• ZYC700 Used Pile Driver Hydraulic Static Pile Driver for Sale System 1
  • ZYC700 Used Pile Driver Hydraulic Static Pile Driver for Sale System 2
ZYC700 Used Pile Driver Hydraulic Static Pile Driver for Sale

ZYC700 Used Pile Driver Hydraulic Static Pile Driver for Sale

Ref Price:
$200,000.00 - 500,000.00 / unit get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

ZYC700 Used Pile Driver Hydraulic Static Pile Driver for Sale

 

Lower Energy Consumption:

>>We use variable hydraulic systems with low   loss and constant power in this series of products, so that energy   consumption decreases by 30% and working efficiency increase by 60%.

 


 

High Efficiency:

>>To ensure the high working efficiency of the   whole machine, we use hydraulic systems with big power and great flow, the   pile driving mechanism with multi-speed control and being quick in getting   ready for operation.

 


 

High Reliability:

>>To ensure the high reliability of our   products which engineering machines should possess, we improve the design and   use very reliable materials or components which we select carefully in the   process of purchasing.
  >>For example we use inverted cylinder as a supporting leg which has   become a patent in our country so as to avoid the easy breakage of cylinder   which was the case with traditional design.


 
 

 


 

Convenience in dismantling, transportation and   maintenance:

>>Since we have constantly improved our design   of pile drivers for more than 10 years, every part of the machine is easy to   be taken apart, which provides convenience in transportation and maintenance. 
  >>Compared with the pile drivers made by other companies, ours are more   convenient to be taken apart and shipped as the connection and lay out of the   long boat and the short boat are different.
  >>Take the driver's cab for example; it can be opened at the middle so   that the lifting arm of the crane can pass through it during transportation.   Besides, the side piling mechanism can be taken off so as to reduce the   length of machine to be shipped and greatly reduce the weight of separated   units in transportation.


 
 

 


 

Multi-function:

>>Our products are multi-function static   hydraulic pile drivers with embracing pile driving, top-pressing pile driving   or both at the same time because they are well combined with each other.
  >>Our products have bigger capacity of side piling and corner piling   than those of other companies, and the power of side or corner piling reaches   60% of the middle piling.
  >>Our pile drivers can work with a variety of piles, square piles or   round piles or other shape of steel piles, no matter thin-walled round   concrete piles or thick-walled ones.

 


 

Systemization and Maximization:

>>Our company has developed 14 models of pile   drivers with the capacity of 60 tons to 1200 tons and each model is   classified into 4 kinds according to its function with the maximum tonnage of   1200.


 
 

 


 

Flexibility in Designing:

>>To keep up with the development in the   engineering machinery of the world, we will integrate all useful high   technologies from machine-building, electricity, hydromechanics and   electronics into our products and meet different individual needs of our customers. 
  >>For example, we can, if any customer requires, install a   position-controller for the crane, and a digital screen showing the tonnage   of piling force, etc.


 
 

 


 


Two Patents:

>>The design of inverted cylinder as a   supporting leg which avoids the radial force on the piston extends the   life-time Of the cylinder. 
  The patent number is ZL01249443.7.
  >>Embracing pile driving or top-pressing pile driving or both are used   in operation with one machine. 
  The patent Number is ZL02139875.5.


Parameter/ModelZYC700
Rate piling pressure(KN)7000
Piling speed(m/min)Fast7.0
Low1.02
Piling stroke(m)1.9
Pace(m)Longitudinal3.6
Horizontal0.7
Angle range(°)11
Rise stroke(m)1.2
Square pile(mm)Max550
Circle pile(mm)Max600
Side piling(mm)1250
Corner piling space(mm)2500
Lifting weight(t)16
Pile hanging length(m)15
Power(KW)Piling111
Lifting30
Main dimension(m)Work length14.00
Work width8.16
Transpot height3.15
Total weight(t)700

 

FAQ

1.Which payment terms can we accept?

  Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.

2.How long will our price be valid?

We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.

3.What are our advantages compared with manufacturers?

a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.

b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.

Company Information

China National Building Materials Group Corporation is the full name of CNBM, which is one of the largest state-owned group in China. In 2013, the total asset of CNBM exceeds US$60 billion dollars with a total staff of 180,000. CNBM is listed in the World Top 500 Enterprises!

CNBM International works as the international platform for CNBM Group. In 2013, our total sales income was more than US$16.8 billion dollars.Every year we import large quantity of iron ore, coking coal and thermal coal etc from India, Brazil, Australia and Russia and other countries.ld'>Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.

Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.

Advantages

1 sincere

CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the outdoor heaters produced by CNBM are compliant with the national level quality.

2 professional

Our engineers will at your services 24hours to answer your questions. Our goal is to provide the best professional services.

3 quality

 CNBM International’s outdoor heater have strict quality control, only the best quality products can pass the test.

4speed

 We have professional sales team to guarantee your reply within 12hours to save your precious time.

5 After sales

If the tower crane has any problems, we will solve your problems in first time.


 

Q: The grounding of piling machine. Pile machine, three-phase asynchronous motor one day to play 2 piles piling machine and control box are constantly moving, how to ground? And is not a machine box. A gate or a few feet to ground is the five core. In three, the rest of the root, the zero line and the PE are useless? Thank you, predecessors, great God under the guidance of? In this way, the master said that the reception will be over, installed a leak protection, is not installed, the leak insurance does not need to ground ah?
Pile piling the opportunity to continue to move above the motor power is less, sometimes with a welding machine, control box in pile machine, according to the requirements of JGJ46-2005, must be "one machine and one gate of a protection"!
Q: What is an impact pile driver?
You mean the kind of pile driver that used to use high explosive diesel engines to produce impact?The principle is like using the percussion hammer nails, using a hammer impact in the nail head will generate the nail.It's very seldom used now.
Q: My family is in the countryside, and now more than 100 meters behind the house in the pile is the kind of shock, our house is built in 99 years, has been very good. Since the piling, I have been shaking the door, the construction party every day for more than 8 hours, has been more than 10 days, and now I have a lot of cracks in the floor. What's the influence of our family, please? Are there any rules for investigating what should be done before piling?
In engineering piling, because of the huge impact force, it can produce shock wave, which will cause some damage to the surrounding building.
Q: Code for installation and operation of pile drivers
First, piling machine operators must be familiar with the structure of the machine, performance, operation essentials and safety precautions, after passing the test and obtain a certificate, you can operate alone.Two, operators must concentrate on the operation. Do not talk, laugh, play or make trouble with unrelated persons. No smoking or food is allowed during the operation.Three, strictly abide by the relevant provisions of the maintenance of pile drivers, conscientiously do all levels of maintenance, to ensure that pile drivers are often in good condition. And pay attention to the rational use, correct operation.Four, the pile driver in the work should be prepared for the following:1, to the construction staff understand the construction conditions and tasks, and construction problems found in this class should pay attention to matters.2. Adjust the position of the speed change gear of the pile driver according to the vibration force required by the construction personnel.3. Check whether the insulation of cables and wires is good. Check that the controller's contacts are good and that the bounds are correct.
Q: What are common piling steel pile equipments?
1, manipulator, different types of 350~600 excavator with long arm vibration hammer refitted, has the advantages of flexible construction, the disadvantage is the limited length of the longest only construction of 15m steel sheet pile, usually used for the 12m steel sheet pile, and the extension of the limited distance, can reach the range of 6m.2. Vibratory hammer, 50~80 ton crawler crane (hoist crane), vibrating hammer, hydraulic vibratory hammer, electric vibrating hammer, steam type and diesel power type. The hydraulic hammer is provided with a hydraulic tightening device.
Q: How much power does piling work at a construction site?
Depends on the type and power consumption of your pile driver
Q: What are the prospects for a small pile driver and a foundation pile driver? Will it make money?
Small rotary drilling rig prospect is very good, is generally 40 meters below the depth of drilling rig is defined as a small rotary,
Q: PV pile driver
Shandong Tengzhou production of this idiot manufacturers have a few, can come to Shandong to look strong, has many years of construction experience in complex terrain. Can prevent landslides and broken stones.
Q: I want to learn construction piling machine, rely on it to earn money, the future to marry the daughter-in-law pension!
Test piling permit can be trained by way of evidence, I have worked over these special operations personnel, piling a lot of points, see you want to learn that, 1. diesel hammer pile, 2. static pressure pile,.3 punching pile, 4. rotary pile,.5 drilling brick, and so on.
Q: What is a car pile driver? I hear it's easy to use.
Yeah, yeah. You're talking about wheels. I am now using a wheeled screw, not only easy to move, the speed is very fast, is a powerful brand of Shandong piling machine, also known as force pile driver.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords