• CMAX 600B-II Series Hydraulic Static Pile Driver for Sale System 1
  • CMAX 600B-II Series Hydraulic Static Pile Driver for Sale System 2
  • CMAX 600B-II Series Hydraulic Static Pile Driver for Sale System 3
  • CMAX 600B-II Series Hydraulic Static Pile Driver for Sale System 4
  • CMAX 600B-II Series Hydraulic Static Pile Driver for Sale System 5
CMAX 600B-II Series Hydraulic Static Pile Driver for Sale

CMAX 600B-II Series Hydraulic Static Pile Driver for Sale

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

CMAX Series Hydraulic Static Pile Driver for Sale

ZYJ series hydraulic static pile driver is the product for building pile foundation construction under the independent research and development of our company and with more than 10 national patented technologies. It is a novel environmentally friendly construction equipment characterized by no pollution, no noise, no vibration, fast pressing of pile as well as high pile quality, and represents the development direction of piling machinery. Since mass production, its domestic market share has been firmly first, and our company has become a professional enterprise with research and development, production and sales of domestic pile machine taking the lead. The product won the second prize of the State Scientific and Technological Progress Award in 2003, becoming the famous-brand product of Hunan. Our company participated in drafting the Hydraulic Pile Driver industrial standard (JB/T11674 2013), which greatly promotes the development and progress of technology of static pile driver and pipe pile industry in China. Our company completed the upgrading of product design in 2013 to comprehensively improve the configuration, performance and quality, and the products are well welcomed and praised by the customers since it was put on the market.

 

Feature:

1. High-efficiency and energy-saving piling system with quasi constant power

2. Humanized driver cab and concise and clear control console

3. Piling oil cylinder and motor pump set with scientific and reasonable matching

4. Patented technology - fast return of piling oil cylinder

5. Clear and simple hydraulic piping layout

6. Patented technology - multipoint pressure-equalizing gripper mechanism

7. Unique "side piling and angle piling" device

8. Steel H-shaped pile can be pressed into the trapezoidal and triangular piles according to customer requirements.

9. Simple structure and easy transport

10. New hydraulic walking chassis

11. New patent – side piling device


 ParameterZYJ600B-II
Dimension Length mm 13500
 Width mm 7860
 Height mm 2950
tf Max.piling force625
m/min Max.piling speed5.8
Travel CapacityLengthwise m 3.6
Widthwise m0.6
Angel °
Standard crane modelQY16C
Grounding Pressure(Kpa)Long ship132
(Kpa)Short ship162
Side pile distance mm600
Comer pile distance mm1100
Max round pile mm600
Max square pile mm600/450(6014)

Cases


FAQ

1.Which payment terms can we accept?

  Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.

2.How long will our price be valid?

We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.

3.What are our advantages compared with manufacturers?

a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.

b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.

Q: How much is the man-machine charge of the percussive drilling pile driver per meter?
Hello, impact drilling pile driver is about one hundred thousand and one sets, the specific depends on how big you hit the pile, the specific configuration, Nantong punching pile machine factory specializing in the production of punching piling machine, hand impact drill, hoist.
Q: What are the preparations for the piling site?
1, the pile position determination: according to the project provided by the construction unit and the pile axis location map of pile location, pile location must be accurate, and in the pile position by a soldering iron drilling, hole depth is 15~20cm, filled with lime, prevent in the process of driving the wrong pile.2. Pile up(1) pile stacking shall be determined by pile driving route and pile driving sequence(2) the site shall be level and level with three passes and one leveling. Remove obstacles in the ground, underground and air in the range of the moving of the pile driver. The wooden posts and the pile rings shall be of the same position, except for the contact between the pile and the pile, and nothing else shall be in contact with the pile so as to prevent cracks in the pile.(3) the strength of reinforced concrete precast piles must be up to 100% before they can be transported and piled3, the selection of pile machineAccording to the design of single pile bearing capacity and pile length, this project intends to use hammer weight 2.5t track type diesel pile driver.
Q: But in a few days, wait for the water to ease up, and plug it directly with earth rockIs there no way directly to seal the breach?
18:30 on June 21, 2010, Nadekawa sang Kay dike burst. On the morning of June 22nd, the measured changkai dike burst width of 340 meters. 25 days 12 when monitoring data: diwai water level 36.08 meters, 35.90 meters, the water level was an average depth of 4.06 meters, the water area of 1170 square meters, the average flow of 1280 cubic meters per second, the flow rate of 1.09 meters per second. (excerpt from: Fuzhou Hydrological Bureau Author: Liu Jianming)From 18:30 on June 21st to 25, 12, that is, in 90 hours after the average flow rate of 1.09 meters per second, it is estimated that within 24 hours of the dike burst, the average flow rate should be 5~8 meters per second or higher. And the average depth of 4.06 meters, according to the wooden pile into the water 3 meters, 1 meters above the surface, the length of the stakes should be no less than 8 meters.
Q: How to operate the excavator pile driver?
In fact, it's not complicated. It's similar to a broken hammer. The big clip in front is like a broken hammer or an ordinary digging bucket. There is a button to control the vibration, which is very close to the hammer.
Q: Should the starting current be considered when the piling machine is in use?
There are two main types of pile driver used at present: diesel hammer pile driver and long spiral drilling rig.In general, long spiral ring power head motor starting current depends on the specific circumstances, if the full voltage starting with load, the starting current is 5-7 times the rated current of the power supply. The construction of their equipment. In addition to see how much power head in the face of tricyclic sticking case, two start if exceeds the rated current of it easily after all, a burning motor, power head is not cheap, suggest to consider all hydraulic power head, the power head is three was a bit expensive, but in the face of the card when drilling, two times can start easily and smoothly, the impact of the power grid is very small. Moreover, the torque of the hydraulic power head is 2-3 times as much as that of the ordinary three ring power head. It is more suitable for complex formation than the traditional long spiral, and the construction efficiency is more efficient. Long spiral drill in the type piling machine is the use of a more extensive, and for starting current understanding, we can get better in the construction layout, so as to avoid the occurrence of the voltage is not enough at the time of construction.
Q: How many hours will it take for the 200 piles and the 1 pile drivers?
200 piles of 1 piling machine is generally need 19 day time is finished, also need 152 hours to complete.
Q: Want to mortgage a hydraulic pile driver?. Excuse me, what brand, what tonnage is more competitive?.Could you introduce the profit, expense, cash flow of piling machine, the more detailed, the better.
Qingyuan Xin Feng Machinery Factory production of 2 Taiwan good ~ we are the brand ~ I just listen to my father said that the specific amount should be 200 thousand ~ a ~ details of your advice of high manager soldiers accounted for ~ should Baidu can be found in the.
Q: How much money in a pile driver Huilong piling machine price?
In a spiral track Matlock advantage:1 、 simple operation, one hole forming,2, fast, 3-5 minutes can become holes 5 meters3, the maximum diameter of the hole 800mm, the maximum hole depth of 10m, suitable for housing construction, highway, high-speed rail slope protection and other pile foundation construction4, special, mobile convenient, 360 degrees of free rotation5, firewood and electricity dual-use, reduce cost expensesA Hui Omron caterpillar rotary drilling rig advantage:1, the fastest 20 minutes, you can dig 5-8 meters of earth drilling2, drilling can break strong weathering rock layer3, the well-known brand of the engine, "Yuchai, Weichai, fuel consumption of 40-50 yuan per hour.4 、 selection of multi-functional parts, such as: Clay bit, sand fishing drill, bottom drill bit, easy to change, practical.
Q: What are the general safety hazards of temporary power and piling machines in the construction site?
General sites are! Lose cable! High voltage electricity wounding! Poor site results in equipment tilting
Q: My home behind the plant in piling, the distance is about 25 meters, when piling not only hear the sound, even the house seems to be in the earthquake, how many distance from the house safe?
We also met this kind of situation, homeowners simply forced the construction team construction method (modified by rotary drilling operation).

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords