Are your products qualified?Yes, our products all have gained ISO certificate,and we have specialized quality inspection department for checking every machine before leaving our factory.  

 

3,How about your machine quality? All of our machines hold the  ISO, QC and TUV certificate, and each set of machine must pass a great number of strict testing in order to offer the best quality to our customers.

 

4,Do you have after service?Yes, we have special service team which will offer you professional guidance. If you need, we can send our engineer to your worksite and provid the training for your staff.

 

5,What about the qaulity warranty? 

 

We offer one-year quality warranty for machines' main body.

 

6,How long can you deliver the machine? 

 

Generallywe can deliver the machine in 7 days. 


 

Q: The distance is 400 meters. Is it possible to use 120 of the aluminum core cable? If not, how much cable should be used? Empty 20How big the cable 250KW piling machine, the distance is 400 meters, can use the aluminum core cable 120, if not, the cable for much, much of the air distribution.
What's more, your distance is 400 meters, the wire reaches full load, so far distance, voltage loss is also very big. Therefore, the proposed use of two 240 square meters of aluminum core cable parallel operation.
Q: Piling machines need to how much money??
Hello, this is not necessarily, because the configuration is not the same, so the charge is not the same!
Q: The difference between diesel pile driver and impact drilling machine
Percussive drill: like percussive drilling, it is drilled out during impact.
Q: What's the difference between a track type diesel pile driver and a crawler diesel pile driver?
3) apply distinctionIn terms of technology, economy and efficiency, their application has its own emphasisTrack type diesel pile driver: generally used for large piles, deep pile, Caterpillar diesel pile driver: generally used for small piles, shallow piles
Q: Which manufacturer is better for highway guardrail and pile driver?
There are many manufacturers of pile drivers now. Do you buy them online or offline?
Q: What are the types of pile drivers? What are the characteristics of each?
This is not clearly defined. It mainly depends on the geological conditions and the superstructure. Who can tell you clearly that it is all Mongolia?.According to the above features you can see, generally divided into two categories, diesel hammer hole, drill hole, Luoyang shovel into the hole is used more, low cost, suitable for Northwest collapsible loess, the pile can eliminate the collapsibility of loess geology, increase the original basis composite bearing capacity. The pipe pile should be chosen according to the address condition, and the construction cost is high. According to the geological difference, sometimes the diesel hammer or drilling machine is needed to carry out the pre boring operation. Rotary drilling drill across the country for a variety of industries (work, the DAB, railways, highways, bridges, etc.), is the best way to operate a single pile.Specific choices are based on geological conditions and superstructure, and geological moisture content is also a key. I am engaged in the foundation construction, any questions contact at any time. Of course, there is a better engineering, ha ha, all kinds of machinery are available, are free equipment, reasonable price appropriate.
Q: I can drive an excavator and a hammer, but I want to learn how to drive a pile driver. How long will it take to learn?
Very quickly, understand the working principle, work methods, basically on the line
Q: what kind of VLV cable is needed, how to determine, after the cable from the low-voltage distribution box out, 460m arrived distribution of electricity 100It's best to explain how to calculate, how to determine the current, and the specifications of the cable, thank you very much!630 of the box changed to the distribution box for the cable, 240 of the cable is single core, or 3*240 cable. What kind of cable can be specific about it? Underground directly buried, directly to a cable model, aluminum core cable
Current of pile driver 5*75=375KW/0.8=468.75KW/380/1.732=712AThe ampacity of the cable is 240 square meters, about 390ASo we need two 240 square parallel.
Q: How do I maintain the hydraulic pile driver I bought?
Pay attention to the following: the type of project to be used; the workload of the project; the geographical environment of the project; and the price the boss expects.
Q: How can I find a pile driver?
Go to the construction site, it is better to have known the construction team, or the construction company pull!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords