Tower Crane TC5613
- Loading Port:
- China Main Port
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 1 Unit unit
- Supply Capability:
- 500 Units Per Month unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Description of TC5613
1) CMAX TC5613 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;
3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator
Specifications of TC5613
Model: TC5613
Jib Length: 56m
Tip load: 1.3T
Max load: 8 ton
Free type height: 46m
Mast Section: 1.8x1.8x2.5m
Packaging & Delivery of TC5613
40HQ container
30~35days after deposit
- Q: I am going to make 1000 paper cranes like Sadako Sasaki did. I am doing it to remember the victims of hiroshima and nagasaki and all the others who died as a result of wwii. especially sadako sasaki who, though she died in 1955, she was poisoned by the toxic gases in hiroshima. what do you think of my project, and got any tips to help?
- Well first of all, i highly recommend that buy some Anti-Pope spray just in case you have jesus christ knocking at your door. Then i recommend that you make a cake. Preferably , a banana, as this is my favourite. And send it to me in the mail. By now, i will bless you that your house and family as well as friends, are all wished well and that you are not killed from one of your paper cranes stabbing you in the eye. I also recommend getting life insurance. God only knows how sharp paper is and it rly rly hurts. Then eat some Chicken, Avacado Sushi because everyone knows that is brain food. I finish off by commending you and by saying. See you on monday.
- Q: What are the "2 magnification" and "4 magnification" mentioned in the lifting characteristics table of tower cranes?
- Popular saying: "car to hook this section of vertical distance, you see 4 wire rope is 4 magnification, you see 2 wire rope is 2 magnification.".
- Q: If there was a fight between Stefano DiMera and Allistar Crane, who would win?
- Stefano Dimera would win. He's the ultimate villain. Allistar Crane is a Stefano Dimera wannabe!
- Q: How much do you know about construction cranes??
- The okorder / to have a look!
- Q: Why do tower cranes need to be fabricated?
- Cement prefab, are generally large components, especially bridges more, including buildings, these components of large size weight, super wide is the transportation, these components must be used crane, crane can meet the needs of the heavy transport of goods.
- Q: What are the lifting moment requirements for tower cranes?
- 1. Tower crane consists of three parts: metal structure, working mechanism and electrical system. The three main technical parameters are lifting moment, lifting weight and working speed. Lifting moment refers to the boom as the basic arm length maximum amplitude corresponding to the rated lifting weight of product, product or maximum weight with the corresponding inflection point.
- Q: how can we minimize energy losses of a crane to reduce the impact on the environment?
- No hint as to what type or size of crane, so I assume it is a large overhead traveling bridge crane inside an industrial building: Consult the manufacturer for recommendations. Change its power source to something cleaner (from diesel to propane or electric). Properly lubricate and adjust all moving parts. Turn power off when idle. Schedule heavy usage during hours of low demand of electric utility power. Replace motor with a more efficient new one. Replace entire crane with a new efficient one. Replace the large capacity one with one or more smaller units.
- Q: Tiger=StrengthSnake=FlexibilityCrane=Balance and the last two are?
- There's way more than 5, there's actually over 300 styles of Kung Fu.
- Q: Question says it all. On the Yahoo homepage, there is a breaking story that you can not click on, stating the NY fire department are responding to a building collapse, but when you try searching it, only a story about a crane comes up in Yahoo search engine. Anyone know if it's 2 different stories or the same thing?
- Yes there was a fire on a 4 story buildilng 8th and 14th St. The outer facade of the building collapsed. The fire dept was fighting the fire. Then they've got a crane on a highrise that is dangling. They said they have to get inspectors to climb the 74 stories of stairs to go inspect it. Now they are also saying it's an extra tropical storm with a cold core which turned it into a super storm. Everyone thinks the eye came in but no it reformed and eye has not come in yet the weather service said. If it combines with all that cold arctic air more people are going to get blizzard like conditions.
- Q: I was interested in the Japanese legend of folding a thousand cranes. It was said that if a person was able to fold 1 000 cranes, you get to make a wish.I'm just wondering; let's say I'm done with all 1 000. What do I do next? One of my friends told me you had to burn all one thousand cranes, while another suggested to put the last one in a bottle and set it out in sea.Did it ever state what to do in the end, after folding all the cranes? If it does, please enlighten me :3Thank you :)
- I've only heard of putting them up on strings and you could give them as gifts .. Oh and you could also frame them by laying them flat
1. Manufacturer Overview
Location | SHANGHAI,CHINA |
Year Established | 2000 |
Annual Output Value | Above US$100 Million |
Main Markets | CHINA |
Company Certifications | ISO 9001:2008; |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Shanghai |
Export Percentage | 0.8 |
No.of Employees in Trade Department | 600 People |
Language Spoken: | English;Chinese; |
b) Factory Information | |
Factory Size: | Above138,000square meters |
No. of Production Lines | Above 2 |
Contract Manufacturing | OEM Service Offered;Design Service Offered |
Product Price Range | Average |
Send your message to us
Tower Crane TC5613
- Loading Port:
- China Main Port
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 1 Unit unit
- Supply Capability:
- 500 Units Per Month unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords