CMAX 120B-II Series Hydraulic Static Pile Driver for Sale
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
CMAX Series Hydraulic Static Pile Driver for Sale
ZYJ series hydraulic static pile driver is the product for building pile foundation construction under the independent research and development of our company and with more than 10 national patented technologies. It is a novel environmentally friendly construction equipment characterized by no pollution, no noise, no vibration, fast pressing of pile as well as high pile quality, and represents the development direction of piling machinery. Since mass production, its domestic market share has been firmly first, and our company has become a professional enterprise with research and development, production and sales of domestic pile machine taking the lead. The product won the second prize of the State Scientific and Technological Progress Award in 2003, becoming the famous-brand product of Hunan. Our company participated in drafting the Hydraulic Pile Driver industrial standard (JB/T11674 2013), which greatly promotes the development and progress of technology of static pile driver and pipe pile industry in China. Our company completed the upgrading of product design in 2013 to comprehensively improve the configuration, performance and quality, and the products are well welcomed and praised by the customers since it was put on the market.
Feature:
1. High-efficiency and energy-saving piling system with quasi constant power
2. Humanized driver cab and concise and clear control console
3. Piling oil cylinder and motor pump set with scientific and reasonable matching
4. Patented technology - fast return of piling oil cylinder
5. Clear and simple hydraulic piping layout
6. Patented technology - multipoint pressure-equalizing gripper mechanism
7. Unique "side piling and angle piling" device
8. Steel H-shaped pile can be pressed into the trapezoidal and triangular piles according to customer requirements.
9. Simple structure and easy transport
10. New hydraulic walking chassis
11. New patent – side piling device
Parameter | ZYJ120B-II | |
---|---|---|
Dimension | Length mm | 9465 |
Width mm | 4100 | |
Height mm | 3650 | |
tf Max.piling force | 122 | |
m/min Max.piling speed | 6.2 | |
Travel Capacity | Lengthwise m | 1.6 |
Widthwise m | 0.4 | |
Angel ° | 11 | |
标配起重机Standard crane model | QY8(13m) | |
Grounding Pressure | (Kpa)Long ship | 108 |
(Kpa)Short ship | 128 | |
Side pile distance mm | 590 | |
Comer pile distance mm | 1550 | |
Max round pile mm | 350 | |
Max square pile mm | 350 |
Cases
FAQ
1.Which payment terms can we accept?
Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.
2.How long will our price be valid?
We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.
3.What are our advantages compared with manufacturers?
a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.
b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.
- Q:PV pile driver
- The PV pile driver has both wheel and track components. The tracks are divided into generators and full hydraulic ones.
- Q:But in a few days, wait for the water to ease up, and plug it directly with earth rockIs there no way directly to seal the breach?
- You can Liyang new micro piling equipment factory Ding directly copied to the Baidu searchIf necessary, I can forward it to you and can contact directly for details.
- Q:Why do some people need to dig the foundation and pile it up to dig a hole?
- First of all, depends on the type of your pile, prefabricated or bored pile.If it is a bored pile, then it is obvious to dig first.If it is a prefabricated pile, then pile it directly, then dig it.
- Q:Why should the pile foundation be excavated after the pile driving?
- The construction of the pile foundation shall be done by piling and excavating the earth as follows:The first excavation, construction and basement, excavation depth from plus or minus 00 may have a depth of 4 meters, 4 meters below the ground, the general quality is difficult to ensure, at this time it is difficult to support the ground operation requirements, especially when the mechanical operation. It is difficult to estimate the change of groundwater, the coming of rainy season, and the cost and time of these external factors will be played directly as compared with the original ground.In general, the plant should dig the earth before the foundation pit is supported, and then the pile will be made. Concrete car can be outside the pit, by pouring over to the bottom of the pit. Of course, if the surface of the excavation is silt layer / or below the shallow water level is special. If the deep foundation pit is used, it is better to dig the soil first and then make the pile, so the concrete pouring is not a problem.The soft soil area must have been dug before and after, for a very simple reason. Soft soil generally has a hard surface layer, so that it is conducive to the movement and construction of pile foundation. If there is no hard surface on the surface, then make the cast-in-place bottom and then pile the pile. In addition, the foundation pit supporting in the soft soil area is a relatively difficult and easy to occur accident process, and the construction grouting pile will certainly affect the excavation and support of basement, and the mud pool will not know where to put it.
- Q:A pile driver 1 team can play many 12mI36b steel sheet pile
- According to the geological conditions are different450 pile driverThe number of 9m Larson steel sheet piles is about 100 a day300 times the pile driverTrough sheet steel piles 9m in 200-300 days at a timeGive you a reference: 80 tonsThis is my construction data, I do not know, quasi accurate, you can refer to the next slightly!
- Q:say no money, the machine is more expensive, but still busy every day do not win, do not know is true or false?
- It must be very profitable, cheat you, afraid you buy
- Q:Pile driver, pile, cylinder, oil seal installed, there is no positive and negative
- Yes, no, you can take pictures before changing the seal, then change the seal.
- Q:Diesel hammer piling machine principle
- The guide rod type diesel hammer is pressed on the pile cap with a plunger as a hammer seat, and the cylinder is used as a hammer head to move up and down along the two guide rods.When in operation, the pile hanging in place pile frame in Longmen, then put the diesel hammer at the top of the pile, the hook will lift down the cylinder, and the cylinder sleeve off hook to the whereabouts of the piston, the cylinder will be closed in the air compression cylinder rocker pin until the pressure continues to fall outside the cylinder pushing hammer on the base of the fuel pump, fuel pump will be injected into the cylinder oil mist, oil mist meet high temperature gas burning immediately above, blasting, explosive shock down pile., to push the cylinder to cylinder to rise, fall along the guide rod, and the beginning of the second impact cycle.
- Q:How much is the average cost of piling a metre?.Construction Engineering piling machine how much money? (can be more than 30) piling generally hit a meter, what is the cost?. How much can I pay for a metre? What's the procedure for piling operators?
- Need fifty or so, a twenty meters stake will not exceed one thousand dollars, the operation of pile machine need pile machine driver's license, also can hang some of the company's account.
- Q:The piling machine and the appearance are not considered as large machinery import and export fields
- See what kind of bar! If it is a small blue ocean highway, the pile driver is not large, even if the loading type. The foundation pile driver is different from the other machines and should be counted
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
CMAX 120B-II Series Hydraulic Static Pile Driver for Sale
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords