• LDPE Nonwoven Geomembrane System 1
  • LDPE Nonwoven Geomembrane System 2
  • LDPE Nonwoven Geomembrane System 3
LDPE Nonwoven Geomembrane

LDPE Nonwoven Geomembrane

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing


No.

Item

             Test Value

0.75mm

1.0 mm

1.25 mm

1.5 mm

2.0 mm

2.5 mm

3.0mm

1

Minimum Density(g/cm³)

0.939

2

Tensile Property

Strength at yield,N/mm

11

15

18

22

29

37

44

Strength at break ,N/mm

20

27

33

40

53

67

80

Elongation at yield,%

12

Elongation at break,%

700

3

Tear Resistance   N

93

125

156

187

249

311

374

4

Puncture Resistance  N

240

320

400

480

640

800

960

5

Stress Crack Resistance, hrs

300

6

Carbon Black Content, %

2.0-3.0

Carbon Black Dispersion

1  or  2

7

Standard OTI  Min

100

High Pressure OTI  Min

400

8

Impact Cold Crack at -70°C

Pass

9

Water vapor permeability

(g.cm/cm2 .s.Pa)

≤1.0×10-13

10

Dimensional Stability (%)

±2




Geomembrane is a kind of waterproof material with basic raw material of high molecular polymer. It is mainly divided into LD PE geomembrane, , HDPE geomembrane, EVA geomembrance and all kinds of composite geomembrane.

  1. Complete variety of specifications of width and thickness. Thickness: 0.08-2mm/Width: 2-16m .

  2. Excellent environmental stress resistant cracking performance.

  3. Excellent performance of chemical erosion resistance.

  4. Big scope of application temperature and long service life .

  5. Applied in landfill waste site, sewage and filth treatment site, tailings depot and underground construction project


Q: Do you need a cushion on the ground floor?
In addition to wood also buy wooden side, used as the main beam, beam and pillars. The ground is also recommended to raise, raise the place also to beam and pillars The number of boards to be based on your design to determine the ground practice, roof practices will affect the number of wood
Q: The cushion is usually in the housing which parts
Cushion is generally at the base, looking for the use.
Q: Why do the basics of the cushion waterproofing
Base cushion waterproofing is not contact with the soil (Ying water) to prevent water into the cushion, but in the cushion and the base of the bottom of the contact, in fact, is the basis of the bottom of the waterproof.
Q: The top floor made waterproof playing cushion layer of how to do
3. The first layer to do a flexible waterproof, try the valve Bai fat together with the full bricks that are roof-specific anti-aging waterproof coating.
Q: Is the raft cushion waterproofing full of the cushion?
The request is full. Raft foundation do not do waterproof mainly depends on the design of the groundwater level considerations, calculated if the floor itself to meet the requirements, you can not do, and not rigid to do.
Q: Can the floor tiles be removed from the cement mats on the prefabricated board floor?
You can dig, but be careful not to use a strong earthquake with the machinery to remove, otherwise it will damage the original structure.
Q: What is the difference between leveling and cushion?
Cushion, the base material is not divided into materials at the same time, the design will be described. Material is the same concrete, the greater than 20CM calculated basis, less than, equal to 20CM calculated cushion. Leveling layer refers to the original structure due to the existence of uneven or slope and the laying of the base layer, is conducive to laying the surface layer or waterproof, insulation layer. The role is to play a leveling, looking for a slope or enhanced function.
Q: What is the relationship between the cushion and the ring beam?
There is no direct relationship between the cushion and the ring beam.
Q: How to build a fine stone concrete cushion?
The main role of the cushion is to meet the requirements of the design elevation. In addition, the cushion to meet the sound insulation, insulation, insulation, slope and buried pipeline and other functional requirements and set a variety of levels.
Q: Why calculate the amount of time to count a lot of cushion ah
It can be seen, in the preparation of the project budget, the cushion is also a very important sub-head, the amount of its calculation is often measured by m3, the current commonly used materials are concrete, gravel, stone, Stone slag), slag, slag concrete, lime and so on.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords