• Pull-Push Prop System 1
  • Pull-Push Prop System 2
  • Pull-Push Prop System 3
Pull-Push Prop

Pull-Push Prop

Ref Price:
$15.00 - 30.00 / pc get latest price
Loading Port:
XINGANG
Payment Terms:
TT or LC
Min Order Qty:
1 pieces pc
Supply Capability:
5000 pieces per Day pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specifications of Pull-Push Prop

 

  1. OEM service is availalbe

  2. High Strength

  3. Material: Steel

  4. Surface: Galvanized or HDG or Painted or Powder Coated


Details of Pull-Push Prop:

 

OEM Service is offered

Stable and Durable

High Strength

Material: Steel

Type: Heavy Duty and Light Duty

Surface : Galvanized or HDG or Painted or Powder Coated

Package : Pallets or As Customer's Requirements

Delivery Time: 25days

Custom Made: Available

 

Packaging & Delivery of Pull-Push Prop

 

Packaging Detail: Pallets or As Customer's Requirements
Delivery Detail: 25 Days

 

Pull-push prop is used for supporting the wall and column formwork

 Pull-Push Prop

 

CHARACTERISTICS OF Pull-Push Prop

 

1 For Timber Beam Formwork

High degree of standardization

Simple site operations

Quick adjustment

Pull-Push Prop

 

 

2 For Steel Frame Formwork

Pull-Push Prop

 

 

There are three kinds of pull-push props,A,B,C.The A and B is suitable for the formwork not higher than 3000MM,C is suitable for the formwork higher than 3000MM as a reinforcer

Pull-Push Prop

 

3.PROJECT APPLICATION

 

 

 

Q: What are the maintenance and maintenance of hydraulic climbing formwork
After the shift between the device and the main girder is inserted on the pin and the pin card, after the shift is already used for rear jacking jacking, wind cable is tightened, the adjacent frame between the climbing frame is firmly rachel.
Q: Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
Install the lifting seat and a guide seat is connected with the high wall, main frame vertical rod, the frame set up to the designed height, laying the top scaffold, block feet - laying bottom safety nets and scaffolding, making turning plate - the upper part of the frame body structure and effective tie (tie spacing is not greater than 6m) - display efflux dense mesh safety net to the top of the shelf, the anti dropping boom is inserted into the base anti dropping device, the installation of steel rope - placed distribution cables, installation control cabinet, electric hoist, electric wiring and debugging system, pre inspection, electric hoist, demolition of frame body and the upper structure of pulling and synchronization a layer - installation completed, enter the upgrade cycle
Q: The difference between the scaffold and the scaffold
The difference between climbing frame and scaffolding is commonly used scaffolding from below has been set up, which is followed by building up climbing frame, the figure is upstairs, they have in common is that we are like scaffolding
Q: Advantages and disadvantages of climbing frame and floor type scaffold
2) easy to install and disassemble, set up flexible. Because the length of the steel tube is easy to adjust and the fastener is convenient to connect, the utility model can be used for various buildings and structures with various planes and elevations.
Q: The whole concrete wall climbing frame or good use of steel scaffolding
It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
Q: What is an integrated climbing frame? What are the works? What are the advantages
. It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
We are a national comprehensive Class-A scientific research and design unit, an internationalized engineering group company and a key national-level hi-tech enterprise, and is the engineering technical platform of China National Building Material Co., Ltd.

1. Manufacturer Overview

Location Shanghai,China
Year Established 1949
Annual Output Value Below US$1 Million
Main Markets North America
South America
Eastern Europe
Southeast Asia
Africa
Oceania
Mid East
Eastern Asia
Western Europe
Central America
Northern Europe
Southern Europe
South Asia
Domestic Market
Company Certifications ISO 9001:2008

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a) Trade Capacity
Nearest Port SHANGHAI
Export Percentage 91% - 100%
No.of Employees in Trade Department 200
Language Spoken: English,Chinese
b) Factory Information
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords