Easy Operation Tunnel Steel Formwork
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
TUNNEL FORMWORK
The automatic hydraulic tunnel formwork is the equipment to make
the concrete lining for the tunnel in one time.The empty gantry allows the
transport vehicles to pass. The motor gearbox is adopted to drive
the whole equipment, the formwork is fully hydraulic, with hydraulic
cylinder to prop & strip, and lock mechanically
◆ Good concreting quality
◆ High-speed of installation and removal of the form
◆ Easy operation and safety
- Q: 1 tunnel lighting design steps, 2 teacher said to design a template, is not to create a tunnel, and then according to the numerical calculation of what?
- When the light into the human eye increases, the pupil contraction, when the surrounding environment becomes dark; into the human eye when the light is reduced, the pupil increases.
- Q: Ask, general highway tunnel measurement with the total station to measure which aspects? The more detailed the better
- Slag road slope line, shotcrete receiver measurement, measurement of highway tunnel excavation section, the most important measure is the monitoring and measurement precision of total station but couldn't finish that much. Ha-ha
- Q: What is the vault vault seal and dead seal please give a detailed drawing of the drawing bar do not know how to do?
- Directly in the template hole, make a steel plate bolt
- Q: How to put the positioning point is based on what is mainly based on my novice, do not
- The trolley positioning, the first to the two lining trolley running mileage, and positioning, positioning process will have been completed two off the top two tight lining lining, free end positioning first center point positioning control of elevation and with a plumb line (top surface elevation is equal to the length of the plumb line + if the mileage of two the center point of elevation can be lining),
- Q: The tunnel lining is wood, how should support?
- The excavation of the tunnel face, slag, to the primary support system, first hit the bolt, then use steel or steel made of steel, installation support in tunnel contour, and then sprayed concrete (poor surrounding rock hanging steel mesh, then sprayed fiber concrete).
- Q: What are the driving jobs in the tunnel
- Control wire measurement in the cave 5) elevation control survey 6) through survey (7)
- Q: When the two lining of the tunnel is used as the lining concrete of the two, how to lay the trolley? Please kindly explain steps.
- The first measurement group with total station will be five points (template center, 2 large side mode along the point, 2 small side mode along the projection point) in lofting invert, with nails into the inverted arch concrete as a symbol, and note the nail surface elevation. The trolley positioning, the first to the two lining trolley running mileage, and positioning, positioning process will have been completed two off the top two tight lining lining, free end positioning first center point positioning control of elevation and with a plumb line (top surface elevation is equal to the length of the plumb line + if the mileage of two the center point of elevation can be lining)
- Q: What is the role of the tunnel formwork trolley? What is the use of template trolley?
- The car is often used in the construction of hydraulic tunnel, the tunnel is not allowed to have concrete construction longitudinal joints, in the hydraulic tunnel span is large
- Q: What is the simple calculation method of the tunnel excavation unit price
- Parameter valuationThe valuation of parameter method is the method of calculating the multiplication coefficient according to a certain cardinal number or the custom formula. This method is simple and clear, but the biggest difficulty is the scientific formula, accuracy is difficult to grasp. This method is mainly applicable to the construction process must occur, but it is difficult to predict the specific items in the bidding, but can not separate the project content of the project measures. If the valuation night construction fees, two handling fee, rain during construction can be used in this method.
- Q: Two tunnel lining reinforced concrete template to price behavior can be contracted
- There is two times of lining concrete pouring, the normal price is within 100 yuan, this is the pure artificial price, does not contain steel trolley and various materials two tunnel lining.
Send your message to us
Easy Operation Tunnel Steel Formwork
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords