Why calculate the amount of time to count a lot of cushion ah
It can be seen, in the preparation of the project budget, the cushion is also a very important sub-head, the amount of its calculation is often measured by m3, the current commonly used materials are concrete, gravel, stone, Stone slag), slag, slag concrete, lime and so on.
What is the relationship between the cushion and the ring beam?
Ring beam is reinforced concrete. Is to increase the overall wall and overall stiffness, improve the side resistance performance, according to the earthquake or masonry specifications set. There may be in the ground wall, there may be in the underground wall.
What is the waterproof layer and the waterproof cushion in the tile roof?
Waterproof layer: set in the tile or metal sheet below, from the waterproof, moisture-proof structure of the layer. The waterproof cushion plays an important role in the tile surface, because the "tile" itself can not be counted as a waterproof material, only tile and waterproof cushion combination to form a waterproof fortification.
Why do the basics of the cushion waterproofing
As for the bottom of the bar thickness of the protective layer is generally 4cm, but if the basic floor of the concrete label is relatively high, the protective layer can be appropriately reduced.
Basement cushion waterproof
Second, when the design of the highest groundwater level above the bottom of the basement floor, you must do waterproofing. As the waterproof waterproof effect is good, so the application of more. Internal waterproofing is generally used for repair works.
Cushion, waterproof layer construction to do what information
4, waterproof layer set and standard construction methods: to be painted 2 to 3 times, or should be added fiberglass cloth, and each brushing the thickness of the cured material shall not be less than 1 mm, and should be completely dry (about 5 -8 hours) and then the next construction. After brushing, but also in the paint waterproof layer to do a mortar protective layer, and finally paste the tile.
Is it possible to make a waterproof layer
3, waterproof layer set and standard construction methods: to be painted 2 to 3 times, or should be added fiberglass cloth, and each brushing the thickness of the cured material shall not be less than 1 mm, and should be completely dry (about 5 -8 hours) and then the next construction. After brushing, but also in the paint waterproof layer to do a mortar protective layer, and finally paste the tile.
When the cushion is used, the thickness of the protective layer is not less than ()
The purpose of the protection, one is to avoid man-made mechanical damage; the second is to prevent climate, UV aging, to extend the service life; three in the planting roof protection layer is to prevent plant roots puncture, different effects using different methods of protection.