Scaffolding Parts-Cold Galvanized Beam Clump
- Loading Port:
- XINGANG
- Payment Terms:
- TT
- Min Order Qty:
- 2000 Unit/Units set
- Supply Capability:
- 5000 Unit/Units Per Month set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Scaffolding Parts-cold galvanized beam clump
Place of Origin: China (Mainland)
Brand Name: CMAX
Type: Scaffolding Parts
Scaffolding Part Type: Scaffolding Couplers
Materail: Q235
Surface treatment: zink
plate Size: 48.3mm
Weight: 1.50kg
Packaging & Delivery of Scaffolding Parts-cold galvanized beam clump
Packaging Detail: steel pallet or as your requests
Delivery Detail: 20-45days or as your quantity
The Details of Drop Forged Scaffold Beam Clamp/Girder Coupler
Item |
Scaffolding Couplers |
Material |
Q235/Q345/etc |
Dimensions |
48.3*48.3/48.3*60/48.3*76, or as your demands |
Surface |
Hot-dip galvanization/ electro galvanization /painted /or as your request |
Standard |
EN74,BS1139,JIS,AS1576,ISO9001:2008 |
Strength of T bolts |
class 4.8/ class6.8/ class8.8 |
Nut sizes |
17/19/21/22/23mm |
Weight |
0.8-1.45kg/ as your requirement |
Feature |
Skidprood, Autirust, High Breaking Strength,Durable, easy to assemble & dismantle |
Note |
OEM service is available |
MOQ |
1000pieces |
Package |
woven bags with pallets or plywood box, or as your request |
Payment Terms |
TT,L/C, we can contact in detail |
Delivery Time |
20-30days |
Specifications of Scaffolding Parts-cold galvanized beam clump
1.Materail:Q235
2.Surface:zink plate
3.Size:48.3mm
4.Weight:1.50kg
5.high quality and competitive price
Scaffold Fixed Girder Coupler /Beam Clamp
Product description of Scaffolding Parts-cold galvanized beam clump
(1)raw materail:Q235
(2)surface treatment:zink plate
(3)size:48.3mm
(4)weight:1.50kg
(5)OEM service is available
(6)high quality and competitive price
Our main manufacturing
(1) Scaffolding System:
Including Ringlock Scaffolding System and accessories; Cuplock Scaffolding System and accessories; Kwikstage Scaffolding System and accessories; Haki Scaffolding System and accessories;
(2) Scaffolding Frame & Accessories:
Including Walk Through Frame Scaffolding; Ladder Frame Scaffolding; Accessories; we also can make scaffolding according to your samples or drawings.
(3) Scaffolding Couplers/Clamps:
We can produce all kinds of forged and pressed couplers, including British type couplers, American type couplers, German type couplers, Italian type couplers ,fence couplers, BRC coplers and so on. We also can produce according to your drawings or samples.
(4) Formwork System Scaffolding & Accessories:
Light Duty Shoring prop and Heavy Duty Shoring Prop; Wing nuts and Tie rods; RASTO clamp and so on.
- Q: What are the maintenance and maintenance of hydraulic climbing formwork
- Regular inspection of the climbing device should check the connections. In particular, the following parts of the site to focus on inspection and reinforcement: according to the design requirements of the bolt with spring washers
- Q: Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings.
- Q: The difference between the scaffold and the scaffold
- The difference between climbing frame and scaffolding is commonly used scaffolding from below has been set up, which is followed by building up climbing frame, the figure is upstairs, they have in common is that we are like scaffolding
- Q: Advantages and disadvantages of climbing frame and floor type scaffold
- 3, compared with the economy, the processing is simple, and the investment cost is low; if the geometric dimensions of the scaffold are carefully designed, and the utilization rate of the steel tube is improved, the material consumption can also obtain better economic effect. Fastener steel pipe frame equivalent to 15 square meters per square meter of construction steel.
- Q: The whole concrete wall climbing frame or good use of steel scaffolding
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction
- Q: What is an integrated climbing frame? What are the works? What are the advantages
- And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings. Rental fees do not want the same
1. Manufacturer Overview
Location | Hebei, China |
Year Established | 1987 |
Annual Output Value | Below US$1 Million |
Main Markets | China; United States; Britain; Japan; Germany; Israel |
Company Certifications | GB/T19001-2008/ISO9001:2008 Quality Certification |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Xingang |
Export Percentage | 1% - 10% |
No.of Employees in Trade Department | 10-20 people |
Language Spoken: | Chinese; English |
b) Factory Information | |
Factory Size: | Above 3,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | Design Service Offered |
Product Price Range | Average |
Send your message to us
Scaffolding Parts-Cold Galvanized Beam Clump
- Loading Port:
- XINGANG
- Payment Terms:
- TT
- Min Order Qty:
- 2000 Unit/Units set
- Supply Capability:
- 5000 Unit/Units Per Month set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords