• Stainless Steel Glass Clamp Holder 304/316 System 1
Stainless Steel Glass Clamp Holder 304/316

Stainless Steel Glass Clamp Holder 304/316

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
100 Pieces pc
Supply Capability:
100000 Pieces per Month pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Material:Stainless steel 304 or 316

 

2.Surface: Satin or mirror surface treatment

 

3.Type:Stainless steel two way arm spider

 

4.Application:Used on handrail or balustrade

 

5.Certificates:International testimonials of ISO9001:2008,CE&PED of TUV

 

6.Delivery:By ship,by plane or by express

 

7.We can also accept ODM or OEM service

 

8.We have our own lost-wax casting and machining factories,we can make sure that the material component and quality are totally up to your requirements

Q:How many calculations for a square meter of material?
Curtain wall material calculation points: 1. Panel: panel ratio of expansion area * utilization (general 1.03) 2. keel: linear density * per square meter length * utilization (generally 1.05 ~ 1.15, according to material specifications) 3. Attachment: use per square meter (weight or volume number) * Utilization rate (general 1.03) 4. Low-value consumables: 15 ~ 25 (yuan / m2, according to the type of curtain wall to consider) 5. Labor costs: market decisions
Q:Fire aluminum glass is what glass where to sell
This involves more, you can special check, of course, you need to be specific communication
Q:Whether the civil tender contains the curtain wall and does not contain the curtain wall, behind the owner and the general contract of the contract agreement What is the difference
If the total tender documents contain curtain wall, indicating that the total subcontract management, behind the curtain wall unit calibration, signed the total package, the owner and the curtain wall units of the tripartite agreement, take the total package of the notice and the three parties can be directly filed for the record.
Q:Curtain wall design documents review how qualified newspaper supervision
You should say is the curtain wall of the drawings review certificate. Do not need any format, do not have a separate inspection, copy a copy of the supervision to the OK. The The And the original should be given to the Party
Q:Building energy efficiency acceptance of what documents
Building energy efficiency to complete the record form 2 copies of the design review of a copy of the record, a total of a total description of building energy, a report on the external wall, a three-window test, the system of a report on energy-saving test.
Q:What are the curtain wall materials to do? The beginning of the time
Curtain wall works include: 1, curtain wall works to complete the map, structural calculations, design instructions and documents; 2, the architectural design unit of the curtain wall engineering design confirmation documents; 3, the curtain wall works with a variety of materials, hardware accessories, components and components of product certification, performance testing reports, admission inspection records and re-inspection report; 4, the curtain wall works of the silicone structure of the identification of the certificate and the inspection certificate, the import of silicone structural adhesive business certification, silicone structural adhesive compatibility and peel adhesion report, stone sealant with the pollution test report ; 5, post-embedded pieces of the field tensile strength test report; 6, the wind wall of the wind pressure deformation performance, airtight performance, watertight performance and other design requirements of the performance test report; 7, glue, curing the environment temperature, humidity records, two-component silicone structure of the mixing test of plastic and pull test records; 8, lightning protection device detection burn; 9, hidden engineering acceptance documents; 10, the curtain wall components and components of the production of burning, curtain wall installation construction records; 11, tension rod cable prestressed tension record; 12, water test records;
Q:Curtain wall energy-saving project acceptance of the general project which
Construction and installation requirements, including insulation material fixed, partition thermal bridge, steam layer, ventilation equipment, glass installation, shade installation, condensate set system installation.
Q:Bidding documents are glass curtain wall, the party has to check the aluminum alloy window, how to do?
Generally fixed on the window lintel, is the top of the entire window.You need the proportion should be on the proportion of solid slip, the slide is the sash of the slide plus fixed, is a dual-use profiles, doors and windows designed to save Material, and it can be made to the sill a chute, you can also fix the above glass. Generally no fixed ratio
Q:What is the construction process of the point glass curtain wall?
First measure whether the steel structure and drawings in line to see if there is no deviation. If there is no deviation in the steel structure on the line to set the location of the mother, the location should be as accurate as possible. And then welding to the mother base. The welding is completed and then the jaw pieces are mounted on the female base, and then the splice fitting is mounted on the hole of the glass, and then the hook is hung up and the screw is tightened. Out of place.
Q:Stainless steel sheet approach to provide any proof of quality documents
There are many types of curtain walls, such as glass curtain wall, dry hanging stone curtain wall, aluminum-plastic curtain wall, etc., which there are a number of detailed classification, I have some information on hand, I do not know which corresponds to your needs, please add specific requirements
We make every step strictly, especially for testing. We have spectroscopy analysis, metallographic microscope, tensile, hardness, impact and X-Ray test, liquid penetrant, magnetic particle test and NTD inspection. The interpretation of the data from these test facilities could promise the best quality of our raw casting, any required test report of process should be attached before delivery of all the casting parts of each.

1. Manufacturer Overview

Location Guangdong,China (Mainland)
Year Established 2008
Annual Output Value
Main Markets North America
South America
Eastern Europe
Southeast Asia
Oceania
Mid East
Eastern Asia
Western Europe
Company Certifications ISO 9001:2000;ISO 9001:2008;QS-System nach EN 764-5, Abschnitt 4.2, und AD 2000-Merkblatt W O

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords