HDPE Geomembrane is a kind of waterproof material with basic raw material of high molecular polymer.
Complete variety of specifications of width and thickness. Thickness: 0.08-2mm/Width: 2-16m .
Excellent environmental stress resistant cracking performance.
Excellent performance of chemical erosion resistance.
Big scope of application temperature and long service life .
Applied in landfill waste site, sewage and filth treatment site, tailings depot and underground construction project
Items | Index | ||
LDPE | HDPE -1 | HDPE -2 | |
Tensile strength MPa | ≥14 | ≥17 | ≥25 |
Elongation at break% | ≥400 | ≥450 | ≥550 |
Right angle tearing strengthN/mm | ≥50 | ≥80 | ≥110 |
Carbon soot quantity | ≥2 | ||
Environmental stress resistant cracking performance | ≥1500 | ||
Oxidation induction time at 200min | ≥20 | ||
Permeability coefficient of vapor(g·cm/cm2·s·pa) | ≤1.0x | ||
Impact degradation performance at -70 | Pass | ||
dimension stability% | ±3 |
- Q: Do you need a cushion on the ground floor?
- In addition to wood also buy wooden side, used as the main beam, beam and pillars. The ground is also recommended to raise, raise the place also to beam and pillars The number of boards to be based on your design to determine the ground practice, roof practices will affect the number of wood
- Q: The cushion is usually in the housing which parts
- There was no other place in the house below
- Q: Why do the basics of the cushion waterproofing
- As for the bottom of the bar thickness of the protective layer is generally 4cm, but if the basic floor of the concrete label is relatively high, the protective layer can be appropriately reduced.
- Q: Is the raft cushion waterproofing full of the cushion?
- The request is full. Raft foundation do not do waterproof mainly depends on the design of the groundwater level considerations, calculated if the floor itself to meet the requirements, you can not do, and not rigid to do.
- Q: Cushion, waterproof layer construction to do what information
- 2, bedding (bed course) refers to the structure below the grass-roots level. Its main role is to water, drainage, antifreeze to improve the grass-roots and soil-based working conditions, the water stability requirements are better. The cushion layer is a structural layer between the base layer and the soil base. When the soil quality is poor, it is used to improve the water stability of the soil base, improve the water stability and frost resistance of the pavement structure and disperse Load to reduce soil deformation.
- Q: Large area ground concrete cushion seam Why is the separation of joints generally concrete
- hird, the relevant parts Different types of rigid waterproof layer separation spacing in addition to meet the calculation needs, but also in the following parts set sub-grid joints. 1. The deformation of the roof structure sensitive parts; 2. Roof and roof drainage direction changes; 3. The junction of the waterproofing layer and the protruding roof structure; 4. Under normal circumstances, each bay load-bearing walls should be set sub-grid seam. 5. Between the waterproof layer and the load-bearing or non-load-bearing parapet or gable should be set sub-grid joints, and in the node structure for proper treatment.
- Q: How to build a fine stone concrete cushion?
- The cushion is primarily responsible for the load coming from the surface and passes the load evenly to the structural or base.
- Q: Basement floor mattress dry to what degree can do coil waterproof?
- Third, the membrane waterproof in the construction should first do the basement floor of the waterproof, and then the membrane along the basement floor continuous paste to the outer surface of the wall. Basement floor waterproofing first in the foundation pouring C10 concrete cushion, the thickness of about 100mm. And then paste the membrane, and then in the coil to wear 20 thick 1: 3 cement mortar, and finally pouring reinforced concrete floor. The outer surface of the wall first wip 20mm thick 1: 3 cement mortar, cold base oil, and then paste the membrane, the membrane should be stitched paste, adjacent coil lap width of not less than 100mm. The top of the coil should be higher than the maximum water level of about 500mm, the outer side of the brick wall.
- Q: Why calculate the amount of time to count a lot of cushion ah
- In the building construction refers to the base is located below the cushion sometimes also served as grassroots. With the cushion, in the above work is convenient, clean, especially the mold, bar reinforced, pouring concrete and other processes, will not be affected by the basic earth pollution. Set the place where the cushion is generally based, floor, roof (slope) and so on.
- Q: Maintenance time of the cushion on the roof of the building
- Concrete watering maintenance time: the use of Portland cement, ordinary Portland cement or slag Portland cement mixed with concrete, not less than 7d;
Send your message to us
Compound Geomembrane
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords