Landfill Geomembrane with Smooth Surface
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Geomembrane specifications
1) Thickness : 0.15mm - 4.0mm.
2) Width : Within 8 m (1m-8m).
3) Length : 50m-100m/roll (as request).
4) Material : HDPE,( LDPE, LLDPE, PVC, EVA ).
5) Color : Black , white , red , blue , or as required.
6) Optional surface : Textued(one or two side) or smooth surface.
7) Certificate:CE/ISO9001,14001
2. HDPE geomenbrane Features
Good mechanical properties, high tear strength, deformation and adaptable, puncture resistance, anti-aging, anti-ultraviolet-resistant, Anti oil and salt, pH, anti-corrosion, high temperature-resistant, non-toxic, long service life. water, drainage, seepage, the good effect of moisture, width, thickness of the full range of specifications and low cost, simple construction.
No. | Item | Test Value | ||||||
0.75mm | 1.0 mm | 1.25 mm | 1.5 mm | 2.0 mm | 2.5 mm | 3.0mm | ||
1 | Minimum Density(g/cm³) | 0.939 | ||||||
2
| Tensile Property | |||||||
Strength at yield,N/mm | 11 | 15 | 18 | 22 | 29 | 37 | 44 | |
Strength at break ,N/mm | 20 | 27 | 33 | 40 | 53 | 67 | 80 | |
Elongation at yield,% | 12 | |||||||
Elongation at break,% | 700 | |||||||
3 | Tear Resistance N | 93 | 125 | 156 | 187 | 249 | 311 | 374 |
4 | Puncture Resistance N | 240 | 320 | 400 | 480 | 640 | 800 | 960 |
5 | Stress Crack Resistance, hrs | 300 | ||||||
6 | Carbon Black Content, % | 2.0-3.0 | ||||||
Carbon Black Dispersion | 1 or 2 | |||||||
7 | Standard OTI Min | 100 | ||||||
High Pressure OTI Min | 400 | |||||||
8 | Impact Cold Crack at -70°C | Pass | ||||||
9 | Water vapor permeability (g.cm/cm2 .s.Pa) | ≤1.0×10-13 | ||||||
10 | Dimensional Stability (%) | ±2 |
3. HDPE Geomembrane Applications
1) Environmental protection, sanitation (such as solid waste landfills, sewage treatment plants, power plants Chi-conditioning, industrial, hospital solid waste, etc.) .
2) Water (such as rivers, lakes and reservoirs of the anti-dam, plugging, reinforcement of the canal seepage, the vertical wall of the heart, slope protection, etc.).
3) Municipal Engineering (subway, on the ground floor of the building, planted roof, the roof garden of anti-seepage, sewage pipes lining, etc.).
4) Landscape (man-made lake, river, reservoir, golf courses reservoirs of the substrate, slope protection, green lawn of the waterproof moisture, etc.).
5) Petrochemical (chemical plants, oil refineries, gas storage tanks of the anti-chemical reaction tanks, sedimentation tanks of the lining, etc.).
6) Mining (washing and pool heap leaching, the ash-field, dissolved, precipitation, the yard, the tailings seepage substrates, etc.) .
- Q: The cushion is usually in the housing which parts
- First of all, the foundation refers to the basis of the ground below, the cushion is generally below the base, the base should be there, if the sewage treatment station, then you look at the sewage pool, the bottom of the pool should also have it
- Q: Foam concrete for the roof cushion generally do much bulk ah
- Foam concrete density grade is generally 300-1800kg / m3, commonly used foam concrete density grade 300-1200 kg / m3,
- Q: Roof waterproof mattress should play the number of centimeters appropriate
- Roof waterproofing can not use a single waterproof material, must be rigid and flexible combination of construction, flexible waterproof stretch is good, a little bit of settlement or deformation will not damage the waterproof layer. Rigid waterproof (ie mortar waterproofing agent) waterproof at the same time, can play a protective role, waterproof layer is not easy to be destroyed.
- Q: The top floor made waterproof playing cushion layer of how to do
- 3. The first layer to do a flexible waterproof, try the valve Bai fat together with the full bricks that are roof-specific anti-aging waterproof coating.
- Q: The roof cushion is waterproof on the slope roof
- and the formation of the ice dam will lead to roof water, water will find the path into the house.
- Q: Can the floor tiles be removed from the cement mats on the prefabricated board floor?
- Prefabricated board floor layer of cement layer is not called the cushion, should be called leveling layer, this layer can be eradicated, but should pay attention not to damage.
- Q: What is the difference between leveling and cushion?
- Cushion is generally used in the ground floor of the building, leveling layer is generally used in the floor or roof. According to the above analysis, I believe that we use the quota, where the floor, roof construction, it should be used to find the level of the fixed sub-head, because there is no so-called concept of the cushion, leveling layer thickness is not what Specific provisions can also be used at the same time different layers of leveling, but must be carried out in accordance with the design requirements, so as not to exceed the load;
- Q: What is the relationship between the cushion and the ring beam?
- Cushion is plain concrete or asphalt concrete (for groundwater soil corrosive strong site). Is located below the ground, in order to prevent the foundation or the concrete beam pouring when the excessive loss of water caused by defects set. The purpose is to ensure the quality of concrete, increase the durability of underground components
- Q: Basement floor mattress dry to what degree can do coil waterproof?
- Third, the membrane waterproof in the construction should first do the basement floor of the waterproof, and then the membrane along the basement floor continuous paste to the outer surface of the wall. Basement floor waterproofing first in the foundation pouring C10 concrete cushion, the thickness of about 100mm. And then paste the membrane, and then in the coil to wear 20 thick 1: 3 cement mortar, and finally pouring reinforced concrete floor. The outer surface of the wall first wip 20mm thick 1: 3 cement mortar, cold base oil, and then paste the membrane, the membrane should be stitched paste, adjacent coil lap width of not less than 100mm. The top of the coil should be higher than the maximum water level of about 500mm, the outer side of the brick wall.
- Q: Maintenance time of the cushion on the roof of the building
- for the incorporation of retarding admixture or impermeable concrete , Not less than 14d;
Send your message to us
Landfill Geomembrane with Smooth Surface
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords