High-end Tunnel Formwork
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
TUNNEL FORMWORK
The automatic hydraulic tunnel formwork is the equipment to make
the concrete lining for the tunnel in one time.The empty gantry allows the
transport vehicles to pass. The motor gearbox is adopted to drive
the whole equipment, the formwork is fully hydraulic, with hydraulic
cylinder to prop & strip, and lock mechanically
Advantage
◆ Good concreting quality
◆ High-speed of installation and removal of the form
◆ Easy operation and safety
- Q:Loess tunnel construction quality control points
- 3) arch filled with rubble concrete should meet the requirements of the relevant regulations.4) concrete or rubble concrete arch above the back should reach the design strength of concrete arch in the back 70% after construction.
- Q:What are the driving jobs in the tunnel
- The face, each step, invert, two lining, template positioning surveying
- Q:In the process of tunnel construction, two kinds of formwork system should be adopted in the construction of the two lining concrete. Q: what is the template trolley?
- Two lining concrete pouring mould capable of self walking
- Q:I would like to ask the tunnel hydraulic trolley steel template design is the use of what software
- According to the design requirements, draw the spare parts drawings, and then workers in accordance with the production drawings!
- Q:Main diseases and prevention of tunnel
- Insufficient anchor tensionPhenomenon: anchor installation is not strong, pulling force is not enough.The reason analysis: anchor length is not enough; mortar grouting is not full; mortar wrapped anchor thickness is not enough or not at all; holes in the debris is not clean; the depth of the hole with the length of the bolt is not matching.Preventive measures: the hole diameter should be matched with the bolt diameter; strictly according to design deep hole drilling; grouting pressure and wind pressure water rinse perforations; bolt rust, straightening, ensure the bolt and hole center line on the same line of installation; the hole from the bottom of the hole, uniform and continuous. Midway not interrupt; using earlystrong medicine package bolt, the bolt diameter should be treated with perforation diameter matching.
- Q:There are no recycling tunnel templates
- If it is a tunnel two lining car template, and the use of the tunnel after the car can continue to use the value of such a tunnel lining car basically has a market of two, but also to be recycled. The specific recovery and continue to use, mainly to see the two lining of the tunnel and the old and new without modification.
- Q:What is the role of the grid steel frame and steel mesh in the power tunnel
- Advanced small pipe grouting small catheter with a diameter of 32-50mm steel pipe, the pipe tip and tube holes for special processing. The first row with drill drilling pipe. Row spacing is 30cm, fan shape, elevation of 5 degrees to about 8 degrees. The length is 2.25m, a single fluid grouting (cement) or double grout (cement water glass slurry). Adjust the grouting pressure according to the soil.
- Q:I would like to ask the high-speed rail tunnel invert small side wall and arch with the small side of the wall of the hanging formwork of what a good method?
- The self - made invert sliding formwork trolley is used to fix the side plate directly on the trolley. This is the best way
- Q:How many meters can be poured in the first floor of the 2 level of the surrounding rock of the railway tunnel?
- This time you need to see the construction unit of customized templates or make a template for a few meters, such as the 6 template pouring 6 meters, 12 meters is 12 meters, but not more than 12 meters or less than 6 meters, the pouring of inverted arch lining 2, or a concrete filling or the floor, according to your concrete filling or bottom layer below is conducted when a one-time pouring process is only a few meters a few meters. You can take a look at TZ204-2008 "railway tunnel construction technical guide" fifth "construction method" learning
- Q:How to put the positioning point is based on what is mainly based on my novice, do not
- The next two large positioning along the side mode, re positioning of two small side mode along the point, then turn to check the center point and elevation, if not the positioning deviation is complete, then re adjust the positioning deviation! If you have time to measure the location of the site can be set up, then you do not nail this method, the five points directly to the elevation and mileage can be controlled for a long time
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
High-end Tunnel Formwork
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
New products
Hot products
Hot Searches
Related keywords