Car Window Channel

Hot Products

FAQ

What are the ancillary facilities for construction works?
If it is built, then the building of the ancillary facilities: connected with the house covered with no pillars of the corridor, eaves Gallery; is a permanent building independent column, single row of porches, sheds, shed, etc .; Balcony, no corridor; outdoor roof with no cover; a permanent overhead gallery with no cover. Facilities: elevator shaft, garbage road, substation room, equipment, public hall and aisle, basement, duty guard room.
Computer installed before the last question asked, what is the great God to account for it?
The set-top box behind the plug in the signal line re-inserted, if the connector is loose, open to re-organize the good, see whether the indoor signal line is damaged or poor quality of the phenomenon, there are still problems, call customer service call customer service door repair.
CPU: AMDX3440 motherboard: Gigabyte MA770T-UD3P memory: KingmaxDDRG hard drive: Seagate 12 generation 500G single disc graphics card: sapphire HDGB Platinum Edition more
Upstairs ..... i3 spike most of the AMD quad-core CPU? I3 is also better than the X3635 (games and office, the game is mainly on the 4-core support is not good, this gap you do not feel out) but in the real multi-threaded processing completely no native 4-core X3635 strong AMD low End 4 nuclear also 630 and 635 simply not on the spike and Phenom series of 4 nuclear can be spike I3
I engage in electronic technology, the computer is not very proficient in understanding, consult prawn friends, the transformation of a laptop machine biggest technical bottleneck in there? How to solve this technical problem? My main purpose is to exercise their own innovative ability and practical ability, there are fever friends welcome communication, thank you! Creative fresh continue to add points, have the opportunity to gift! More
Generally for the KBG tube with the first, reliable connection, the use of special connectors, connecting pieces must be broken wire must be twisted off. Second, laying the length of the length of more than 30 meters should be added over the box, there is a right angle bent more than 20 meters should be added over the box, there are two right angle bent more than 15 meters should be added over the box, there are three right angle greater than 10 Meter should be added over the box. The The Third, the wall fixed or hanging fixed fixed is generally not more than 2 meters fixed once, turn within 1 meter fixed time, the wall fixed use of special cards (such as saddle card, ingot card, etc.). Fourth, do cross the ground, the pipe and tube connection, tube and box connection, pipe and bridge connection, with BV2.5 or BV4 do spring-like tube and tube or bridge or box at both ends of the connection connection. Fifth, the wall brush anti-rust paint and fire retardant paint if the metal hose or Puli card tube with the configuration, the length is also required, the specification requires no more than 1.2 meters lighting system, the power system does not exceed 0.8 meters.
I have no special needs, that is, on the Internet, take a look at the series, boarding a netbook or something. If the price is too low, I worry about less than a year or so the computer is slow with the turtle like, but not too expensive. I see now 4G memory with two years, no cleaning, and now boot to 3 minutes, so would like to ask about memory or 8G, 16G, CPU with what model. Thank you. The best between 3000 ~. More
Ordinary harness belt (nylon) is divided into: self-locking nylon cable ties, signs harness belt, live buckle cable belt, tamper (seal) cable belt, fixed head cable belt, bolt (aircraft head) Beam line belt, bead line with cable, fish bone cable belt, weathering cable belt and so on
I see some on the graphics card has a row of a needle! What was it at that time? More
Red is generally FireWire do not touch green is zero line
Operating computer supplies, wires, weak engineering, computer maintenance, mobile phone accessories, mobile phone maintenance need to pay what tax......................................................
This depends on you to do that a few process links, the cable production of the main process are: melt, drawing, plastic, wire, coding, etc., if the full set of estimated at 300 million, if you do plastic Such as after the Road, estimated at 50 to 80 million between. Of course, there are many specific details and matters, each different.
Does anyone know how to set up a small office network, what parts do I need?
Twisted pair transmission distance is better, but if your side of the transmission distance if within 500 meters, it is recommended that you use the video line on the line, affordable.