Scaffolding Parts-Cold Galvanized Coupler
- Loading Port:
- XINGANG
- Payment Terms:
- TT
- Min Order Qty:
- 2000 Unit/Units pc
- Supply Capability:
- 5000 Unit/Units Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Scaffolding Parts-Cold Galvanized Coupler
Place of Origin: China (Mainland)
Brand Name: CMAX
Type: Scaffolding Parts
Scaffolding Part Type: Scaffolding Couplers
Material: Carbon Steel Q235/1008/1010
Finishing: Color Zinc Plated
Thickness: 3mm
Diameter: 48.6mm
Weight: 650g
Min. Slip Load: 12.5 KN
Min. Distortion Load: 17 KN
Standard: EN74 / BS1139
Packaging & Delivery of Scaffolding Parts-Cold Galvanized Coupler
Packaging Detail: Carton or PP Bag or as per buyer's specifications
Delivery Detail: 30days or Customer needs
Specifications of Scaffolding Parts-Cold Galvanized Coupler
scaffolding coupler
1) Material:Q235
2) Size:0.84kg/48.3mm
3) Surface:Galvanized,Electroplated
4) OEM Served
right angle coupler scaffolding manufacturer in india
Name |
Scaffolding Couplers |
Surface Treatment |
Galvanized,Electroplated |
Type |
Scaffolding Parts |
Brand Name |
CMAX |
Diameter |
48.6mm |
Thickness |
3mm |
Weight |
650g/pc |
Material |
Carbon Steel Q235 1008 1010 |
Finishing |
Color Zinc Plated |
Payment & Shipping Terms | |
MOQ |
1000 Piece/Pieces or Negotiable Trial Order |
Port |
Nantong or Shanghai |
Packaging Details |
Carton or PP Bag |
Delivery Time |
30days |
Payment Terms |
L/C,T/T |
Supply Ability |
20000 Piece/Pieces per Month |
1. We are manufacturer of all type of Scaffolding fittings and Couplers.
2. Our products reach the international quality standard, such as, ISO, DIN, BS, ANSI, JIS.
3. We can support RoHS products.
4. Color zinc plated to prevent rustiness and corrosion,and get longer working life.
5. We have the ability to manufacture kinds of scaffolding couplers, such as: type/Japanese type/British type/American type/Italian type/German type/Putlog coupler/Girder coupler/Fence coupler and so on.
"Excellent Quality, Perfect Services and Competitive Prices" is our eternal faith. We always do our utmost to create value for our customers.
- Q:What is an integrated climbing frame? What are the works? What are the advantages
- And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings. Rental fees do not want the same
- Q:The difference between the scaffold and the scaffold
- The climbing frame is the kind of iron that is assembled by a large construction site
- Q:The whole concrete wall climbing frame or good use of steel scaffolding
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction
- Q:Advantages and disadvantages of climbing frame and floor type scaffold
- 2) easy to install and disassemble, set up flexible. Because the length of the steel tube is easy to adjust and the fastener is convenient to connect, the utility model can be used for various buildings and structures with various planes and elevations.
- Q:What are the maintenance and maintenance of hydraulic climbing formwork
- Whether or not the double screw nut is used on the important bolt connection, the degree of the fastening, whether the steel bar is pressed according to the rules, and the steel wires are bundled together
- Q:Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
- Install the lifting seat and a guide seat is connected with the high wall, main frame vertical rod, the frame set up to the designed height, laying the top scaffold, block feet - laying bottom safety nets and scaffolding, making turning plate - the upper part of the frame body structure and effective tie (tie spacing is not greater than 6m) - display efflux dense mesh safety net to the top of the shelf, the anti dropping boom is inserted into the base anti dropping device, the installation of steel rope - placed distribution cables, installation control cabinet, electric hoist, electric wiring and debugging system, pre inspection, electric hoist, demolition of frame body and the upper structure of pulling and synchronization a layer - installation completed, enter the upgrade cycle
1. Manufacturer Overview |
|
---|---|
Location | Hebei, China |
Year Established | 1987 |
Annual Output Value | Below US$1 Million |
Main Markets | China; United States; Britain; Japan; Germany; Israel |
Company Certifications | GB/T19001-2008/ISO9001:2008 Quality Certification |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Xingang |
Export Percentage | 1% - 10% |
No.of Employees in Trade Department | 10-20 people |
Language Spoken: | Chinese; English |
b)Factory Information | |
Factory Size: | Above 3,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | Design Service Offered |
Product Price Range | Average |
Send your message to us
Scaffolding Parts-Cold Galvanized Coupler
- Loading Port:
- XINGANG
- Payment Terms:
- TT
- Min Order Qty:
- 2000 Unit/Units pc
- Supply Capability:
- 5000 Unit/Units Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords