BOX GIRDER

External formwork of 32/24 meters post-tensioning concrete pre-faricated box girder is divided into sliding mode and
rolling mode; the side form of the first mode can move from one bottom form to the other one which increases the
utilization rate, and decrease the investment for the formwork during construction; the side form of the second mode
is relatively fixed according to the bottom form, and could be dismantled by revolving, which improve the efficiency
of formwork closure.The side formwork unit is mainly 6 meters, the design of the sructure is compact
and reasonable with beautiful and smooth appearance.

■  All the edges of ecternal formwork panels for the box girder have been milled, which ensure

the assembly precision to avoid the leakage of the concrete

■  The bottom formwork unit is 3 meters to facilitate the installation and anti-arch adjustment

■  The bulkhead is designed to envelop the sideform,which can be wholely assembled, making the removal, installation and adjustment much easier.

Q: Remove the larger span of the beam pillar template why should be removed from the middle to the two ends
The maximum bending moment in the middle of the beam is removed from the middle of the support, the stress is concentrated on the two supporting end, and the final force form is the same as the reinforcement of the beam, and the bending and the excessive shear force are not generated
Q: For example, a beam 200*400, length 5000Plate thickness 1005000*5000The area of the template is1, (0.2+0.3*2) *5+5*52, 0.3*2*5+5*5Which is right
The beam of the template is to calculate the beam height (minus the plate thickness of the part) * net long *2 surface. The bottom die has been calculated in the bottom plate.Louzhu certainly not familiar with the construction site, as long as the scene to see how the template is placed.
Q: Beam plate template is composed of the bottom template and what
A, length, B width or height. Such as triangle F=0.5, A for the bottom edge of the length, B is high
Q: The area of the beam template = (both sides of the high and low beam) * beam lengthWhat do you mean by the two words in the brackets?
Calculation of contact area between concrete and formworkPillar: circumference multiplied by the column height, from the pile or board surface of a first floor surface, non beam plate count to the bottom of the column cap
Q: There are times when the beam is not to deduct the secondary beam on the main part of the beam?
The general situation is calculated according to the contact area between the concrete and the template
Q: When the main beam and secondary beam connection, calculate the area of the template is good, there is no simple method
It would take the high beam length reduced thickness, and by 2, the last plus beam bottom
Q: How to support 6m arc beam template how to set up?
After setting out in accordance with graphics support ah. If the curvature is large, it can be approximated by linear segmentation.
Q: What are the main composition of the beam template
A> roof formwork support structure B> shear wall structure of formwork C> column formwork support structure
Q: What is the demolition order of the construction template
3 the demolition of multilayer floor pillar shall be carried out according to the following requirements: when the upper floor slab is pouring concrete, the next floor slabThe pillar shall not be removed, then the next floor of a live, can only be removed part of the span is 4M or above 4M Xiajun should retain the brace beam, pillar spacing shall not be greater than 3M.
Q: First of all, what are the construction of the structure of the template, such as walls, columns, beams and ladders, which is the structure of the first installation of the template after the installation of steel? Ten
On the contrary, the beam plate is the first template, tied after the reinforcement, because the beam plate is flat, the first binding steel, do you want to let the first suspension? That's not going to collapse