• Landfill Geomembrane with Smooth Surface System 1
  • Landfill Geomembrane with Smooth Surface System 2
Landfill Geomembrane with Smooth Surface

Landfill Geomembrane with Smooth Surface

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Geomembrane is a kind of waterproof material with basic raw material of high molecular polymer. It is mainly divided into LD PE geomembrane, , HDPE geomembrane, EVA geomembrance and all kinds of composite geomembrane.

  1. Complete variety of specifications of width and thickness. Thickness: 0.08-2mm/Width: 2-16m .

  2. Excellent environmental stress resistant cracking performance.

  3. Excellent performance of chemical erosion resistance.

  4. Big scope of application temperature and long service life .

  5. Applied in landfill waste site, sewage and filth treatment site, tailings depot and underground construction project

    Items


Q: Can the cushion on the prefabricated board floor be dug?
Surface layer without steel, do not bear the load, you can dig out But sometimes the prefabricated floor above the surface layer with steel, to bear the load, this can not be removed! To know how thick the cushion, in the local dig about In general, to do leveling layer, can not be directly laid tiles
Q: The cushion is usually in the housing which parts
There was no other place in the house below
Q: Foam concrete for the roof cushion generally do much bulk ah
in recent years, the density of 160kg / m3 ultra-light foam concrete is also used in construction projects.
Q: Why do the basics of the cushion waterproofing
Base cushion waterproofing is not contact with the soil (Ying water) to prevent water into the cushion, but in the cushion and the base of the bottom of the contact, in fact, is the basis of the bottom of the waterproof.
Q: Is it possible to make a waterproof layer
3, waterproof layer set and standard construction methods: to be painted 2 to 3 times, or should be added fiberglass cloth, and each brushing the thickness of the cured material shall not be less than 1 mm, and should be completely dry (about 5 -8 hours) and then the next construction. After brushing, but also in the paint waterproof layer to do a mortar protective layer, and finally paste the tile.
Q: What is the difference between leveling and cushion?
Cushion is generally used in the ground floor of the building, leveling layer is generally used in the floor or roof. According to the above analysis, I believe that we use the quota, where the floor, roof construction, it should be used to find the level of the fixed sub-head, because there is no so-called concept of the cushion, leveling layer thickness is not what Specific provisions can also be used at the same time different layers of leveling, but must be carried out in accordance with the design requirements, so as not to exceed the load;
Q: Large area ground concrete cushion seam Why is the separation of joints generally concrete
First, the rigid waterproof layer in a large area of ??construction, by the external force, temperature, humidity changes, structural layer deformation and other factors prone to cracking, leading to leakage, the design should consider the deformation of the waterproof layer to take the necessary Structural or structural measures to avoid and mitigate the cracking of the waterproofing layer to achieve the desired waterproofing effect.
Q: What is the waterproof layer and the waterproof cushion in the tile roof?
Waterproof: In order to prevent rainwater from entering the roof, groundwater infiltrates the wall, the basement and the underground structures, and the indoor water penetrates the floor and the wall.
Q: Basement floor mattress dry to what degree can do coil waterproof?
Third, the membrane waterproof in the construction should first do the basement floor of the waterproof, and then the membrane along the basement floor continuous paste to the outer surface of the wall. Basement floor waterproofing first in the foundation pouring C10 concrete cushion, the thickness of about 100mm. And then paste the membrane, and then in the coil to wear 20 thick 1: 3 cement mortar, and finally pouring reinforced concrete floor. The outer surface of the wall first wip 20mm thick 1: 3 cement mortar, cold base oil, and then paste the membrane, the membrane should be stitched paste, adjacent coil lap width of not less than 100mm. The top of the coil should be higher than the maximum water level of about 500mm, the outer side of the brick wall.
Q: Maintenance time of the cushion on the roof of the building
for the incorporation of retarding admixture or impermeable concrete , Not less than 14d;