Custom High Security H20 Timber Beam Formwork for Straight Concrete Wall
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of H20 Timber Beam Formwork for Straight Concrete Wall
TBW system-A is a kind of formwork for pouring straight wall, it is composed of several pieces of Tim-formwork, yoke, tie rod, wing nut, etc.
It will be designed according to wall’s size.
2. Main Features of H20 Timber Beam Formwork for Straight Concrete Wall
1. Prefabricated connection, convenient and efficient.
2. Light weight but high bearing capacity.For conventional design, its load bearing capacity is 60KN/m2 with weight of 55-60kg/m2. If required, the formwork can be specially designed for higher concrete pressures.
3. Timber is easy re-sized, so the Tim-formwork is relatively easier to change self’s size and shape. This approved formwork’s economical efficiency.
3. H20 Timber Beam Formwork for Straight Concrete Wall Images
4. H20 Timber Beam Formwork for Straight Concrete Wall Specification
5. FAQ of H20 Timber Beam Formwork for Straight Concrete Wall
1) What can we do for you?
We can ensure the quality of the vinyl banner and avoid extra expenses for customers.
We can provide you the professional design team.
We can provide fashionable and newest styles for you.
We can design the artwork for you.
Please feel free to customize.
2) What promises can be done by us?
If interested in H20 Timber Beam Formwork for Straight Concrete Wall, please feel free to write us for any QUOTE.
If printing required, please advise asap because the whole set need much more time to complete.
Please DO check goods when courier knocks your door and contact us asap if any issue.
3) What about of our after-sale service?
Response will be carried out in 24hours after receiving any complain or request.
If the products are not based on the requirements, there will be the relevant compensations made for you.
4) What about the package and shipping time?
Packing: As Customer's Requirements
Shipping: We have various shipping ways for our customers, such as express which including TNT, DHL, FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.
Shipping time:Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. Other mass qty of H20 Timber Beam Formwork for Straight Concrete Wall, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.
- Q:How to calculate the length of the beam, beam template area
- The two cross KL76, distance of each cross axis of the pillar width is Jingchang (beam by beam, high *2+ Liang Kuan)
- Q:Beam plate with a few face template
- There are beams and plates, the 3 words behind the content should be said board...
- Q:The formula for the calculation of beam, concrete and brick
- According to the section size of the picture multiplied by the length of the beam. The length of the beam and the height of the beam shall be determined according to the following provisions:1, when the beam is connected, the length of the beam to the column side.2, the main beam and secondary beam connection, the second beam length to the side of the main beam. The volume of the beam head and beam in the wall is calculated into the beam volume.3, and lintel connection, respectively apply lintel beam, fixed. Lintel length calculation according to the requirements of the design, design requirements, width according to windows and doors, both ends of the 250mm calculation.4, ring beam and beam connection, beam volume should be deducted into volume within the beam.In 5, beam parts picked out wall concrete beams with external edges out of bounds, according to the size in cubic calculation, apply a single beam and continuous beam project.
- Q:The calculation of formwork engineering quantity of ground beam needs to calculate the bottom of beam
- The calculation of the formwork quantity of the beam is not needed to calculate the bottom of the beam
- Q:How to calculate the amount of beam template? FiveKL2: cross section size of 0.3*0.6, thickness of the 0.12 beams, 10.9 JingchangAsk: how to calculate the amount of formwork works? How to calculate the height of support?Calculation formula
- According to the calculation of the expansion area, the height of support according to the bottom elevation
- Q:How to calculate the intersection of rectangular column and beam
- Column high: beam slab column column should be high since the surface (or floor surface) first height calculation between the surface layer of the floor slab; column height should be from column surface (or floor surface) to calculate the height of column cap between the lower surface of the frame column should be high; the height calculated from the upper surface to the top of the column base; structural column height should be at the bottom of the column to column (from beam bottom) height calculation;
- Q:The bottom of the board 12.24*7.44 why not *2 floor 12.24 of the two of the 7.44 also have the plate side mode *2 is * of the two or both
- The board side mode *2 is the circumference of the board (minus column protruding part) multiplied by the thickness of the plate 0.1m.
- Q:Beam column plate template how to calculate the need to deduct what part?
- The second is to calculate the template of the beam to calculate the template of the beam with the section length multiplied by the length of the unit is M2Finally the board notice when calculate the template template amount is peripheral template must take and post together part to deduct the intersection with beam part to be deducted
- Q:The section size of the beam is 200 x 400 the size of the board is 4500 x 4000 plate thickness of the formula for 120 - a rookie
- Building template:Building template is a temporary support structure is made according to the design requirements, the concrete structure components, according to the position and size of the provisions of forming, maintaining its correct position, external loads and under construction template gravity and acting on the. The purpose of template engineering is to ensure the quality of concrete engineering and construction safety, speed up the construction progress and reduce the cost of the project.This paper introduces the construction formwork structure of cast-in-place concrete structure construction, which is mainly composed of three parts: the panel, the supporting structure and the connecting parts. The panel is in direct contact with the bearing plates of concrete; supporting structure is a temporary structure supporting panel, concrete and construction load, ensure the construction template are firmly combined, do not deform and damage; the connecting piece is connected to the panel and the supporting parts of the whole structure.Building formwork is the concrete pouring forming shell and support, according to the nature of the material can be divided into building template, building wood plywood, covered with plastic board, multilayer board, double-sided adhesive, double-sided coated building template. According to the construction process, the construction formwork can be divided into the cast in place concrete formwork, the pre assembled template, the large formwork, the jump formwork and so on.
- Q:I only see the span is greater than 4M of the beam arch height is 1/1000~3/1000, if that is 5m, 8m, 12M, 16m and even assuming 20m, the supply is only 1/1000~3/1000????
- 1, in order to prevent the concrete weight and construction load to other beam and plate template pendulous; if there is no design provisions, the arch height is the length of the cross beam and plate 1/1000~3/1000; (general wood template for 1.5/1000~3/1000; steel template for 1.5/1000~2/1000.)
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Custom High Security H20 Timber Beam Formwork for Straight Concrete Wall
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches