• Landfill Geomembrane with Smooth Surface System 1
  • Landfill Geomembrane with Smooth Surface System 2
  • Landfill Geomembrane with Smooth Surface System 3
Landfill Geomembrane with Smooth Surface

Landfill Geomembrane with Smooth Surface

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Geomembrane specifications  

1) Thickness : 0.15mm - 4.0mm.

2) Width : Within 8 m (1m-8m).

3) Length : 50m-100m/roll (as request).

4) Material : HDPE,( LDPE, LLDPE, PVC, EVA ).

5) Color : Black , white , red , blue , or as required.

6) Optional surface : Textued(one or two side) or smooth surface.


7) Certificate:CE/ISO9001,14001

2. HDPE geomenbrane Features  

Good mechanical properties, high tear strength, deformation and adaptable, puncture resistance, anti-aging, anti-ultraviolet-resistant, Anti oil and salt, pH, anti-corrosion, high temperature-resistant, non-toxic, long service life. water, drainage, seepage, the good effect of moisture, width, thickness of the full range of specifications and low cost, simple construction.


No.

Item

             Test Value

0.75mm

1.0 mm

1.25 mm

1.5 mm

2.0 mm

2.5 mm

3.0mm

1

Minimum Density(g/cm³)

0.939

2

Tensile Property

Strength at yield,N/mm

11

15

18

22

29

37

44

Strength at break ,N/mm

20

27

33

40

53

67

80

Elongation at yield,%

12

Elongation at break,%

700

3

Tear Resistance   N

93

125

156

187

249

311

374

4

Puncture Resistance  N

240

320

400

480

640

800

960

5

Stress Crack Resistance, hrs

300

6

Carbon Black Content, %

2.0-3.0

Carbon Black Dispersion

1  or  2

7

Standard OTI  Min

100

High Pressure OTI  Min

400

8

Impact Cold Crack at -70°C

Pass

9

Water vapor permeability

(g.cm/cm2 .s.Pa)

≤1.0×10-13

10

Dimensional Stability (%)

±2



3. HDPE Geomembrane Applications  

1) Environmental protection, sanitation (such as solid waste landfills, sewage treatment plants, power plants Chi-conditioning, industrial, hospital solid waste, etc.) .

2) Water (such as rivers, lakes and reservoirs of the anti-dam, plugging, reinforcement of the canal seepage, the vertical wall of the heart, slope protection, etc.).

3) Municipal Engineering (subway, on the ground floor of the building, planted roof, the roof garden of anti-seepage, sewage pipes lining, etc.).

4) Landscape (man-made lake, river, reservoir, golf courses reservoirs of the substrate, slope protection, green lawn of the waterproof moisture, etc.).

5) Petrochemical (chemical plants, oil refineries, gas storage tanks of the anti-chemical reaction tanks, sedimentation tanks of the lining, etc.).

6) Mining (washing and pool heap leaching, the ash-field, dissolved, precipitation, the yard, the tailings seepage substrates, etc.) .


Q:Why calculate the amount of time to count a lot of cushion ah
In the building construction refers to the base is located below the cushion sometimes also served as grassroots. With the cushion, in the above work is convenient, clean, especially the mold, bar reinforced, pouring concrete and other processes, will not be affected by the basic earth pollution. Set the place where the cushion is generally based, floor, roof (slope) and so on.
Q:What is the relationship between the cushion and the ring beam?
There is no direct relationship between the cushion and the ring beam.
Q:What is the difference between leveling and cushion?
Cushion, the base material is not divided into materials at the same time, the design will be described. Material is the same concrete, the greater than 20CM calculated basis, less than, equal to 20CM calculated cushion. Leveling layer refers to the original structure due to the existence of uneven or slope and the laying of the base layer, is conducive to laying the surface layer or waterproof, insulation layer. The role is to play a leveling, looking for a slope or enhanced function.
Q:Is the raft cushion waterproofing full of the cushion?
Assuming (just suppose) the raft can easily turn over, then we do waterproof (like roof) directly on it, not waterproof on the cushion.
Q:Can the floor tiles be removed from the cement mats on the prefabricated board floor?
Cement cushion as a leveling layer on the floor, not designed to the structure of the load-bearing, the general can be dug, the cushion is generally 3 to 5 cm, chisel in addition to unloading the floor of the heavy objects, chisel in addition to the use of strong vibration Machine or penetrating machine is too large, with a small hammer small chisel, along the horizontal plane horizontal chisel, stripping cement cushion.
Q:Why do the basics of the cushion waterproofing
Base cushion waterproofing is not contact with the soil (Ying water) to prevent water into the cushion, but in the cushion and the base of the bottom of the contact, in fact, is the basis of the bottom of the waterproof.
Q:The roof cushion is waterproof on the slope roof
When the moisture generated by the ice dam into the external walls of the gap, the walls and insulation layer will become damp, which is the ideal environment for the breeding of mold.
Q:Can the cushion on the prefabricated board floor be dug?
1, can not be dug, the prefabricated board seam is too big. 2, in addition, now rarely used prefabricated panels, the earthquake effect is not good; especially after the Wenchuan earthquake. If it is cast-in-place floor, you can dig out.
Q:Foam concrete for the roof cushion generally do much bulk ah
in recent years, the density of 160kg / m3 ultra-light foam concrete is also used in construction projects.
Q:When the cushion is used, the thickness of the protective layer is not less than ()
Master roof: the general use of 40 thick C20 reinforced fine stone concrete protection.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords