• ZYC180 Hydraulic Static Pile Driver for Sale System 1
  • ZYC180 Hydraulic Static Pile Driver for Sale System 2
  • ZYC180 Hydraulic Static Pile Driver for Sale System 3
  • ZYC180 Hydraulic Static Pile Driver for Sale System 4
  • ZYC180 Hydraulic Static Pile Driver for Sale System 5
ZYC180 Hydraulic Static Pile Driver for Sale

ZYC180 Hydraulic Static Pile Driver for Sale

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

ZYC180 Hydraulic Static Pile Driver for Sale

 

Lower Energy Consumption:

>>We use variable hydraulic systems with low   loss and constant power in this series of products, so that energy   consumption decreases by 30% and working efficiency increase by 60%.

 

 

High Efficiency:

>>To ensure the high working efficiency of the   whole machine, we use hydraulic systems with big power and great flow, the   pile driving mechanism with multi-speed control and being quick in getting   ready for operation.

 

 

High Reliability:

>>To ensure the high reliability of our   products which engineering machines should possess, we improve the design and   use very reliable materials or components which we select carefully in the   process of purchasing.
  >>For example we use inverted cylinder as a supporting leg which has   become a patent in our country so as to avoid the easy breakage of cylinder   which was the case with traditional design.


 
 

 

 

Convenience in dismantling, transportation and   maintenance:

>>Since we have constantly improved our design   of pile drivers for more than 10 years, every part of the machine is easy to   be taken apart, which provides convenience in transportation and maintenance. 
  >>Compared with the pile drivers made by other companies, ours are more   convenient to be taken apart and shipped as the connection and lay out of the   long boat and the short boat are different.
  >>Take the driver's cab for example; it can be opened at the middle so   that the lifting arm of the crane can pass through it during transportation.   Besides, the side piling mechanism can be taken off so as to reduce the   length of machine to be shipped and greatly reduce the weight of separated   units in transportation.


 
 

 

 

Multi-function:

>>Our products are multi-function static   hydraulic pile drivers with embracing pile driving, top-pressing pile driving   or both at the same time because they are well combined with each other.
  >>Our products have bigger capacity of side piling and corner piling   than those of other companies, and the power of side or corner piling reaches   60% of the middle piling.
  >>Our pile drivers can work with a variety of piles, square piles or   round piles or other shape of steel piles, no matter thin-walled round   concrete piles or thick-walled ones.

 

 

Systemization and Maximization:

>>Our company has developed 14 models of pile   drivers with the capacity of 60 tons to 1200 tons and each model is   classified into 4 kinds according to its function with the maximum tonnage of   1200.


 
 

 

 

Flexibility in Designing:

>>To keep up with the development in the   engineering machinery of the world, we will integrate all useful high   technologies from machine-building, electricity, hydromechanics and   electronics into our products and meet different individual needs of our customers. 
  >>For example, we can, if any customer requires, install a   position-controller for the crane, and a digital screen showing the tonnage   of piling force, etc.


 
 

 

 

Two Patents:

>>The design of inverted cylinder as a   supporting leg which avoids the radial force on the piston extends the   life-time Of the cylinder. 
  The patent number is ZL01249443.7.
  >>Embracing pile driving or top-pressing pile driving or both are used   in operation with one machine. 
  The patent Number is ZL02139875.5.

Parameter/ModelZYC180
Rate piling pressure(KN)1800
Piling speed(m/min)Fast11.0
Low2.7
Piling stroke(m)1.8
Pace(m)Longitudinal2.4
Horizontal0.6
Angle range(°)15
Rise stroke(m)1.0
Square pile(mm)Max500
Circle pile(mm)Max500
Side piling(mm)950
Corner piling space(mm)1900
Lifting weight(t)8.0
Pile hanging length(m)12
Power(KW)Piling60
Lifting22
Main dimension(m)Work length10.30
Work width5.9
Transpot height2.9
Total weight(t)180

 

FAQ

1.Which payment terms can we accept?

  Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.

2.How long will our price be valid?

We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.

3.What are our advantages compared with manufacturers?

a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.

b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.

 

Advantages

1 sincere

CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the outdoor heaters produced by CNBM are compliant with the national level quality.

2 professional

Our engineers will at your services 24hours to answer your questions. Our goal is to provide the best professional services.

3 quality

 CNBM International’s outdoor heater have strict quality control, only the best quality products can pass the test.

4speed

 We have professional sales team to guarantee your reply within 12hours to save your precious time.

5 After sales

If the tower crane has any problems, we will solve your problems in first time.

 

Company Information

China National Building Materials Group Corporation is the full name of CNBM, which is one of the largest state-owned group in China. In 2013, the total asset of CNBM exceeds US$60 billion dollars with a total staff of 180,000. CNBM is listed in the World Top 500 Enterprises!

CNBM International works as the international platform for CNBM Group. In 2013, our total sales income was more than US$16.8 billion dollars.Every year we import large quantity of iron ore, coking coal and thermal coal etc from India, Brazil, Australia and Russia and other countries.ld'>Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.

Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.


 

Q: Is the piling machine dangerous?
Technical activity, not too dangerous, because I have seen others piling, the work environment is rather bitter, hot days, but also with a pile machine, there, one by one! The difficulty is not too great!
Q: What's the special use of a pile driver?
Moreover, the torque of the hydraulic power head is 2-3 times as much as that of the ordinary three ring power head. It is more suitable for complex formation than the traditional long spiral, and the construction efficiency is more efficient. Long spiral drill in the type piling machine is the use of a more extensive, and for starting current understanding, we can get better in the construction layout, so as to avoid the occurrence of the voltage is not enough at the time of construction.
Q: Pile foundation
At the bottom of the drill bit, when rotating, the soil layer becomes loose and becomes slag. It is suspended by mud and overflowed with mud. The well wall is protected by water head and mud. Reverse circulation rotary drilling: the mud flows into the borehole from the mud pool and is mixed with drilling slag. Suction role in vacuum pump, drill into a slag mixture into the mouth, through the drill pipe, and a slurry pump debris control raft excreted into the sedimentation tank cleaning, for further use. Because the bore diameter of drill pipe is much smaller than that of well bore, the water slurry in drill pipe is increased by 4~5 times faster than that of positive circle, and it is dominant in drilling hole of bridge drilling pile.
Q: How much voltage does a tower crane need, and how much voltage does the 160A meter equal?
The site of the hydraulic piling machine and crane are in need of three-phase power supply of 380/220V, the general piling machine power is about 40KW, the crane power is about 70KW, so probably need 110~130KW power, three-phase 160A meter can take 105KW, general electric meter overload ability than the wall, with 1 sets of hydraulic piling machines and 1 sets of tower crane very reluctantly can.
Q: How much is a small pile driver with a 15 meter depth? When can I get a discount?
A is specialized in Matlock piling machine, there are a variety of support, help you money... In Matlock is south of the Yangtze River's first professional production of piling.
Q: All say that it is a solid foundation, anti settlement, but what is the specific principle of the ah? To the ground where a few concrete pillars will be able to prevent settlement?
Such as poor soil, unable to bear the upper part of the building, the pile buried in the formation of soil and interaction of piled up foundation, bearing capacity, can be based on natural.There are anti uplift pile, and some pure underground garage, underground water buoyancy force, piling after the friction between the pile and soil to resist water buoyancy
Q: Demolition houses use pile driving machines to smash the cement columns and cause great noise. Which department can I complain to?
2, construction noise (refers to the construction process caused by interference surrounding the living environment sound)3, traffic noise (refers to motor vehicles, railway locomotives, motor vehicles, aircraft and other means of transport in the operation of the interference caused by the surrounding living environment sound)Three, in addition, industrial noise and construction noise pollution can be complained to the municipal environmental protection bureau.Four, the noise pollution caused by traffic can be complained to the specific functional departments.1 if the motor vehicle does not use the acoustic device in accordance with the regulations, the local public security organ shall give a warning or impose a fine on the basis of the circumstances.2. If a mobile vessel has any illegal acts of noise, the harbour superintendency administration shall give a warning or impose a fine in accordance with the circumstances.3 if the railway locomotive has any illegal acts of noise, the competent department of railways shall give administrative sanctions to the person responsible for it.However, around your environment if there is noise pollution, affecting the lives of the residents, the public can directly call 110 to report to the 110 command center will be based on public security, urban management, environmental protection departments issued instructions, asked relevant departments to exercise the functions of personnel.Hope to adopt, thank you.
Q: How much is the average cost of piling a metre?.Construction Engineering piling machine how much money? (can be more than 30) piling generally hit a meter, what is the cost?. How much can I pay for a metre? What's the procedure for piling operators?
Need fifty or so, a twenty meters stake will not exceed one thousand dollars, the operation of pile machine need pile machine driver's license, also can hang some of the company's account.
Q: What is a car pile driver? I hear it's easy to use.
Yeah, yeah. You're talking about wheels. I am now using a wheeled screw, not only easy to move, the speed is very fast, is a powerful brand of Shandong piling machine, also known as force pile driver.
Q: Amd pile driver with motherboard, motherboard chipset is 970 or 990fx?
If you match more than 600 of the FX6300 series, it is better to use i3+B85, multi-threaded performance is slightly worse, but heating, power consumption is low.Of course, 970+FX8300 can also be replaced by i5+B85, AMD's high-end performance is not as good as high-end intel.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords