• Steel Tunnel Formwork System System 1
  • Steel Tunnel Formwork System System 2
Steel Tunnel Formwork System

Steel Tunnel Formwork System

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Building Tunnel Formwork:

A compositional steel formwork system mainly used in the building which has regular structure

without beams, the excellent formwork system can make the integral pouring for the wall & slab

easily achieved.


Characteristics:

◆ No assembling, easy operation with formed formwork.

◆ High stiffness, make perfect shape for concrete.

◆ Repeatedly turnover is available.

◆ Widely applied range, such as building, bridge, tunnel, etc.




Q:The tunnel has the super big pipe shed and the lead small conduit, is carries on the blasting excavation first or carries on the advance support first, has the anchor rod in the tunnel, this between the construction craft order is any
The excavation of invert waterproof plate, blind pipe and steel bar at the bottom of the tunnel, and the pouring of invert arch
Q:12 meters of the tunnel car, under normal circumstances, one of the two months to be able to cast a few models?
According to the normal situation, three days a lining cycle, a month to play at least 9 plates!
Q:How the arch of the tunnel concrete pouring up, how to support before pouring, using I-beam is directly support the earth?
The excavation of the tunnel face, slag, to the primary support system, first hit the bolt, then use steel or steel made of steel, installation support in tunnel contour, and then sprayed concrete (poor surrounding rock hanging steel mesh, then sprayed fiber concrete).
Q:Main diseases and prevention of tunnel
Tunnel shotcretePhenomenon: the concrete spray layer and the rock surface is not bonded, concrete spray layer between the bond is not good.Cause analysis: the loose rock not clear spray surface; shotcreted rock debris is not scum washing or flushing thoroughly with wind pressure, water pressure; surface by spraying water, water, water concentration of untreated concrete spraying interval; before a layer of spray surface without wind, water washing scum. The air pressure is inconsistent with the spray distance.Preventive measures: remove the loose rock, clear surface by spraying of water, slag floating debris; water, concentrated water point of the surface by spraying with gouge, guide the drainage treatment of buried pipe; sprayed concrete before spray test, to determine the wind and spray distance coordination relationship between.
Q:There are no recycling tunnel templates
If it is a tunnel two lining car template, and the use of the tunnel after the car can continue to use the value of such a tunnel lining car basically has a market of two, but also to be recycled. The specific recovery and continue to use, mainly to see the two lining of the tunnel and the old and new without modification.
Q:Design of lining concrete is C30, what should be used in the construction of concrete arch cushion concrete?
Now the actual project is basically C15, if the economy is less than C15.
Q:Demolition of tunnel bearing formwork for several days
With the temperature, the need for concrete strength of 100% to remove the template
Q:How to fill in the tunnel template
There seems to be a quality inspection form,Send a template to see
Q:1 tunnel lighting design steps, 2 teacher said to design a template, is not to create a tunnel, and then according to the numerical calculation of what?
When the light into the human eye increases, the pupil contraction, when the surrounding environment becomes dark; into the human eye when the light is reduced, the pupil increases.
Q:What are the steps? If you build a template, how to fill in the concrete. The tunnel is to dig all the generalist pouring, or digging into the side. Simply say. Better picture. In addition, we have seen a video, the shield machine to dig up the tunnel after the installation of a number of prefabricated panels, but these prefabricated plate is curved. Do not have to fill in a semicircle tunnel?
Pouring should be set up before the template, the concrete template will be about 50mm*50mm of the pouring bin.After the excavation of the shield, the top arch and the top arch of the casting template are separated, so you can see the situation similar to the arc.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords