Steel Frame Formwork SF-140
- Loading Port:
- XINGANG
- Payment Terms:
- TT or LC
- Min Order Qty:
- 55 Cubic Meter/Cubic Meters m.t.
- Supply Capability:
- 5000 Cubic Meter/Cubic Meters per Month m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Steel-frame Formwork SF-140
Type: Plywoods
Place of Origin: China (Mainland)
Brand Name: CMAX
Usage: Outdoor
Grade: First-Class
Main Material: Poplar
Formaldehyde Emission Standards: E1
Plywood Type: 13-Ply Boards
Film: black,brown,red,anti-slip
Core: poplar,hardwood,eucalyptus,combi,birch
Glue: melamine WBP,phenolic
WBP Size: 1220*2440mm,1250*2500mm
Thickness: 9mm,12mm,15mm,18mm,21mm
Pressing: 1 time,2 times
Packaging & Delivery Steel-frame Formwork SF-140
Packaging Detail: inner with plastic bag,outer with carton board or thin plywood then fastened by steel belts with pallet
Delivery Detail: Within 15 days after receiving deposit or original L/C at sight
Specifications Steel-frame Formwork SF-140
1)Film:brown,black,red,anti-slip
2)Core:poplar,hardwood,combi,birch
3)Glue:melamine WBP,phenolic WBP
4)Useage:construction
Item | Film faced plywood/Marine plywood/Construction plywood | |
Face/Back | Brown film,Black Film,Red film,Anti-slip film | |
Core | Poplar,hardwood,Eucalyptus, Poplar, Birch | |
Glue | Melamine WBP glue,Phenolic WBP glue | |
Size(mm) | 1220×2440mm,1250×2500mm or as request | |
Thickness(mm) | 9mm,12mm,15mm,18mm,21mm | |
Moisture | 6-12% | |
Thickness tolerance | +/-0.5mm
| |
Packing | inner with plastic bag,outer with carton board or thin plywood then fastened by 4×6 lines steel belts with pallet | |
Quantity | 20’GP | 8 plts/22M3 |
40’GP | 16 plts/48M3 | |
40’HQ | 18 plts/55M3 | |
Useage | Using for making construction, industry | |
MOQ | 1×40'HQ | |
Payment Terms | TT:30% deposit, the balance agaist B/L copy L/C: irrevocable L/C at sight | |
Delievery Time | Within 15 days after receiving 30% deposit or original L/C at sight |
- Q:What is an integrated climbing frame? What are the works? What are the advantages
- And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings. Rental fees do not want the same
- Q:The difference between the scaffold and the scaffold
- The climbing frame is the kind of iron that is assembled by a large construction site
- Q:The whole concrete wall climbing frame or good use of steel scaffolding
- Floor scaffold:Advantage:1) large bearing capacity. When the scaffolding geometry and structure comply with the relevant requirements, under normal circumstances, the bearing capacity of 15kN ~ 35kN of the single column scaffold (1.5tf ~ 3.5tf, design value).Clamp and Tube Scaffold2) easy to install and disassemble, set up flexible. Because the length of the steel tube is easy to adjust and the fastener is convenient to connect, the utility model can be used for various buildings and structures with various planes and elevations.3, compared with the economy, the processing is simple, and the investment cost is low; if the geometric dimensions of the scaffold are carefully designed, and the utilization rate of the steel tube is improved, the material consumption can also obtain better economic effect. Fastener steel pipe frame equivalent to 15 square meters per square meter of construction steel.
- Q:Advantages and disadvantages of climbing frame and floor type scaffold
- Advantages and disadvantages of climbing frame and floor type scaffoldPjal | browse 5789Recommended 2016-09-21 09:11:21 best answerClimbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings. But it also has the disadvantage of fixed structure.
- Q:What are the maintenance and maintenance of hydraulic climbing formwork
- Regular inspection of the climbing device should check the connections. In particular, the following parts of the site to focus on inspection and reinforcement: according to the design requirements of the bolt with spring washers
- Q:Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
- Install the lifting seat and a guide seat is connected with the high wall, main frame vertical rod, the frame set up to the designed height, laying the top scaffold, block feet - laying bottom safety nets and scaffolding, making turning plate - the upper part of the frame body structure and effective tie (tie spacing is not greater than 6m) - display efflux dense mesh safety net to the top of the shelf, the anti dropping boom is inserted into the base anti dropping device, the installation of steel rope - placed distribution cables, installation control cabinet, electric hoist, electric wiring and debugging system, pre inspection, electric hoist, demolition of frame body and the upper structure of pulling and synchronization a layer - installation completed, enter the upgrade cycle
1. Manufacturer Overview |
|
---|---|
Location | Shanghai,China |
Year Established | 1949 |
Annual Output Value | Below US$1 Million |
Main Markets | North America South America Eastern Europe Southeast Asia Africa Oceania Mid East Eastern Asia Western Europe Central America Northern Europe Southern Europe South Asia Domestic Market |
Company Certifications | ISO 9001:2008 |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | SHANGHAI |
Export Percentage | 91% - 100% |
No.of Employees in Trade Department | 200 |
Language Spoken: | English,Chinese |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Steel Frame Formwork SF-140
- Loading Port:
- XINGANG
- Payment Terms:
- TT or LC
- Min Order Qty:
- 55 Cubic Meter/Cubic Meters m.t.
- Supply Capability:
- 5000 Cubic Meter/Cubic Meters per Month m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords