Simple Single-Side Bracket
- Loading Port:
- XINGANG
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Set/Sets set
- Supply Capability:
- 10000 Set/Sets per Month set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.INTRODUCTION OF Simple Single-Side Bracket
During single-sided concreting,the concrete pressure is transferred into the sub-structure by means of the single-side bracket.
2.CHARACTERISTICS OF Simple Single-Side Bracket
1.For concrete heights up to 8.0M and fresh concrete pressure up to a maximum of 60KN/M2
2.Good standard performance and versatility
3.Fast element coupling,all units can be quickly connected.
4.The finished wall is excellent and absolutely waterproof
5.There is no wall-through tie-rod in the single-side bracket system.The whole system is adjusted by the anchor system and the regulator system.
6.The stress situation from the sketch above.F1 can resist the side pressure of the concrete and F2 can resist the rising force.R can not only bear the gravity force of the brackt,but also the side pressure of the concrete.
7.This stress system is simple,reaonable and also with convenience and high safey.
3.ADVANTAGES OF Simple Single-Side Bracket
1.Easy Application: Design and form planning ensuring easy application.
2.Flexibility: Easy adaptation to different projects and sizes thanks to its size variety. The single-side braket can be used with other form systems.
3.Light Weight: It is lighter than all form systems in class. Thanks to this, it allows working with low crane capacities.
4.Easy Assembly: It provides easy on-site assembly thanks to connection details.
5.Economy: It is an economic system with its easy assembly, light structure and flexible and fast application.
4.PROJECT APPLICATION OF Simple Single-Side Bracket
- Q: What are the maintenance and maintenance of hydraulic climbing formwork
- Whether or not the double screw nut is used on the important bolt connection, the degree of the fastening, whether the steel bar is pressed according to the rules, and the steel wires are bundled together
- Q: Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
- Climbing frame installation processInstallation of platform --- display base, installation guide, assembling components - horizontal truss beam with the bolt on the guide rail, the main frame vertical rod buckle on the beam - diagonal rod buckle on the vertical rod and beam - wall installation guide device, the frame structure of unloading with elevated body, the erection of scaffolding, the laying of the intermediate layer or temporary scaffolding and temporary building structure frame of pulling and hanging outside the dense mesh safety net - loaded third beams to guide seat -
- Q: The difference between the scaffold and the scaffold
- The climbing frame is the kind of iron that is assembled by a large construction site
- Q: Advantages and disadvantages of climbing frame and floor type scaffold
- Floor scaffold:Advantage:1) large bearing capacity. When the scaffolding geometry and structure comply with the relevant requirements, under normal circumstances, the bearing capacity of 15kN ~ 35kN of the single column scaffold (1.5tf ~ 3.5tf, design value).
- Q: The whole concrete wall climbing frame or good use of steel scaffolding
- It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
- Q: What is an integrated climbing frame? What are the works? What are the advantages
- . It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
1. Manufacturer Overview
Location | Shanghai,China |
Year Established | 1949 |
Annual Output Value | Below US$1 Million |
Main Markets | North America South America Eastern Europe Southeast Asia Africa Oceania Mid East Eastern Asia Western Europe Central America Northern Europe Southern Europe South Asia Domestic Market |
Company Certifications | ISO 9001:2008 |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | SHANGHAI |
Export Percentage | 91% - 100% |
No.of Employees in Trade Department | 200 |
Language Spoken: | English,Chinese |
b) Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Simple Single-Side Bracket
- Loading Port:
- XINGANG
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Set/Sets set
- Supply Capability:
- 10000 Set/Sets per Month set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords