HDPE Nonwoven Geomembrane
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Geomembrane is a kind of waterproof material with basic raw material of high molecular polymer. It is mainly divided into LD PE geomembrane, , HDPE geomembrane, EVA geomembrance and all kinds of composite geomembrane.
Complete variety of specifications of width and thickness. Thickness: 0.08-2mm/Width: 2-16m .
Excellent environmental stress resistant cracking performance.
Excellent performance of chemical erosion resistance.
Big scope of application temperature and long service life .
Applied in landfill waste site, sewage and filth treatment site, tailings depot and underground construction project.
No. | Item | Test Value | ||||||
0.75mm | 1.0 mm | 1.25 mm | 1.5 mm | 2.0 mm | 2.5 mm | 3.0mm | ||
1 | Minimum Density(g/cm³) | 0.939 | ||||||
2
| Tensile Property | |||||||
Strength at yield,N/mm | 11 | 15 | 18 | 22 | 29 | 37 | 44 | |
Strength at break ,N/mm | 20 | 27 | 33 | 40 | 53 | 67 | 80 | |
Elongation at yield,% | 12 | |||||||
Elongation at break,% | 700 | |||||||
3 | Tear Resistance N | 93 | 125 | 156 | 187 | 249 | 311 | 374 |
4 | Puncture Resistance N | 240 | 320 | 400 | 480 | 640 | 800 | 960 |
5 | Stress Crack Resistance, hrs | 300 | ||||||
6 | Carbon Black Content, % | 2.0-3.0 | ||||||
Carbon Black Dispersion | 1 or 2 | |||||||
7 | Standard OTI Min | 100 | ||||||
High Pressure OTI Min | 400 | |||||||
8 | Impact Cold Crack at -70°C | Pass | ||||||
9 | Water vapor permeability (g.cm/cm2 .s.Pa) | ≤1.0×10-13 | ||||||
10 | Dimensional Stability (%) | ±2 |
- Q: Foam concrete for the roof cushion generally do much bulk ah
- in recent years, the density of 160kg / m3 ultra-light foam concrete is also used in construction projects.
- Q: Can the floor tiles be removed from the cement mats on the prefabricated board floor?
- Prefabricated board floor layer of cement layer is not called the cushion, should be called leveling layer, this layer can be eradicated, but should pay attention not to damage.
- Q: What is the difference between leveling and cushion?
- and only in the construction of the building at the bottom of the building, it is possible to use the relevant level of the cube, After the use of the underlying layer of the building, it is not exempt from the possibility of using leveling layer
- Q: Cushion, waterproof layer construction to do what information
- 4, waterproof layer set and standard construction methods: to be painted 2 to 3 times, or should be added fiberglass cloth, and each brushing the thickness of the cured material shall not be less than 1 mm, and should be completely dry (about 5 -8 hours) and then the next construction. After brushing, but also in the paint waterproof layer to do a mortar protective layer, and finally paste the tile.
- Q: Is foam concrete suitable for use as a cushion?
- And then through the foaming machine pumping system for cast-in-place construction or mold forming, the formation of natural conservation with a large number of closed pores of the new lightweight insulation materials.
- Q: Large area ground concrete cushion seam Why is the separation of joints generally concrete
- Second, sub-grid seam set In order to reduce the total shrinkage and temperature stress of the large area waterproof layer, avoid the leakage of the waterproof layer due to the deformation of the structural layer and the change of the temperature and humidity, the waterproof layer should be divided according to the shape, size and structure of the flat roof, Stay sewn. The waterproof layer is divided into several squares.
- Q: What is the waterproof layer and the waterproof cushion in the tile roof?
- In the tile roof, to wait for the waterproof layer after the dry layer, or prone to the phenomenon of wall off. Waterproof layer set and standard construction methods: to be painted 2 to 3 times, or should be added fiberglass cloth, and each brushing the thickness of the cured material shall not be less than 1 mm, and should be completely dry (about 5-8 Hour) and then the next construction. After brushing, but also in the paint waterproof layer to do a mortar protective layer, and finally paste the tile.
- Q: Basement floor mattress dry to what degree can do coil waterproof?
- Third, the membrane waterproof in the construction should first do the basement floor of the waterproof, and then the membrane along the basement floor continuous paste to the outer surface of the wall. Basement floor waterproofing first in the foundation pouring C10 concrete cushion, the thickness of about 100mm. And then paste the membrane, and then in the coil to wear 20 thick 1: 3 cement mortar, and finally pouring reinforced concrete floor. The outer surface of the wall first wip 20mm thick 1: 3 cement mortar, cold base oil, and then paste the membrane, the membrane should be stitched paste, adjacent coil lap width of not less than 100mm. The top of the coil should be higher than the maximum water level of about 500mm, the outer side of the brick wall.
- Q: Why calculate the amount of time to count a lot of cushion ah
- ? In the municipal engineering, the bedding layer is a structural layer between the grassroots and the soil foundation. When the soil temperature is bad, the water temperature of the soil is improved and the water stability and frost resistance of the pavement structure are improved. Diffusible load to reduce soil deformation.
- Q: Maintenance time of the cushion on the roof of the building
- for the incorporation of retarding admixture or impermeable concrete , Not less than 14d;
Send your message to us
HDPE Nonwoven Geomembrane
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords