• Tower Crane of Chang Li Model Number QTZ125A (5518) System 1
  • Tower Crane of Chang Li Model Number QTZ125A (5518) System 2
  • Tower Crane of Chang Li Model Number QTZ125A (5518) System 3
Tower Crane of Chang Li Model Number QTZ125A (5518)

Tower Crane of Chang Li Model Number QTZ125A (5518)

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
888 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ125A(5518)  Description

Feature: Tower Crane

Condition: New

Application: all kinds of construction

Rated Loading Capacity: 5T,6T,8T,10T,12T

Rated Lifting Moment:500KN.m/630KN.m/800KN.m/1000KN.m/1200KN.m

Max. Lifting Load: 5T,6T,8T,10T,12T

Max. Lifting Height:120m/120m/150m/150m/150m

Span: 120m/120m/150m/150m/150m

Place of Origin: Henan, China (Mainland)

Brand Name: YUJIE

Model Number: QTZ125A(5518)

Certification: CE,ISO,BV,SGS

Warranty: ONE YEAR

After-sales Service Provided: Engineers available to service machinery overseas

color: according to the customer's requements

QTZ125A(5518)  Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Stationary/Travelling, external/ internal climbing tower crane 

3. Impeller blasting/rust protection paint

4. Advanced painting process

5. New designed mast, can be used to Internal and external climbing tower crane

6. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

7. Engineers available to service machinery overseas.   

QTZ125A(5518)  Specification

 Tower Crane of Chang Li Model Number QTZ125A (5518)

QTZ125A(5518)  Pictures

 

Tower Crane of Chang Li Model Number QTZ125A (5518)

Tower Crane of Chang Li Model Number QTZ125A (5518)

Tower Crane of Chang Li Model Number QTZ125A (5518)

QTZ125A(5518)  FAQ

Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.


Q: What is main advantage for manufacturing construction machinery?

A: Our machinery main advantages mainly include: 1. National-level Research Academy for various building equipment for more than 30 years’ experience; 2. Complete quality control system; 3. Nearly 20 years experiences in manufacturing industries; 4. Over 50 engineers along with 6 local partner companies  providing worldwide after-sales service;

 


 

 

 


Q: what is the common cause of crane accidents
Although mechanical failure does occur, most crane accidents are caused due to human error. Here are some examples: 1) Operating a crane during adverse weather conditions, such as wind conditions 2) Overloading a crane/ improper load calculations 3) Inexperienced or untrained personnel 4) Improper rigging of the load 5) Bypassing safety devises 6) Improper selection of the crane for the environment (ground conditions, power lines etc.) based on the type of load 7) Shock-loading a crane 8) Failure to perform maintenance and inspections in accordance to manufacture specifications I hoped this helped Cheers
Q: A crane operator must ensure that the load is within load chart ratings for _________ and the __________ of the crane.A. Boom length; CenterpointB. Boom length; Load RadiusC. Center Point, Load RadiusD. Center of Gravity; Load Radius
B. The load radius is the horizontal distance from the center of rotation of the crane to the center of gravity of the load being lifted. The load radius is a critical consideration when determining what size crane is required for most lifts. There is generally a chart that tells what that machine will lift at any boom length,
Q: i am a student of class 12 can anyoone tell me how do i make a project on an electromagnetic crane?
hi okorder
Q: What is the calibration value of a tower crane?
Tower crane calibration value is to benchmark material to be calibrated by standard liquid titration value, calibration to parallel mark three times, take the average value, if the requirement is not strict, error within 3 per thousand, strictly within 1 per thousand.Main performance parameters of tower crane:1. Lifting weight G1. weight G - was the quality of the heavy lift. The unit is t.2. rated lifting weight Gn allows crane lift weights together with the quality of the sum of the spreader.3. maximum weight Gmax - normal work conditions under the crane, the maximum permissible rated lifting weight lifting.Two, range LL - 1. range of level ground when the crane is positioned between the spreader, no-load vertical center line to the center line of the rotary horizontal distance. The unit is m.2. biggest Lmax - crane, jib angle or the minimum car in arm the limit position of the amplitude.3. Lmin minimum amplitude - jib angle or trolley jib in maximum limit position within the range.
Q: What symbols are there in the story? What might be the symbolic meaning of the sea? the boat? the seabirds? the shark? the unmanned life-saving station? the lighthouse? the tourists on the beach?What is the theme of the story? What does the story as a whole say about human beings and nature? about male bonding? about survival? how are these three topics related in the story as a whole?
This Site Might Help You. RE: The Open Boat by Stephen Crane? What symbols are there in the story? What might be the symbolic meaning of the sea? the boat? the seabirds? the shark? the unmanned life-saving station? the lighthouse? the tourists on the beach? What is the theme of the story? What does the story as a whole say about human beings and nature?...
Q: When the tower crane top height is more than meters
Circular of the Ministry of housing, urban and rural construction on Issuing the measures for the safety administration of sub hazardous and sub divisional projectsAnnex No. [2009]87 [Annex two]"More than a certain size of the risk of larger sub sub project scope."
Q: Our company is responsible for the general contracting construction project foundation pile by Party A but other subcontractor for the construction of pile foundation of a pile foundation the company has quickly completed the construction scheme of the party and the supervision of tower crane foundation now has been reported by the audit Party B must contact us pile pile. We believe that Party A shall bear it at one time. Ask the net friend is this so?
According to the present list of quotations, the winning project, the tower crane cost has been included in the total price, and has nothing to do with the construction side, that is, the cost of tower crane foundation should be borne by the construction side.
Q: i need six colors mentioned in the story and wat each one means thanks :)
From: The Open Boat By Stephan Crane. These waves were of the hue of slate... ...save for the tops, which were of foaming white... In the wan light, the faces of the men must have been grey. ...the color of the sea changed from slate to emerald-green... ...wild with lights of emerald and white and amber. ...near patches of brown seaweed... ... at the men with black bead-like eyes. ... marked by dingy clouds, and clouds brick-red, ... Ain't they peaches? A faint yellow tone came into the sky over the low land. ... a small bluish gleam on the edge of the waters. ... with a sky of pure blue...
Q: I know it is the last thing in the movie but what chapter does Crane's death occur? THANK YOU
It's not metion in the hunger games, but in Catching Fire President Snows metions it to katniss. Then katniss does her presentation to the gamemakers, where she takes a dummy hangs hims and writes seneca crane in it.
Q: What do lattice boom and hydraulic boom in cranes mean?
LATTICE BOOM: See first link. This is where the boom (the portion used to support the load) is made like a lattice ... i.e. interconnected trusses and girders. The cables for lifting the load are run from the base of the boom to the load over pulleys/gears located at the boom's tip. The boom itself is NOT adjustable in length or in angle. HYDRAULIC BOOM: See second link. This crane uses hydraulics to adjust either the length of the boom, or the angle at which the boom joints intersect. It looks more like a single beam construction, although its probably closer to a tube type design (hydraulics may be inside or outside the arm). The load is raised/lowered by cables operating at the end of the boom ... not necessarily tied back to the bottom of the boom.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords