QTZ63(5610) tower crane
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
QTZ63(5610) tower crane is novel hoisting and conveying machinery which is designed by Shandong Fuyou Co., Ltd. by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool.
The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the maximum working amplitude of 56m, the independent lifting height of 40m, the adhesion lifting height of 150m, the rated lifting moment of 710kN•m and the maximum lifting moment of 853.2kN•m. All the performance parameters and technical indexes of the crane meet or surpass national standards.
The crane features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many construction enterprises.
The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
Amplitude(m) | 3-13.6 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 |
Lifting capacity(kg) | 4000 | 3890 | 3618 | 3380 | 3170 | 2860 | 2810 | 2660 | 2530 | 2400 | 2290 |
Amplitude(m) | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 |
Lifting capacity(kg) | 2190 | 2090 | 2000 | 1920 | 1850 | 1770 | 1710 | 1650 | 1590 | 1540 | 1490 |
Amplitude(m) | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 |
Lifting capacity(kg) | 1440 | 1390 | 1350 | 1310 | 1270 | 1230 | 1200 | 1170 | 1130 | 1100 | 1070 |
Amplitude(m) | 46 | 47 | 48 | ||||||||
Lifting capacity(kg) | 1050 | 1020 | 1000 |
(2)2-magnification Lifting Performance Table
Amplitude(m) | 3-26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 |
Lifting capacity(kg) | 2000 | 1920 | 1850 | 1770 | 1710 | 1650 | 1590 | 1540 | 1490 | 1440 |
Amplitude(m) | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 |
Lifting capacity(kg) | 1390 | 1350 | 1310 | 1270 | 1230 | 1200 | 1170 | 1130 | 1100 | 1070 |
Amplitude(m) | 46 | 47 | 48 | |||||||
Lifting capacity(kg) | 1050 | 1020 | 1000 |
Technical Performance Parameter Table
Item | Unit | Magnification | ||
α=2 | α=4 | |||
Rated lifting moment | kN.m | 500 | ||
Maximum lifting capacity | t | 2 | 4 | |
Working amplitude | m | 3 ~48 | ||
Maximum amplitude lifting capacity | t | 1.0 | ||
Lifting height | Independent | m | 30 | |
Attached | m | 120 | ||
Time of moving outrigger end to rotation center | m | 48.74 | ||
Time of moving balance arm tail to rotation center | m | 12.816 | ||
Counter weight | t | 7 | ||
Total motor power | kW | 24.9 | ||
Allowable working temperature | 0C | -20~+40 |
- Q: Hi friendsI need some sketches of automotive crane?In which site or web log I can find it?
- I'm not sure what you mean by an automotive crane: a tow truck, a crane for lifting car engines, or a crane for lifting cars. Anyway, try google images. Search for automotive crane and see what it turns up.
- Q: why does the power company use helicopters to service the repair lines instead of trucks with tall cranes?
- High-tension lines operate at hundreds of thousands, or millions, of volts. At this potential, electricity can jump through several feet of air to reach a path to ground. This pretty much rules out using trucks, because it would be prohibitively expensive or impossible to build a crane out of entirely non-conductive materials. A helicopter is electrically isolated from the ground, so it's less difficult to drop a technician off and let him hang from the line itself while working. (It is still necessary for the technician to use a wand to bring the helicopter to the line's potential before starting work, because of the capacitance of the helicopter's body.) They could of course use a truck to service the lines if the power was disconnected, but the cost of shutting down service to an entire region of the country exceeds the operating cost of a helicopter.
- Q: Does anyone know of any companies that sell mobile cranes suited for extreme cold? I'm aware of Liebherr and Havator's harbor cranes, but I can't find much else.Thanks
- this is not my area of study but i will give you something to consider. if you are looking for a large capacity crane for use on permafrost, you wont find one. the pressure placed on the permafrost by large weights will cause it to melt. anything that is heavy, like a house, will sink in the tundra just like it will in a swamp. for houses they excavate the foundation a build a giant wooden raft that the hose floats on. in ST Petersburg, Russians preferred a mix of reeds and slave laborers corpses's to build the raft. as long as the ground is not frozen there is somebody how makes what you want. if the ground is frozen, you will only find small machinery. best of luck ps dont look to hard. lots of diesel engines work great at sub-subfreezing temps.
- Q: I have a few questions...do they have a shuttle and if so where does it go? What is near the resort? Such as stores etc.
- Yes i stayed at the Crane,you must have a car....I had my black escalade at the time...so am not sure about shuttle service.
- Q: quick answer or i'll delete it!
- I think I've seeing Pizza Delivery more times, since it's season 1. It's a classic episode, I mean: The krusty krab pizza, is the pizza, for you and me! who doesn't love that?! I love Skill Crane. And The Splinter wasn't that bad, it would have being better if it weren't for the gross parts, but it haven't air that much since it premiered just a couple weeks ago.
- Q: anyone can tell me the common steel tube material using for crane boom, both main chord and lattice boom. thanks !
- Steel, like you said, do you want an exact specification? That will vary by whether it is a very long and slender tall crane or a shorter heavy duty for considerable loads. It may even vary depending on whether the manufacturer has as a goal an extra light weight unit using more expensive stronger steel or is willing to use thicker walls to use more ordinary steel. That is what engineers are for.
- Q: Hi,I am looking for study for Design, Calculation and selection of Overhead Crane supporting Columns. (Not the Crane runner way beams ) Could you please suggest me the suitable references on internet?Thank You !
- See okorder /
- Q: Construction tower crane operator certificate expires, how to verify?
- Chongqing "construction crane operator qualification certificate", the need for training after the exam this year, Yubei District has organized a meeting, other areas will organize can ask the competent department, the Department in charge of the Certification Committee is.The following is a notice of the Yubei District organizing examination for your reference:Notice of Chongqing Yubei District construction post training center on training courses for construction lifting machinery operatorsAll construction enterprises, mechanized companies, tower crane leasing companies:In order to strengthen our district housing construction sites and municipal engineering site crane operations personnel management, improve personnel quality, prevent and reduce accidents, according to the State Quality Inspection Administration, the Ministry of construction and the Municipal Construction Committee of the spirit of the relevant documents and regulations. After the study, we decided to hold a training course for construction machinery operators, and hereby notify the relevant matters as follows:I. training objects and registration requirementsWhere the construction enterprises in our district and the relevant units engaged in or engaged in the work, at least 18 years of age, women are not more than 55 years of age, male, no more than 60 years of age, junior high school education, good health.
- Q: Can paper crane symbolise your love for a girl?
- I dont understand yr question
- Q: What does the crane mean to the Korean people?
- Long Life
Send your message to us
QTZ63(5610) tower crane
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords