• Tunnel formwork system for building construction System 1
  • Tunnel formwork system for building construction System 2
Tunnel formwork system for building construction

Tunnel formwork system for building construction

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Building Tunnel Formwork

A compositional steel formwork system mainly used in the building which has regular structure

without beams, the excellent formwork system can make the integral pouring for the wall & slab

easily achieved.


Characteristics:

◆ No assembling, easy operation with formed formwork.

◆ High stiffness, make perfect shape for concrete.

◆ Repeatedly turnover is available.

◆ Widely applied range, such as building, bridge, tunnel, etc.




Q: The tunnel structure of plastic mould
In the use of the whole tunnel mode is not as flexible as semi tunnel mode, the lifting equipment requirements are higher, it is gradually being semi tunnelMode substitution.
Q: Highway bridge template needs, probably with the thickness of both the construction requirements can be met, and more cost-effective?
It is best to use the high turnover times, can also be used as the use of the beam die, more cost-effective
Q: For example, lining, invert, bias and so on words,, to answer the full thank you
You haven't even touched the tunnel. Simply to say that the lining is the use of concrete or reinforced concrete tunnel inside the template pouring. The author is to stabilize the stability of the rock itself, followed by the tunnel in order to facilitate the application of.
Q: Would you please tell me the difference between the concrete and shotcrete in the tunnel?
Characteristics of shotcrete:(1) the sprayed concrete has the characteristics of rapid growth, strong bonding force, high density and good impermeability. It can better fill the gap between the rock blocks, increase the integrity of the surrounding rock, prevent the free surface weathering and loosening, and work together with the surrounding rock.(2) the construction of shotcrete will transfer, pouring and tamping a few processes into one, and do not need a template, so the construction of fast, simple.(3) sprayed concrete can play an important role as early as possible.(4) compared with the concrete, the physical and mechanical properties of sprayed concrete are improved.
Q: How the arch of the tunnel concrete pouring up, how to support before pouring, using I-beam is directly support the earth?
The excavation of the tunnel face, slag, to the primary support system, first hit the bolt, then use steel or steel made of steel, installation support in tunnel contour, and then sprayed concrete (poor surrounding rock hanging steel mesh, then sprayed fiber concrete).
Q: What is the simple calculation method of the tunnel excavation unit price
Comprehensive unit price methodAs the calculation method of this method and the project of comprehensive unit price, is calculated according to the real need of engineering cost measures the amount of consumption and real price, applicable to the calculation of the amount of engineering projects, mainly refers to the number of entities are closely linked and engineering projects, such as concrete formwork, scaffolding, vertical transportation etc.. Different from the sub project, it is not required that the comprehensive unit price of each measure must include the labor cost, material cost, mechanical cost, management fee and profit.
Q: What are the steps? If you build a template, how to fill in the concrete. The tunnel is to dig all the generalist pouring, or digging into the side. Simply say. Better picture. In addition, we have seen a video, the shield machine to dig up the tunnel after the installation of a number of prefabricated panels, but these prefabricated plate is curved. Do not have to fill in a semicircle tunnel?
Pouring should be set up before the template, the concrete template will be about 50mm*50mm of the pouring bin.After the excavation of the shield, the top arch and the top arch of the casting template are separated, so you can see the situation similar to the arc.
Q: A detailed method is introduced
1 overall construction planUsing the new Austrian tunneling method, the construction principle is "less disturbance, early spray anchor, ground measurement, tight closure". The rock excavation method of construction; rock class micro bench excavation, pre splitting blasting; IV surrounding rock by construction method (Section IV surrounding rock under the partial, the construction step method), smooth blasting technique; fault fracture zone by middle wall construction method.The ballast is unloaded by the side unloading loader.Two lining the rail trolley, concrete mixing truck to transport concrete, pumping concrete, lining after decoration engineering construction.It is necessary to strengthen the geological prediction in the fault fracture zone and water rich zone, and provide the basis for the construction.
Q: Two tunnel lining reinforced concrete template to price behavior can be contracted
There is two times of lining concrete pouring, the normal price is within 100 yuan, this is the pure artificial price, does not contain steel trolley and various materials two tunnel lining.
Q: 12 meters of the tunnel car, under normal circumstances, one of the two months to be able to cast a few models?
According to the normal situation, three days a lining cycle, a month to play at least 9 plates!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords