• Tower Crane of Chang Li Model Number  QTZ/TC System 1
  • Tower Crane of Chang Li Model Number  QTZ/TC System 2
  • Tower Crane of Chang Li Model Number  QTZ/TC System 3
  • Tower Crane of Chang Li Model Number  QTZ/TC System 4
  • Tower Crane of Chang Li Model Number  QTZ/TC System 5
Tower Crane of Chang Li Model Number  QTZ/TC

Tower Crane of Chang Li Model Number QTZ/TC

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
60 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ/TC  Description

Feature: Tower Crane

Condition: New

Application: All kinds of costruction

Rated Loading Capacity: 4T

Rated Lifting Moment:500/630/800/1000/1200KN.m

Max. Lifting Load: 4T

Max. Lifting Height: 150m

Span: 42M

Place of Origin: Henan, China (Mainland)

Brand Name: Yu Jie

Model Number: QTZ/TC

Certification: ISO,CE,BV,SGS

Warranty: 12 months

After-sales Service Provided: Engineers available to service machinery overseas

Tip Load: 0.8

Trolley travel speed: 38/25m/min

Slewing speed: 0.6r/min

Jacking up: 0.4m/min

Powed: 380V/50HZ

Lifting character: 2/4 Fall

QTZ/TC    Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

9. Engineers available to service machinery overseas.   

QTZ/TC  Specification

 Tower Crane of Chang Li Model Number  QTZ/TC

QTZ/TC  Pictures

 

Tower Crane of Chang Li Model Number  QTZ/TC

Tower Crane of Chang Li Model Number  QTZ/TC

Tower Crane of Chang Li Model Number  QTZ/TC

QTZ/TC  FAQ

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.


Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client:  max lifting capacity, height (height under hook), tip load and jib length.


Q: What is main advantage for manufacturing construction machinery?

A: Our machinery main advantages mainly include: 1. National-level Research Academy for various building equipment for more than 30 years’ experience; 2. Complete quality control system; 3. Nearly 20 years experiences in manufacturing industries; 4. Over 50 engineers along with 6 local partner companies  providing worldwide after-sales service;

 

Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.



 

 


Q:I'm a little confused as to what the difference is between the crane and the flare boom-____- I'm thinking that the flare boom is what they use to burn off oil I there's a fire, but is that right? And what does the crane do?
The flare boom is just that, a stationary boom that supports the flare line. It is not a crane, those are completely separate and usually on the side of the platform away from the flare boom. The flare has to be set out from the platform so the radiant heat from the flame doesn't harm the people on board or the equipment. Yes there is normally a standing pilot and there will be a flame if there is a need to burn off the natural gas during an upset or emergency.
Q:Lifting mechanism in tower crane: M5. Luffing mechanism: what does "M4" mean? Seek expert answers
Lifting mechanism in tower crane: M5. Luffing mechanism: M4 is the working system
Q:A lot of condos and hotels are being build in hawaii, and each time i drive pass them i wonder how they are assembled.Since each individual piece looks heavy/sturdy and is 45 stories+ high, how do construction workers put them together. Do they assemble it by hand? Or are smaller cranes needed to do the job? Or possibly a different way i didn't mention?
u okorder
Q:I know it is the last thing in the movie but what chapter does Crane's death occur? THANK YOU
It doesn't. It's briefly mentioned in Catching Fire. That's just something the movie added in, a nice touch. Also in the book it is believed that Seneca Crane was hanged.
Q:Tower crane; command; gesture
8. the hook falls slightly: the arm extends to the side, front and bottom, with the angle of the body about 30 degrees, palm down, with the wrist as the axis, repeatedly swinging downward palm.9. hook horizontal move slightly: small arm toward the side of the natural extension, fingers together, palms outward, in the direction of the load should be running, repeat the slow horizontal movement.10., micro range: double arm bent, extended to one side, five fingers straight, palms relative, and the distance between the load and the distance to move.11. directions of landing: five fingers unbend, point out the position where the load should fall.12. stop: small arm horizontally placed in front of the chest, fingers outstretched, palms down, horizontal swing to the side.13. emergency stop: two small arm level placed in his fingers outstretched, palms downwards, while waving to the level of both sides.14. end of work: stretch your hands and fingers and cross over at the front of your forehead.
Q:How much should the verticality of a tower crane be controlled? Thank you
No, the wind speed is not more than 3m/s, the independent state tower (or attached state highest attachment point above the tower axis) lateral verticality tolerance is 4/1000, the highest tower axis perpendicularity allowed attachment line below the point of difference is 2/1000.
Q:crane operator?
Ya dude--truck driver---your turn
Q:Hey i need to know what icabod crane did in sleepy hollow the tim burton version with johnny depp.. so far all i have is In the movie he is a detective or a constable, someone who tries to solve crimes. He stands up for what he believes in even though no one might stand up with him. He used instruments of his own kind. Any information will help..Thank you very much Thx again
He was an Inspector from New York, I think, and he solved the crime in the nick of time. It was the wicked stepmother!
Q:Synopsis for the poem Lost Dances Of Cranes?
If this is the poem, you will find several comments at the link provided. Your fields are empty now. Only your ghosts dance while cranes of another kind dance cities into being. All that remain of you are a fading crackle of your energy and some grainy video footage that people in the new cities will watch to marvel at the wonders the world once held. craftygreenpoet.blogspot .uk/20...
Q:In the poem "The Wayfarer”, what is Crane's ironic comment on the pursuit of truth?
On a semi-close inspection, it would seem to me that Crane is saying that, ironically, the truth hurts. He's making a statement similar to Shakespeare in Hamlet. Hamlet is NOT muddled by indecision, as so many poor readers have often thought, but he sees much too much of the truth of the way of the world, and sees how futile and terrifying it is, and is embarrassed, or even humorously angered, that he should be asked to fix the world in the face of such impossible distress and futility. Similarly, the path to truth in Crane's The Wayfarer is overgrown with painful daggers which, if you step onto the path, will cut up your feet; if you take the path and find truth, you'll be hurt and dumbstruck and terrified by this path, so that the Truth (with a capital 'T') itself convinces the poem's 'hero' to turn to a different path, to choose something other than truth. And he doesn't even need to walk the path at all, only get a bit of a glimpse into truth, in order to be terrified by it.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords