• Tower Crane of Chang Li Model Number  QTZ125 System 1
  • Tower Crane of Chang Li Model Number  QTZ125 System 2
  • Tower Crane of Chang Li Model Number  QTZ125 System 3
Tower Crane of Chang Li Model Number  QTZ125

Tower Crane of Chang Li Model Number QTZ125

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ125 Description

Feature: Tower Crane

Condition: New

Application: all kinds of construction

Rated Loading Capacity: 5T,6T,8T,10T,12T

Rated Lifting Moment:500KN.m/630KN.m/800KN.m/1000KN.m/1200KN.m

Max. Lifting Load: 5T,6T,8T,10T,12T

Max. Lifting Height:120m/120m/150m/150m/150m

Span: 120m/120m/150m/150m/150m

Place of Origin: Henan, China (Mainland)

Brand Name: YUJIE

Model Number: QTZ125

Certification: CE,ISO,BV,SGS

Warranty: ONE YEAR

After-sales Service Provided: Engineers available to service machinery overseas

color: according to the customer's requements

QTZ125   Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

9. Engineers available to service machinery overseas.   

QTZ125  Specification

 Tower Crane of Chang Li Model Number  QTZ125

50M QTZ-63   Pictures

 

Tower Crane of Chang Li Model Number  QTZ125

Tower Crane of Chang Li Model Number  QTZ125

Tower Crane of Chang Li Model Number  QTZ125

QTZ125  FAQ

Q: What is the building hoist main purpose?

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal construction equipment for vertical transportation in the field of construction.


Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.


Q: What is tower crane?

A: Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.




 

 

 


Q: we using EOT crane my company
Your okorder /... contact them with your enquiry. You must include Model and anticipated loads as that determines torque applied. Seed is operator dependent for safe operation.
Q: how is a tall crane constructed? how can they put the crane on top of its tall body frame?
They first construct the top of crane on the ground with help from other mobile cranes. This includes the long horizontal part with the operator's cab, and the concrete counterweight. this is then placed on a climber, with which the crane kind of builds and climbs itself to the necessary height. Every vertical section of the crane is placed in the climber. When the piece is in place, the climber climbs to the top of piece from where the next vertical piece is placed and so on. You can see how a crane is constructed in the website I've cited below:
Q: 3years after I quit a job,I am once again looking toward the same field it's just that in my old job they helped me get a crane license when I left the job they kept my certification .How can i get that info without asking my old work for it,or would i have to take the course over?
If it's still valid all you need to do is get a duplicate from the agency that issued it.
Q: my father is owning a crane manufacturing business I hav given my ssc wat should I study after ssc IT, mechanical engg., design engg. and others (plz. specify) ?
Without being too critical, the first thing you need to do is improve your English so that you will be a huge help in the company whether in engineering or sales. Cranes require lots of engineering in weight handling (mechanical), automation and controls including instrumentation (electrical) and a tertiary field in engineering is in stopping and starting (clutches and brakes) which can be mechanical or hydraulic engineering. A new filed is metalurgy which is concerned with the way metals perform (stress), lighter,stronger, etc. Take your choice. Mpho
Q: I am looking for what the breeding season is for sandhill cranes?
Mid-April to mid-June is breeding season for Florida Sandhill cranes lasts from December-June. For most other cranes, like those here in the midwestern U.S., the breeding season is March and April. I'm fortunate enough to live not too far from the Jasper Pulaski Fish and Wildlife Area where the Sandhill Cranes migrate every spring and fall. I always go to see this spectacular event.
Q: How do they get the cranes and counterweights down off the top of buildings when finished?
The cranes and counterweights aren't on top of the building. They are on the ground constructed with structural steel supports.
Q: S930 M50 (M125/75) level jib tower crane about how much money
With the ten standard section, not to Sishijiwan
Q: I only wish to know about Tower Cranes, not any other type of crane. Also only wish to know about cranes on the job, not sitting in a crane yard. I am an operator and looking to move and want to know where the work is best so a list of top five would be terrific. Thanks.
We have been told that our state bird was a crane. That's because there are so many of them here all the time. Construction is booming in Oklahoma. I think most of them are coming from the east and west coasts. They can get a much larger house here for a whole lot less. They are sold when they are being built.
Q: Why are electromagnets on junkyard cranes generally circular in shape?
the guy above me has it pretty much right. It's very easy to make a cylindrical electromagnet, the calculations for it are easy as well, compared to other shapes of coil; they also generally produce a very simple, elegant magnetic field. More complicated shapes would change the shape of the field and give weird results when you try to get things to stick to it.
Q: how do they erect those large tower cranes you see on big building projects?
with another crane. assemble the tower first in sections, assemble the jib on the ground then lift it into place

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords