High-speed of Installation and Removal Tunnel Formwork
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
TUNNEL FORMWORK
The automatic hydraulic tunnel formwork is the equipment to make
the concrete lining for the tunnel in one time.The empty gantry allows the
transport vehicles to pass. The motor gearbox is adopted to drive
the whole equipment, the formwork is fully hydraulic, with hydraulic
cylinder to prop & strip, and lock mechanically
◆ Good concreting quality
◆ High-speed of installation and removal of the form
◆ Easy operation and safety
- Q: Ask, general highway tunnel measurement with the total station to measure which aspects? The more detailed the better
- The first instrument identification, according to the drawings issued by the tunnel portal design to determine, determine the portal after the slope portal to lofting, tunnel excavation and excavation contour checking (i.e. overexcavation measurement)
- Q: The periphery of the tunnel outline has been sealed with steel seal, and can be used as the external formwork when the concrete is poured. The 3 parts of the tunnel are divided into floor, side wall and roof. When pouring, the concrete can only be pumped in the tunnel, the outside of the tunnel is the Pearl River, and the construction can not be carried out outside the tunnel. The roof pouring, only from the bottom to the pump. Question: 1, the roof concrete pouring, how to discharge the air? How to tamper? 2, the tunnel width of 23 meters, you need to do the construction of the seam or after pouring it? Time is pressing, please reply as soon as possible. Good addition score. Thank you。 If you can't see the picture, click this link:
- The floor concrete is made by the method of subsection pouring, the length of each section is about 16 ~ 24m, and the construction joint is kept between each construction section. After pouring concrete floor, due to the need for roughly 7 days to meet the design requirements of concrete strength, to remove the floor above the first steel purlin and support. During this period of time can be the first construction of steel bars and formwork works, and then the construction of the outer wall of the leveling layer and the wall of the waterproof layer.
- Q: Loess tunnel construction quality control points
- 2) the invert, invert the filling layer and dry concrete construction should be concrete accurately, use the template, mechanical tamping compaction. The inverted arch concrete by pumping casting, should use the arch template ensure molding size meets design requirements. The construction of invert arch and filling layer should be completed according to the design of inverted arch concrete construction, the appropriate interval, and then change the proportion of concrete, filling layer of concrete construction;The construction of inverted arch and the cracks and deformation joints should be waterproof treatment according to design requirements, should be in accordance with the relevant provisions of this guide.Invert the overbreak in the allowable range, should be used with the same strength grade of concrete lining casting; overbreak exceeds, should according to the requirements of design and specification of the backfill, shall not use the random hole slag backfill, non intrusive rubble arch section.
- Q: For example, lining, invert, bias and so on words,, to answer the full thank you
- Bias: refers to the formation of the tunnel, resulting in uneven pressure. To provide you with a few books you go to see the explanation. The site is easy to understand.
- Q: How to fill in the tunnel template
- There seems to be a quality inspection form,Send a template to see
- Q: Design of lining concrete is C30, what should be used in the construction of concrete arch cushion concrete?
- Course (bed) refers to the structural layer below the base level. Its main function is to separate water, drainage, antifreeze in order to improve the working conditions of the base and foundation, and its water stability requirements.
- Q: When the two lining of the tunnel is used as the lining concrete of the two, how to lay the trolley? Please kindly explain steps.
- If the template comparison rules, the design center line directly, that is, the center of the car can be, and then measured elevation and the design elevation of the introduction of the real distance from the real point of the vehicle
- Q: Tunnel steel arch behind the steel mesh after a layer of fine iron wire mesh what effect is there?
- Function as follows:1, the construction of the shaft excavation of the power tunnel shaft structure is a permanent structure, the construction of the shaft using shotcrete + net structure steel frame + steel mesh support + waterproof film + cast-in-place reinforced concrete lining method.
- Q: Demolition of tunnel bearing formwork for several days
- The average temperature of 20 degrees, can be removed for 28 days. High temperature removal time is short, low temperature stripping time longer.
- Q: What is the first project of tunnel constructionNow to do some of the tunnel program, you need to be the first to list out, a total of what? I know that the first branch, two lining, inverted arch, tunnel, pavement these
- The first project of concrete lining of this section as I bid the tunnel project, on the next two plays a role model leading lining construction, so the various factors must be considered in detail, before the construction plan, reasonable arrangement, strict control of construction process, construction timely summary, finally reached the first the United States, the project entity information is true and complete, the project finished good target
Send your message to us
High-speed of Installation and Removal Tunnel Formwork
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords