Geo-textile is usually used for filtration, isolation, reinforcement or preservation, with the characteristics of high tensile

1. Hydraulic Engineering: Inverse filtering & protection in reservoir dam, earth rock cofferdam, tunnel, gutter way, etc; Protection for impervious layer in artificial lake, river-way, reservoir, etc;
2. Road Works: Drainage work in retaining wall, road side slope, roadbed, under-layer of railway & airfield runway


Density

Thickness

Breaking Strength

Elongation of Fracture

CBR Bursting Strength

Vertical Penetration Parameter

Equivalent Aperture

g/m2

mm

KN/m

%

KN

cm/s

O95mm

65

1.2

2.8

40 ~ 80

0.7

K x (10-1 ~ 10-3)

(K = 1.0 ~ 9.9)

0.07 ~ 0.2

75

1.4

3.3

0.8

100

1.6

5.0

0.95

150

1.52

7.5

1.5

160

2.0

8.5

1.60

200

2.4

11

2.10

250

2.8

14

2.60

300

3.4

16

3.20

400

4.0

21

4.0

500

4.5

25

4.8





Q:Why calculate the amount of time to count a lot of cushion ah
Cushion cushion, as the name suggests is the structure of the liner layer, mainly from the back cover of the role, generally in the engineering design drawings have a clear approach (material).
Q:The cushion is usually in the housing which parts
Cushion is generally at the base, looking for the use.
Q:What is the relationship between the cushion and the ring beam?
There is no direct relationship between the cushion and the ring beam.
Q:Maintenance time of the cushion on the roof of the building
for the incorporation of retarding admixture or impermeable concrete , Not less than 14d;
Q:How to build a fine stone concrete cushion?
The main role of the cushion is to meet the requirements of the design elevation. In addition, the cushion to meet the sound insulation, insulation, insulation, slope and buried pipeline and other functional requirements and set a variety of levels.
Q:Can the floor tiles be removed from the cement mats on the prefabricated board floor?
Cushion generally no steel mesh, even if there can be removed, it is used to inhibit the cushion cement mortar layer cracking.
Q:Why do the basics of the cushion waterproofing
Base cushion waterproofing is not contact with the soil (Ying water) to prevent water into the cushion, but in the cushion and the base of the bottom of the contact, in fact, is the basis of the bottom of the waterproof.
Q:Is foam concrete suitable for use as a cushion?
The foamed concrete is a foaming system through a foaming machine that allows the foaming agent to be fully mechanically foamed and the foam is mixed evenly with the slurry.
Q:Roof waterproof mattress should play the number of centimeters appropriate
4. The second layer to do mortar waterproof (mortar waterproof), waterproof at the same time can protect the bottom of the flexible waterproof.
Q:Can the cushion on the prefabricated board floor be dug?
Prefabricated board floor layer of cement layer is not called the cushion, should be called leveling layer, this layer can be removed, but be careful not to damage the prefabricated plate.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords