High Load Bearing Girder Box Formwork
- Loading Port:
- XINGANG
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 1 Set/Sets set
- Supply Capability:
- 200,000 Ton/Tons per Year set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Detailed Product Description High Load Bearing Girder Box Formwork for Preformed Unit
bridge deck formwork
High Load Bearing Girder Box Formwork for Preformed Unit
Description of High Load Bearing Girder Box Formwork :
1. Brief introduction of High Load Bearing Girder Box Formwork for Preformed Unit
GB system-B is a kind of formwork especially for performed box girder in bridge floor construction.
2. Competitive advantage of High Load Bearing Girder Box Formwork
①. Assembling is easier makes high construction efficiency.
②. Pouring object surface is smooth and beautiful.
The formwork is made of steel material with higher load bearing capacity and stronger stiffness that makes perfect surface on concrete.
③.Good economic performance
The cost will be greatly reduced by its long service life and more turnover times.
3. Applications of High Load Bearing Girder Box Formwork for Preformed Unit
- Q: Remove the larger span of the beam pillar template why should be removed from the middle to the two ends
- The maximum bending moment in the middle of the beam is removed from the middle of the support, the stress is concentrated on the two supporting end, and the final force form is the same as the reinforcement of the beam, and the bending and the excessive shear force are not generated
- Q: What is the foundation beam template
- I was in the study of this problem, it should be the construction is not based on beam design has been explained, but the quota is a little different, the beam bottom cushion or other basis should be the beam, it should be suspended under the general frame or beam. The difference is that the two side support and the three side support. Usually the explanation is still looking for evidence.
- Q: What is the wire mesh in front of the foundation beam
- Wood can be used, but the surface is relatively smooth, after pouring, the bond will be worse; in this way, the construction is more convenient, leaving the rough concrete surface.
- Q: When the height of the beam is small, the beam of the beam is tied up on the top of the beam formwork; when the beam height is large, the steel bar of the beam is bound on the bottom of the beam. What do you mean?
- When the beam height is large, the beam of the steel beam in the bottom of the bundle, which means that the beam of the overall weight of steel, in the Liang Dimo binding, and then seal the side template, and then pouring concrete
- Q: More than the number of square cross-section of the beam high formwork
- For the height of more than 8m, the total load is greater than 15kN/m2, or the central line load greater than 20kN/m of the template support system needs to organize expert demonstration".
- Q: There are times when the beam is not to deduct the secondary beam on the main part of the beam?
- In the middle of the time to buckle, border beam side not buckle, buckle. Calculate the secondary beam to the side of the main beam
- Q: How to do the foundation beam template
- The main construction method by a formwork one-time-concreting organization construction, wall, column and beam plates without construction joints, each layer of wall, column, beam plate model, a branch of Qi, while pouring concrete.
- Q: How to support 6m arc beam template how to set up?
- If you use a supporting beam of radian template, the bottom surface made of a whole block template (template block with good reinforcement, pouring backwater) after dismantling the entire arc shape template on the line; if the second half of the same radian can do a whole half arc template do the bottom die.
- Q: I would like to ask the three sides of the template is calculated on the surface of which is the three? Novice do not understand thank you
- Generally, there are two kinds of formwork support:Area of contact surface between concrete and formwork
- Q: What are the main composition of the beam template
- A> roof formwork support structure B> shear wall structure of formwork C> column formwork support structure
1. Manufacturer Overview
Location | Shanghai,China |
Year Established | 1949 |
Annual Output Value | Below US$1 Million |
Main Markets | North America South America Eastern Europe Southeast Asia Africa Oceania Mid East Eastern Asia Western Europe Central America Northern Europe Southern Europe South Asia Domestic Market |
Company Certifications | ISO 9001:2008 |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | SHANGHAI |
Export Percentage | 91% - 100% |
No.of Employees in Trade Department | 200 |
Language Spoken: | English,Chinese |
b) Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
High Load Bearing Girder Box Formwork
- Loading Port:
- XINGANG
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 1 Set/Sets set
- Supply Capability:
- 200,000 Ton/Tons per Year set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords