CMAX Series Hydraulic Static Pile Driver for Sale
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
CMAX Series Hydraulic Static Pile Driver for Sale
ZYJ series hydraulic static pile driver is the product for building pile foundation construction under the independent research and development of our company and with more than 10 national patented technologies. It is a novel environmentally friendly construction equipment characterized by no pollution, no noise, no vibration, fast pressing of pile as well as high pile quality, and represents the development direction of piling machinery. Since mass production, its domestic market share has been firmly first, and our company has become a professional enterprise with research and development, production and sales of domestic pile machine taking the lead. The product won the second prize of the State Scientific and Technological Progress Award in 2003, becoming the famous-brand product of Hunan. Our company participated in drafting the Hydraulic Pile Driver industrial standard (JB/T11674 2013), which greatly promotes the development and progress of technology of static pile driver and pipe pile industry in China. Our company completed the upgrading of product design in 2013 to comprehensively improve the configuration, performance and quality, and the products are well welcomed and praised by the customers since it was put on the market.
Feature:
1. High-efficiency and energy-saving piling system with quasi constant power
2. Humanized driver cab and concise and clear control console
3. Piling oil cylinder and motor pump set with scientific and reasonable matching
4. Patented technology - fast return of piling oil cylinder
5. Clear and simple hydraulic piping layout
6. Patented technology - multipoint pressure-equalizing gripper mechanism
7. Unique "side piling and angle piling" device
8. Steel H-shaped pile can be pressed into the trapezoidal and triangular piles according to customer requirements.
9. Simple structure and easy transport
10. New hydraulic walking chassis
11. New patent – side piling device
Parameter | ZYJ80 | |
---|---|---|
Dimension | Length mm | 8000 |
Width mm | 4254 | |
Height mm | 2996 | |
tf Max.piling force | 80 | |
m/min Max.piling speed | 4.33 | |
Travel Capacity | Lengthwise m | 1.6 |
Widthwise m | 0.4 | |
Angel ° | 11 | |
标配起重机Standard crane model | QY5 | |
Grounding Pressure | (Kpa)Long ship | 63 |
(Kpa)Short ship | 89 | |
Side pile distance mm | 450 | |
Comer pile distance mm | 800 | |
Max round pile mm | 300 | |
Max square pile mm | 300 |
Cases
FAQ
1.Which payment terms can we accept?
Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.
2.How long will our price be valid?
We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.
3.What are our advantages compared with manufacturers?
a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.
b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.
- Q: Pile up can not go down, how to deal with?
- The diameter of the hole pile is generally one to two smaller than that of the designed pipe pile, which can ensure the friction force of the pipe pile. Notice of design change shall be given to the design institute.
- Q: Rules for operation of impact pile drivers
- Two, piling construction process, before piling construction, in the construction site around the axis control network testing and protection, and do a good mark, and transfer procedures. The construction process is as follows: lofting pile two Pile Lofting pile pile on pile machine machine alignment machine to feed the pile piling pile verticality correction electric welding welding cooling design requirements to stop piling pile hammer machine machine three, hammer pile construction technology and quality control measures of each Pile Lofting after two times of review and correct aligned with the pile location insert, the first section is slow into the retaining pile verticality, upper and lower section pile after aligning welding, welding inspection by the parties after natural cooling time to meet the requirements after piling, final penetration and elevation controlled by the supervision, party a visa confirmation after the stop hammer machine construction. (1) the quality of the pile is guaranteed by 1. After each pile comes into play, the pile shall be discharged after passing the qualification evaluation (including the qualification certificate, the pile type, the date of manufacture, the appearance quality, etc.), and the pile shall be stacked in plain and not too high layers.
- Q: What's the model of a portable anti flood pile driver? What is the depth of the pile?
- Total mass of power plant: 73KgOverall size: * * width * height 660*500*750mm2) host:Structure: shock, shock, frequency modulationMaximum impact energy: 110.46N..MHost weight: 74KgFlexible shaft length: 4m
- Q: Which manufacturer is better for highway guardrail and pile driver?
- There are many manufacturers of pile drivers now. Do you buy them online or offline?
- Q: How many prestressed concrete pipe piles can a pile driver hit in a day?
- You can hit 4 roots a day.Precast pile, various materials, various forms made in the factory or the construction site of the pile (such as wood, concrete pile, prestressed concrete pipe pile, steel, etc.) with piling equipment will be pressed into piles, or buried in vibration. More prefabricated piles are used in the field of building construction in China, mainly concrete precast piles and steel piles in two major categories.Precast piles are mainly concrete precast pile and steel pile two major categories. Precast concrete pile can bear larger load, durable, fast construction speed, is one of the most widely used type of pile, but its construction has great influence on the surrounding environment, are the most commonly used concrete solid pile and prestressed concrete hollow pile. Steel pile is mainly steel pipe pile and H steel pile two kinds.
- Q: such as bulldozers, pile drivers, cranes and cement mixers?
- Construction industry users are not the public works team? Yes, this is the construction units to the construction enterprises to provide machinery, construction settlement time, count less money.
- Q: Handan steel sheet piling machine a number of how much money
- According to the quality450 pile driverHit 9m Larson steel sheet pile about 100300 pile driver
- Q: What are the types of hammer pile drivers?
- There are diesel tube pile driver, power source brand, Zhong Zhong brand, and Zhejiang is very popular guide rod hammer
- Q: What safety measures should be taken when assembling a pile driver?
- 4, mechanical equipment installation and transportation safety mattersThe mechanical equipment should be installed in a safe place, not in the rock slope landslide, or may be installed by flood invasion and flying stone in place, to ensure personal safety and machinery.The room layout shall be constructed according to the mechanical instructions or actual needs. Room to ensure mechanical windproof and rainproof, antifreeze and other requirements, to the appropriate area, convenient operation and maintenance, and adequate lighting, good ventilation, shutdown protection facilities for temporary use of machinery should be necessary.Mechanical equipment shall be installed according to the instruction manual and relevant regulations. After installation, safety inspection and performance test shall be carried out, and may be put into use after the test operation has been qualified.When the mechanical equipment is transported, make sure the binding is firm, the center of gravity is reliable, the brake is reliable, and the traffic safety is ensured.When mechanical equipment is unloaded, be sure to handle with care, forbid to throw and throw off from the car, use dump truck to transport machinery, forbid dumping with dumping method.
- Q: How can I find a pile driver?
- Go to the construction site, it is better to have known the construction team, or the construction company pull!
Send your message to us
CMAX Series Hydraulic Static Pile Driver for Sale
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords