• The most favorable alien template apply for construction project System 1
  • The most favorable alien template apply for construction project System 2
  • The most favorable alien template apply for construction project System 3
The most favorable alien template apply for construction project

The most favorable alien template apply for construction project

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 watt
Supply Capability:
5000 watt/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

CNBM alien template

Product Introduction:

With the rapid development of urban rail transit project, the formwork mold is widely used in construction project.  It have the advantages of noise-reduction good effect, low building height, high space utilization and good appearance.

 

With the progress of technology, construction method changes from cast-in-place to precast hoisting.

The most favorable alien template apply for construction project

Specification:

Precast U-Beam formwork structure: outer side formwork, inner formwork, bottom formwork, support lead screw, JACK, work platform, Vibrator, crawling ladder, blanking plate etc.

 

Main products covers:

U-shaped beam

Segmental beam

Climb mold

Integrated pipe gallery

Automatic Prefabrication culvert

Shaped pier

T-beam

Alien template

 

Applied formwork Project:

The most favorable alien template apply for construction project

Our products capacity:

More than 3 state grade certificates
More than 40 patents
More than 10 series main products
More than 10 government and project awards

 

WORKSHOP & EQUIPMENT:

 

 Technology

We offer on site consultation and safety advice to help our customers work safely and improve productivity in each project.

CNBM combines its staff experience with advanced CAD systems and self-developed software to do this job to better meet the market requirements.

FAQ:

1. What we need for formwork design and make proposal?

  Please offer the project drawing, CAD drawing for making design accurately.

2. How fast can the order be delivered?

Please kindly state your desired Delivery date for the order. The order and the desired delivery date will be checked after your order got sent. Of course, we will try our best to meet the specified delivery date.

3. What's the material of the products?

Steel Q235B or Q345B. 

 

Q: How to put the beam formwork in concrete structure
The four sides of the column should be the line, there is a beam of the position of the edge out
Q: When Liang Banzhong beam template calculation is the calculation of him in the board? Because in the calculation of engineering quantity of concrete beam by beam plate calculation. But when the template is, the book is not clear. In the calculation of the time quota template can have a beam plate.I use the Guizhou 04 quotaEspecially your last sentence, I haven't said anything yet,There is the Guizhou 04 fixed and did not say what sub beam frame beam separationAbove the beam plate is to explain the main beam, sub beam and plate, according to the calculation of beam and plate volumeThen you explain to me the frame beam is not the main beam? According to this explanation, why do you separate the frame beam
There are beams and plates in the plate with a secondary beam, the frame beam can not be calculated, in the calculation, the plate and the secondary beam of the amount of work together, are the implementation of beam and plate
Q: The formwork support is a beam template which is connected with both sides of the vertical rod and the force at the bottom of the beam and the force of the vertical wire rod which is arranged below the transverse beam at the bottom of the beam
Calculation of anti slide of fasteners? the sliding bearing capacity of the fastener is calculated in accordance with the following formula (5.2.5):R = Rc
Q: For example, a beam 200*400, length 5000Plate thickness 1005000*5000The area of the template is1, (0.2+0.3*2) *5+5*52, 0.3*2*5+5*5Which is right
The beam of the template is to calculate the beam height (minus the plate thickness of the part) * net long *2 surface. The bottom die has been calculated in the bottom plate.Louzhu certainly not familiar with the construction site, as long as the scene to see how the template is placed.
Q: There are times when the beam is not to deduct the secondary beam on the main part of the beam?
The general situation is calculated according to the contact area between the concrete and the template
Q: Beam column plate template how to calculate the need to deduct what part?
The second is to calculate the template of the beam to calculate the template of the beam with the section length multiplied by the length of the unit is M2Finally the board notice when calculate the template template amount is peripheral template must take and post together part to deduct the intersection with beam part to be deducted
Q: How to do the foundation beam template
Construction sequence: the structure of the column to tie the tendons to the skin of the number of poles to wall masonry before the first floor on the ground has been played by the large axis of the wall body axis and the line. The surface of the base should be clean and wet. When you start the masonry, the brick should be placed and the seam width should be discharged. In the walls before the first vertical skin pole pole, skin should be marked with each skin brick and mortar joint thickness, lintel ring, position, number of rod should be set up in the skin of the building end corner, wall aspect junction and interior wall. Masonry should be up and down the wrong seam, inside and outside the lap, gray seam straight full, the level of gray seam thickness and vertical ash seam width should be controlled at around 1-1.1cm
Q: Seeking beam, plate template engineering quantity
Plate template (bottom area): (2.6*3- wall thickness) * (2.4*3- wall thickness) - (2.4*3- wall thickness) *0.2*2 [main beam] - (2.6*3- wall thickness) *0.25*2 [sub beam]
Q: A set of 50 m T beam steel template weight
So as to complete the precast beam and slab
Q: What is the demolition order of the construction template
Template removal sequence:General is the first non load bearing template, but bearing template; the first side plate, the back plate. Follow the line after the demolition, the demolition of non weight-bearing parts, the demolition of the load-bearing parts and the principle of top-down,

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches