• High Load Bearing Girder Box Formwork System 1
  • High Load Bearing Girder Box Formwork System 2
  • High Load Bearing Girder Box Formwork System 3
High Load Bearing Girder Box Formwork

High Load Bearing Girder Box Formwork

Ref Price:
get latest price
Loading Port:
XINGANG
Payment Terms:
TT or L/C
Min Order Qty:
1 Set/Sets set
Supply Capability:
200,000 Ton/Tons per Year set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Detailed Product Description High Load Bearing Girder Box Formwork for Preformed Unit

 

bridge deck formwork

High Load Bearing Girder Box Formwork for Preformed Unit

 

 

Description of  High Load Bearing Girder Box Formwork :

 

1. Brief introduction of High Load Bearing Girder Box Formwork for Preformed Unit

 

GB system-B is a kind of formwork especially for performed box girder in bridge floor construction.

 

 

High Load Bearing Girder Box Formwork

 

2. Competitive advantage of  High Load Bearing Girder Box Formwork


①. Assembling is easier makes high construction efficiency.

 

②. Pouring object surface is smooth and beautiful.
The formwork is made of steel material with higher load bearing capacity and stronger stiffness that makes perfect surface on concrete.

③.Good economic performance

The cost will be greatly reduced by its long service life and more turnover times.

3. Applications of High Load Bearing Girder Box Formwork for Preformed Unit

 

 

 High Load Bearing Girder Box Formwork

 

 

 

 

Q: I only see the span is greater than 4M of the beam arch height is 1/1000~3/1000, if that is 5m, 8m, 12M, 16m and even assuming 20m, the supply is only 1/1000~3/1000????
Span multiplied by 1/1000~3/1000, can not be so precise, the general is probably about two or three cm
Q: Why is Changshi beam, but also computing to the side or side column beam?How to deduct the overlap area between beam and plate, column and wall, wall and wall
Cross beam and beam cross section is not a template overlap
Q: For example, a beam 200*400, length 5000Plate thickness 1005000*5000The area of the template is1, (0.2+0.3*2) *5+5*52, 0.3*2*5+5*5Which is right
Plate side mode *2 is the circumference of the board (minus column protruding part) multiplied by the thickness of the plate 0.1M
Q: The area of the beam template = (both sides of the high and low beam) * beam lengthWhat do you mean by the two words in the brackets?
Beam: beam length multiplied by the end of the beam and 2 times the length of both sides, the beam length to the side of the column, the wall side, the second beam to the main beam side, the outer part of the calculation of the center line, according to the calculation of the internal part of the net long linePlate: the column, beam, 0.3 square meters outside the hole area
Q: Seeking beam, plate template engineering quantity
Plate template (bottom area): (2.6*3- wall thickness) * (2.4*3- wall thickness) - (2.4*3- wall thickness) *0.2*2 [main beam] - (2.6*3- wall thickness) *0.25*2 [sub beam]
Q: Beam plate with a few face template
The bottom die and the two side die, the height of the side plate with the height of the plate thickness
Q: I would like to ask the three sides of the template is calculated on the surface of which is the three? Novice do not understand thank you
The utility model relates to a three surface template beam (both sides of the beam and the bottom surface of the beam), and the other is a two side formwork beam (two sides of the beam)
Q: How to control the elevation of the beam bottom and the axis position
The design of the middle arch ratio is higher than the span of the span of 1--2 thousandths of 2. A template, according to the control point set square.
Q: What are the main composition of the beam template
A> roof formwork support structure B> shear wall structure of formwork C> column formwork support structure
Q: The main floor beam template installation should pay attention to what?
Install the bottom die, the beam according to the span length of 3 m to the bottom of the beam arch, to ensure that after the completion of concrete pouring, floor thickness and deflection to meet the requirements of the drawings. Beam from the end of the 500mm, in the bottom of the beam to keep a clean mouth, to be cleaned up debris, it will be blocked. The side beam mould die bag bottom mold method, and clip stickers in the template angle at.
We are a national comprehensive Class-A scientific research and design unit, an internationalized engineering group company and a key national-level hi-tech enterprise, and is the engineering technical platform of China National Building Material Co., Ltd.

1. Manufacturer Overview

Location Shanghai,China
Year Established 1949
Annual Output Value Below US$1 Million
Main Markets North America
South America
Eastern Europe
Southeast Asia
Africa
Oceania
Mid East
Eastern Asia
Western Europe
Central America
Northern Europe
Southern Europe
South Asia
Domestic Market
Company Certifications ISO 9001:2008

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a) Trade Capacity
Nearest Port SHANGHAI
Export Percentage 91% - 100%
No.of Employees in Trade Department 200
Language Spoken: English,Chinese
b) Factory Information
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords