Tower Crane TC7050
- Loading Port:
- China Main Port
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 1 Unit unit
- Supply Capability:
- 50 Units Per Month unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Description of TC7050
1) CMAX TC7050 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;
3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator
Specifications:
Main Parameter
Model: TC7050
Jib Length: 70m
Tip load: 5.0T
Max load: 20 ton
Free type height: 50m
Mast Section: 2.0x2.0x3.0m
Packaging & Delivery
40HQ container
40~50 days after deposit
- Q: how does a crane operator's knowledge of where the centroid is generally located for most uniform objects help them perform their job more safely?
- If an object is uniform, it's a fair bet the centre of mass will be at the centre of the shape. If lifting with slings, he will have them placed equidistant from centre, at an angle to each other not exceeding 60 degrees. He will then lift a little, and can tell by the angles from vertical of each sling whether or not the CM is under the centre of the crane cable. If not, he will lower the load, and have someone adjust the sling positions. Having slings equally loaded ensures a level load when lifting, and when a load is level it is a much safer lift than when it tilts one way or the other. A tilt would mean greater force in the sling on the low end. The load could slip out, or the excess force could break the sling.
- Q: It seems like every time I turn on the news there is another crane collapse. I don't know if it is the same problem every time, but it seems awfully suspicious. Does anyone know why crane collapses seem so common lately? Has it always been this way?
- You okorder .. This chart is not definitive, it leaves out many occupations (such as mining), it only considers fatalities (not loss of limbs, etc.) but it conveys the general picture. For hard data look at: www.bls /iif/
- Q: Denny Crane (played by William Shattner), and Alan Shore (played by James Spader) are partners in a Boston law firm. I would like to know if those those two are father and son in the series,
- NO. They are good friends.
- Q: I need to make a crane in my mechanical class. I can use anything pretty much (pulleys, levers, etc.) The goal is to make a crane with a claw that can pick up a weighted container in a tub of water. It needs to be operated by handle or something, and the base of machine must be on the table top. Any help will be appreciated.
- Take okorder /
- Q: im so frustrated because ive tryed everything and im obsessed with this book it would really help if someone could find a way for me to read it for free online. i cant find it at my library.please and thank you:)?
- did you ever get to read this book
- Q: What is the easiest way to transport vertically? What is applicable?What is the difference between tower crane and tower crane?
- Vertical transportation can be done with elevators, construction lifts, and Longmen racksTower cranes and tower cranes are one thing
- Q: If the crane Dawkings refers to about natural selection is not operating or existing by chance, then some questions arise:1) who or what is operating the crane?2) if its self operating, how is it programmed to do so?3) who made the crane?And about designing the designer, No one did. Otherwise the crane would be lifting the operator of the crane into the crane. I guess the crane can operate by itself, but then stopped doing so when something designed the designer. Too many philosophical conundrums for me. The belief in an unified, and self-complete, creator is far less of a complex explanation than the 'crane' concept with all its requisite philosophical flamings hog's heads.
- There are cranes, anchored to the ground which can build concepts up. However, the idea of a sky crane is how someone builds a concept from thin air. The ultra cosmic sky crane built it. That way you don't have to figure out a realistic way of building a theory.
- Q: In order to ensure the stability of tower cranes, generally along the height of the tower and building a number of meters attached
- Self lifting tower crane tower 45 meters high to prevail, such as height of over 45 meters, each increased to 10 meters (less than 5 meters, excluding) demolition costs increase 20%, off-site transportation costs increased by 10%.
- Q: My dad has some old tools and he is wondering if the company is still around, or what happened to it. A yahoo search revealed little.
- Hot jobs- fashion Champions- A Extraordinary- B Hot Music- 1995 Villian-A Famous First- A Spiral Frog- e
- Q: Lifting mechanism in tower crane: M5. Luffing mechanism: what does "M4" mean? Seek expert answers
- Agency level lifting mechanism: M5 luffing mechanism: the maximum working range of M4 working range: 56m minimum generation writers instead of me...... Thanks...... 6T tower crane CAD diagram
1. Manufacturer Overview
Location | SHANGHAI,CHINA |
Year Established | 2000 |
Annual Output Value | Above US$100 Million |
Main Markets | CHINA |
Company Certifications | ISO 9001:2008; |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Shanghai |
Export Percentage | 0.8 |
No.of Employees in Trade Department | 600 People |
Language Spoken: | English;Chinese; |
b) Factory Information | |
Factory Size: | Above138,000square meters |
No. of Production Lines | Above 2 |
Contract Manufacturing | OEM Service Offered;Design Service Offered |
Product Price Range | Average |
Send your message to us
Tower Crane TC7050
- Loading Port:
- China Main Port
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 1 Unit unit
- Supply Capability:
- 50 Units Per Month unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords