Bridge Formwork System and scaffolding system
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m²
- Supply Capability:
- 1000 m²/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Building Bridge Formwork:
A compositional steel formwork system mainly used in the building which has regular structure
without beams, the excellent formwork system can make the integral pouring for the wall & slab
easily achieved.
Characteristics:
◆ No assembling, easy operation with formed formwork.
◆ High stiffness, make perfect shape for concrete.
◆ Repeatedly turnover is available.
◆ Widely applied range, such as building, bridge, tunnel, etc.
- Q: I would like to ask the tunnel step method excavation, the height of each step is how to divide?
- On the circular arc heading cutting method, the excavation of each cyclicfootage and steel frame with same interval, after the excavation will be used in the initial support, the excavation behind the steps of 8~10m, after the excavation construction of initial support and invert, and then the middle rock pillar grouting reinforcement. (4) of excavation the surrounding rock and the surrounding rock in deep buried section IV and supporting: IV rock by step excavation method, step up the steps behind 8~10m, up and down the steps of primary support construction must follow with the excavation. Rock class take the whole section excavation method. (5) are the simple types of rock excavation self assembling drilling trolley, with dump truck shipment mucking loader. In order to ensure the safety and stability of tunnel construction in soft rock section, the construction must follow the "weak blasting, little disturbance, short excavation, strong support and frequent measurement, tight lining", in the application of The following measures shall be taken
- Q: Ask, general highway tunnel measurement with the total station to measure which aspects? The more detailed the better
- Slag road slope line, shotcrete receiver measurement, measurement of highway tunnel excavation section, the most important measure is the monitoring and measurement precision of total station but couldn't finish that much. Ha-ha
- Q: The tunnel lining is wood, how should support?
- The excavation of the tunnel face, slag, to the primary support system, first hit the bolt, then use steel or steel made of steel, installation support in tunnel contour, and then sprayed concrete (poor surrounding rock hanging steel mesh, then sprayed fiber concrete).
- Q: How the arch of the tunnel concrete pouring up, how to support before pouring, using I-beam is directly support the earth?
- The excavation of the tunnel face, slag, to the primary support system, first hit the bolt, then use steel or steel made of steel, installation support in tunnel contour, and then sprayed concrete (poor surrounding rock hanging steel mesh, then sprayed fiber concrete).
- Q: What is the role of the grid steel frame and steel mesh in the power tunnel
- The back cover, shaft ingate construction, to get rid of the upper advanced small pipe grouting reinforced concrete, erecting of ingate upper grille steel frame, injection, get rid of the upper concrete lower reinforced concrete, erecting of ingate to spray the concrete lower grille steel frame.
- Q: Who can give me detailed tunnel construction process
- On the inner side wall heading section is advanced, the footage was 0.7m immediately on the rock surface at the beginning of the spray, install the first layer of rock along Phi 8 steel mesh, and connected into a whole, set up active and temporary supporting steel arch, and the arch and a connected whole Phi 25 steel, drilling into the phi 25 hollow bolt and grouting, the installation of second layer steel mesh shotcrete layer to design contour line, pay attention to every compact trusses on the back of the footage, about 5~10m after the excavation under the heading section, and the lateral wall of drift can also present a ring section excavation footage was about 20 ~ 35m, support the arch excavation core soil upper arc heading, 3 ~ 5 after excavation footage and central support, under the section of tunnel bottom and the lower end of the previous about heading completely combined with closed loop, is divided into seven excavation, all operations must strictly follow the open Step by step, must be two inside the wall first, follow up the process step by step process. At the same time there must be monitoring data as the basis, redistribution of stress or conversion, will increase the support displacement, and strata subsidence and deformation, should strengthen the monitoring capacity before and after removal of the tunnel deformation and supporting force measurement,
- Q: When the two lining of the tunnel is used as the lining concrete of the two, how to lay the trolley? Please kindly explain steps.
- If the template comparison rules, the design center line directly, that is, the center of the car can be, and then measured elevation and the design elevation of the introduction of the real distance from the real point of the vehicle
- Q: What is the width of a ring in a tunnel
- The car is generally long 9m can be a one-time pouring, a ring is a pouring two lining length
- Q: In the tunnel construction, the water stop belt and the water stop strip are respectively used in what place, the construction joint and the subsidence seam many meters set a, above all has any function
- 5, the user should be based on the order of the project structure, design drawings to calculate the length of the product, the special-shaped structure should have drawings, as far as possible in the factory will be connected to the whole
- Q: What is the first project of tunnel constructionNow to do some of the tunnel program, you need to be the first to list out, a total of what? I know that the first branch, two lining, inverted arch, tunnel, pavement these
- The first project of concrete lining of this section as I bid the tunnel project, on the next two plays a role model leading lining construction, so the various factors must be considered in detail, before the construction plan, reasonable arrangement, strict control of construction process, construction timely summary, finally reached the first the United States, the project entity information is true and complete, the project finished good target
Send your message to us
Bridge Formwork System and scaffolding system
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m²
- Supply Capability:
- 1000 m²/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords