• ZYC240 Hydraulic Static Pile Driver for Sale System 1
  • ZYC240 Hydraulic Static Pile Driver for Sale System 2
  • ZYC240 Hydraulic Static Pile Driver for Sale System 3
ZYC240 Hydraulic Static Pile Driver for Sale

ZYC240 Hydraulic Static Pile Driver for Sale

Ref Price:
$200,000.00 - 500,000.00 / unit get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

ZYC240 Hydraulic Static Pile Driver for Sale

 

Lower Energy Consumption:

>>We use variable hydraulic systems with low   loss and constant power in this series of products, so that energy   consumption decreases by 30% and working efficiency increase by 60%.

 


 

High Efficiency:

>>To ensure the high working efficiency of the   whole machine, we use hydraulic systems with big power and great flow, the   pile driving mechanism with multi-speed control and being quick in getting   ready for operation.

 


 

High Reliability:

>>To ensure the high reliability of our   products which engineering machines should possess, we improve the design and   use very reliable materials or components which we select carefully in the   process of purchasing.
  >>For example we use inverted cylinder as a supporting leg which has   become a patent in our country so as to avoid the easy breakage of cylinder   which was the case with traditional design.


 
 

 


 

Convenience in dismantling, transportation and   maintenance:

>>Since we have constantly improved our design   of pile drivers for more than 10 years, every part of the machine is easy to   be taken apart, which provides convenience in transportation and maintenance. 
  >>Compared with the pile drivers made by other companies, ours are more   convenient to be taken apart and shipped as the connection and lay out of the   long boat and the short boat are different.
  >>Take the driver's cab for example; it can be opened at the middle so   that the lifting arm of the crane can pass through it during transportation.   Besides, the side piling mechanism can be taken off so as to reduce the   length of machine to be shipped and greatly reduce the weight of separated   units in transportation.


 
 

 


 

Multi-function:

>>Our products are multi-function static   hydraulic pile drivers with embracing pile driving, top-pressing pile driving   or both at the same time because they are well combined with each other.
  >>Our products have bigger capacity of side piling and corner piling   than those of other companies, and the power of side or corner piling reaches   60% of the middle piling.
  >>Our pile drivers can work with a variety of piles, square piles or   round piles or other shape of steel piles, no matter thin-walled round   concrete piles or thick-walled ones.

 


 

Systemization and Maximization:

>>Our company has developed 14 models of pile   drivers with the capacity of 60 tons to 1200 tons and each model is   classified into 4 kinds according to its function with the maximum tonnage of   1200.


 
 

 


 

Flexibility in Designing:

>>To keep up with the development in the   engineering machinery of the world, we will integrate all useful high   technologies from machine-building, electricity, hydromechanics and   electronics into our products and meet different individual needs of our customers. 
  >>For example, we can, if any customer requires, install a   position-controller for the crane, and a digital screen showing the tonnage   of piling force, etc.


 
 

 


 


Two Patents:

>>The design of inverted cylinder as a   supporting leg which avoids the radial force on the piston extends the   life-time Of the cylinder. 
  The patent number is ZL01249443.7.
  >>Embracing pile driving or top-pressing pile driving or both are used   in operation with one machine. 
  The patent Number is ZL02139875.5.


Parameter/ModelZYC240
Rate piling pressure(KN)2400
Piling speed(m/min)Fast7.7
Low1.8
Piling stroke(m)2.0
Pace(m)Longitudinal3.3
Horizontal0.6
Angle range(°)15
Rise stroke(m)1.0
Square pile(mm)Max450
Circle pile(mm)Max500
Side piling(mm)950
Corner piling space(mm)1900
Lifting weight(t)12.0
Pile hanging length(m)14
Power(KW)Piling60
Lifting30
Main dimension(m)Work length11.30
Work width6.3
Transpot height3.00
Total weight(t)240

 

FAQ

1.Which payment terms can we accept?

  Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.

2.How long will our price be valid?

We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.

3.What are our advantages compared with manufacturers?

a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.

b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.

Company Information

China National Building Materials Group Corporation is the full name of CNBM, which is one of the largest state-owned group in China. In 2013, the total asset of CNBM exceeds US$60 billion dollars with a total staff of 180,000. CNBM is listed in the World Top 500 Enterprises!

CNBM International works as the international platform for CNBM Group. In 2013, our total sales income was more than US$16.8 billion dollars.Every year we import large quantity of iron ore, coking coal and thermal coal etc from India, Brazil, Australia and Russia and other countries.ld'>Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.

Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.


 

Q: Working principle of pile driver
Pile driver is a kind of piling machine that uses the impact force to push the pile into the formation.It consists of a pile hammer, a pile stand and auxiliary equipment.
Q: Can a small country pile driver be able to hit a stone?
Is there a pile driver that can hit a stone?
Q: What's the model of a portable anti flood pile driver? What is the depth of the pile?
Shape size * height * width 450*350*450mm3) work parameters:Operation object: River, Hutang embankment (homogeneous soil)Pile diameter: 60 - 120mmLength: less than or equal to 3000mmPile driving speed: 500-1000mm/minIf you don't know, you can ask me again
Q: What are the characteristics of hydraulic static piling compared with traditional pile driver?
No nuisance, you can work in the downtown area
Q: Requirements of waveform guardrail column piling skills training program and training program.
B, anti blocking blocks, wave beam, end installation(a) after installing the upright column, the bracket (block block) can be installed. The bracket (stop block) is fixed between the wave beam and the upright post through the connecting bolt. The bracket (block) shall be adjusted to make it in place before tightening the connecting bolts.(b) the wave beam is spliced with each other by a splicing bolt and is fixed by a connecting bolt bracket (an anti blocking block), and the direction of the overlap of the roadbed guardrail and the corrugated beam is the key of the installation, and the installation is carried out in strict accordance with the drawing. The direction of overlap shall be consistent with the driving direction. The wave beam should be adjusted continuously during the installation. Therefore, the connecting bolts and the splicing bolts should not be tightened too early so that the long holes in the corrugated beam can be adjusted in time during the installation process so as to form a smooth alignment and avoid local irregularities. When the alignment of the guardrail is considered satisfactory, the bolt can be screwed at last. The connecting bolt between the bracket (stop block) and the wave beam should not be screwed too tight, so that the temperature stress can be adjusted by using a long round hole.(c) the end beam is spliced with standard section guard bars through splicing bolts. The construction method of the end beam is basically the same as that of the wave beam.
Q: Can you drive an excavator? Can you learn it quickly?
Is a rotary drilling rig, difficulty varies, excavators than boring work.AskI'm not talking about steel plate piles!Chasing the answerYes, it's broad. There is steel wire hanging. It's boring, too
Q: The piling machine and the appearance are not considered as large machinery import and export fields
See what kind of bar! If it is a small blue ocean highway, the pile driver is not large, even if the loading type. The foundation pile driver is different from the other machines and should be counted
Q: What's the effect of Engineering piling?
Thus the building passes the load to the foundation, the foundation passes to the pile and the pile passes to the rock below the pile.
Q: Safety requirements for diesel hammer pile drivers for diesel hammer pile drivers
19, the operation should always check whether the fasteners are loose, the moving parts are flexible. Diesel pile hammer after the operation note 20 after the operation, diesel hammer should be parked in a solid flat ground, diesel hammer should be placed on the ground plate or into underground pile, shutting down the fuel switch, barrel type hammer should be put in the net cooling water, mounted on the cylinder head, exhaust cover, safety screw etc., and mounted on the safety card. The pile holder shall be placed in a stop position, locking the safe and braking position. 21 rail type pile holder should clamp the rail clamp when it is not working. When the 22 pile stand is broken, the brake performance of the hoister shall be checked first, and then operated according to the procedures specified in the instruction manual. 23, long-term disabled, should be unloaded diesel hammer, loaded with safety board, the diesel hammer fuel, lubricating oil and cooling water all out, cleaning the combustion chamber, coated with anti rust oil on the ball bowl, and take rainproof measures.
Q: What is the noise of a static pile and a diesel pile driver?
The noise of the static pile is small, so it is suitable for the construction in the city and the construction cost is higher.The diesel pile driver has large noise and is suitable for field construction, and the construction cost is low.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords