• ZYB Series Hydraulic Static Pile Driver  ZYB240 System 1
  • ZYB Series Hydraulic Static Pile Driver  ZYB240 System 2
  • ZYB Series Hydraulic Static Pile Driver  ZYB240 System 3
  • ZYB Series Hydraulic Static Pile Driver  ZYB240 System 4
ZYB Series Hydraulic Static Pile Driver  ZYB240

ZYB Series Hydraulic Static Pile Driver ZYB240

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  

Summary

Hydraulicstatic pile-pressing driver has already been widely applied in the precastpile construction of building foundation, bridge foundation,airport foundation,roadbed of railroads and trackless roads,because it can drive piles with rapid, no noise pollution ,no exhaust gaspollution and no mud pollution. Nowadays,many cities provide that it only allowed static pile-pressing driver to implement the pile foundation construction in the downtown,Hydraulicstatic pile-pressing driveris in process of replacement others traditional side-piling mechanism.

 

Since the beginning of 1990 year, the ZYB series hydraulic static pile-pressing driverwith 7 patents was succeeded in production by the Hydraulic Machine and Control Technology Research Institute of CSU which supports Changhe with its technology)。Today,ZYB series hydraulic static pile-pressing driverhas developed into the 13th generation “M” model, which can meet with the request of piling force from 80 to 1500 ton, the pile diameter is range from 300-1000mm,the square pile is range from 150-1000mm.Corresponding, the single pile loading ability reaches to 40~750 ton and is in the lead of international technology.

 

Main Performance

  1. It is the fastest pile-pressing driver in China and has a record of 1700m piling one day.

  2. It is the only pile-pressing driver in China which supporting cylinder is independent from supporting legs,consequently the supporting cylinder rod doesn’t need to endure horizontal force.

  3. It is the only pile-pressing driver in China whichdriving forces are directly transferred to the clamping jaw instead of clamping cylinder,so the service life of its clamping cylinder is increased more than several times .

  4.  It is the only pile-pressing driver in China which makes pile keep automatically parallel  with guiding rail and which four guiding rails are welded as a body in order to keep the four guiding rails parallel forever.

  5. It is the only pile-pressing driver in China which uses big oil-sucking-up pipe for oil sucking up and oil cooling.

  6. It is the only pile-pressing driver in China which uses alloy steel in body for large tonnage machine.

  7. It is the only pile-pressing driver in China which has a patent of accelerated pile-driving system .

  8. Optimal structure design according to theory of fatigue strength ensures the fatigue life longer than 15 years.

  9. Compared with other hydraulic static pile-pressing driver in China,the contact area between clamping jaw and pile increases over 1 time,The jaw-clamping pressure drop over 50% which can prevent pile from being damaged by clamping jaw for too much jaw-clamping pressure .

  10.  Compared with other hydraulic static pile-pressing driver in China,Changhe has reasonable special design of the clamping and pile-driving cylinder. Clamping cylinder effective working area is increased over 20% which ensures pile clamping reliable.

  11. Counterweight beam is on the outer side of the supporting leg cylinder,compared with counterweight beam inside of the supporting leg cylinder, the place for counterweight increase 40% and the max force born by body reduce 20%.

  12. ZYB series hydraulic static pile-pressing driver using pressure compensation type automatic variable pump  realizes constant power output, so there no working overflow power loss

  13. Special hydraulic pipeline and cooling system makes pile-pressing driver can work normally in any temperature.

  14. The close oil injecting and filtrating system makes oil injecting and filtering very convenient and be free from pollution.

  15. Compared with other hydraulic static pile-pressing driver in China,its rotary platform is about one meter longer,this can increase the steady of machine when the short-feet support the body.

  16. The structure of net-shaped rib in long feet and short feet guarantee that there are at least two rib in feet confront the pile head when feet stepped on Φ400 pile head ,the penetration-resisting ability is improved by about 40%.

  17. the crane of pile-pressing driver can hoist its long feet and short feet.

  18. Compared with others side piling mechanism, ZYB’s side piling system and body is a whole,this structure arises its strength and rigidity by 30%~50%

  19. Compared with other hydraulic static pile-pressing driver in China, the distance between ZYB’s side piling center and the nearest supporting leg reduces  by at least 50%。Under the same counterweight condition,ZYB side pile driving ability raises by at least 20%.

  20. Oil pump station is positioned within working range of crane. Compare with the oil pumps station positioned under operation cabin,the maintaining service time for oil pump station is reduce 80%

  21. Compared with bifid ball head gland and connection by bolt and tapped hole in ball head base used in other hydraulic static pile-pressing driver in China,ZYB use integral ball head gland and connection by bolt and nut。Firstly,it can avoid ball head jump from the ball head gland;Secondly,it can avoid  the damage of ball head’s tapped hole in ball head base, it needs spend 300 times cost to replace ball head base.

  22. compared with the whole Walking trolley with the axles and trolley carrier welded as a whole used in other hydraulic static pile-pressing driver in China,ZYB’s axles is movable from trolley carrier. If the axles is damaged,it need to only replace axles,rather than to spend 10 times cost to replace the whole trolley.

  23. Compared with others hydraulic static pile-pressing driver in China, 680 model and 800 model of ZYB’s pile-pressing driver is equipped 20 ton crane,the capacity of crane increase by 20%.

     

Patented Technology

1. The patented pile-clamping mechanism with function of clamping jaw automatic aligning and swing, make the position of clamping jaw adapt to different size and position of piles by itself, minimize damage to the piles. The pile-driving force is directly transfer to clamping jaw from the clamping box, in order to keep the pile clamping cylinder from being damaged by the pile-driving force.

    

2. The patented long-feet-moving mechanism directly driven by double carts prevents the lifting mechanism from easily being damaged by enduring double horizontal force.

 

 3. The patented cantilever articulatingmechanism has the rigidity and strength 30% higher than traditional plug-in cantilever, making the machine more stable to operate and more convenient to transport.

 

4. The patented lifting mechanism with protective sleeve(machine above 420t) or upside down(machine below 360t) prevents piston-rods of cylinders from enduring horizontal forces and consequently brings them longer operating life.

 

5. The patented multi-grad control of pile driving velocity doubles the piling speed..

 

6. The patented auto-replacement mechanism of traverse and rotary motion automatically keeps the rails of the short feet being parallel all the time and protects the machine from being damaged.

7. The patented pile-clamping mechanism with clamping cylinder axial driving and replacement of radial spring, makes 8 clamping jaw structure come true and more reliable. Every two basic tubular jaws drive one square jaw with a replacement of radial spring, aiming at clamping the square pile. The pile-driving force is directly transfer to clamping jaw from the clamping box, in order to keep the pile clamping cylinder from being damaged by the pile-driving force.

 

 

Application Case

                    

           ZYB120K-B Working in Singapore                                               ZYB120 Working in Indonesia

 

Transportation Show

                 

 

         

 

Parameter-ZYB240

Max piling pressure(tf)

240

Max theory piling speed(m/min)

9.4

Piling stroke(m)

2

Grades of piling

4

Longitudinal shift (m)

2.4

Rise/down stroke(m)

1.05

Horizontal shift(m)

0.55

Max oil pressure of main machine(MPA)

23.4

Angle range(°)

14

Max oil pressure of crane (MPA)

20

Theory flow of main machine(l/min)

232

Theory flow of crane(l/min)

91

Electrical motor power(KW)

2*30+15+3.0

Fit square pile specification

F250-400

Fit round pile specification

¢300-400

Dimension of short boat(m×m)

2.8×4.2

Dimension of long boat(m×m)

11.8×1.0

Ground pressure ratio of short boat

10.2

Ground pressure ratio of long boat

10.2

Total weight of machine(t)

98/100

 

 

Q: Is the spiral pile driver still being dug? Is it easy to operate? How many people do you need?
Electrical walking, walking, engines, three ways of walking! Fully intelligent operation, manual to point, after the end of the automatic down, operators drink tea, put the work dry.
Q: Why should I pull it up a few times? Because the friction should stop gradually
This problem is very simple, you just don't know it. The working principle of diesel hammer, hammer force pull up several times in the ignition, ignition after diesel combustion explosive can put the hammer from the top, the hammer reaches a certain height to fall under gravity, in the moment of contact pressure the light diesel (compression diesel can make its combustion is its characteristics), and was the top hammer, again and again.
Q: How deep can a pile driver work?
The deepest foundation piling machine can hit 20 meters, five or six floors are generally enough, in a special customer service Huilong piling machine three insurance contract, you can personally to visit the company, can also visit the construction site.
Q: What are the main types of pile drivers?
And fuel injection, explosion, shock, ventilation and other work. The work is to rely on diesel hammer compression ignition diesel to start, it is necessary to ensure the cylinder seal The gas reaches a certain compression ratio, sometimes piling in soft soil layer is often because the reaction is too small, the amount of compression is not sufficient to ignite the initiation, you need to use multiple hook lift hammer decoupling impact, to start. The hammer seat diesel hammer with a fuel injection pump, fuel tank, cooling water tank and the pile cap. Play between the piston and the cylinder with elastic piston ring seal.x0d four hydraulic hammer x0d diesel oil to start with, the pressure into motivation, according to different soil hydraulic impact force to achieve the adjustment, the appropriate piling, is a new type of piling machine. Small and medium sized hydraulic piling machine, piling commonly used in the highway guardrail, highway guardrail construction. Similar piling equipment: hydraulic piling machine, highway guardrail, piling machine, piling machine road drill.
Q: AMD FX 8350 eight core CPU AM3+ piling machine and tin box what is the difference between the master pointing
But I don't think AMD's best CPU is comfortable with 3 generations of I5. Convert video files, 8 kernel conversions, 5 loads, and 5 88%-93% loads. But the AMD platform, CPU, is a good game to play.But you do not tangle FX8350 and CPU tin boxes are the same, only the original box packing box fan is different these can ignore the FX8350 are on separate heat.
Q: The pile driving team has many years of piling experience, to undertake the construction of large and small piles, includingKongguanzhu
To consider how the site can take back the unearthed excavation method is ABC pile test done to dig a long tight schedule but also increase the test equipment such as AC two AC after completion of the test sequence can also do a ramp to the middle of the excavation
Q: is it a good comment or a bad review? What does a pile driver mean? Good, bad?
AMD is a company specializing in research and development of high performance processor sales company, bulldozer is a high performance multi core architecture module for positioning server processor of the platform, the representative works of FX8150 has 8 integer arithmetic and 4 floating-point operations, huge cache and ring out of order line and put it on the server with multi input and multi output field has an absolute advantage.
Q: Can the piling machine be built at night?
In principle, it is not allowed to work at night, unless it does not affect anyone's life, study and work, and does not constitute noise pollution.
Q: What does a driver of a pile driver do? Playing in the sky?
To serve as the foundation of the buildingThere are many types of pile driversThe operator works in the ground operating room
Q: What's the profit of a pile driver for a day at the site?
(piling machine, personal advice or buy a wylong they do a professional piling installed this piece, there must be protection of key customer service quality, considerate service, what problems can timely door-to-door service, this point is very important). To goods than three, can not blindly pursue cheap, otherwise it is easier to lose than gain. To pursue a low in the high quality, cost-effective high is really good.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords