• Precison Casting 304/316/Stainless Steel System 1
Precison Casting 304/316/Stainless Steel

Precison Casting 304/316/Stainless Steel

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
500 Kilograms kg/m³
Supply Capability:
60 Tons Per Month kg/m³/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1. Intruduction:precison casting,precision casting,investment casting,304/316 stainless steel,building hardware,glass handrail

 

2. Size:100mm,120mm,150mm,160mm,200mm,210mm,220mm,250mm,300mm.

 

3. Material201,202,301,304,316,316L...304 and 316 material are popular in the market

 

4. Each type include the 4 arms,3 arms,2 arms,90.2 arms,108.1arm long and 1 arm short

 

5. The surface can be coated with paint of different colors

 

6. Package:carton package or can do as the requirement of our clients with your logo

 

7. The payment is T/T or L/C 30% down payment should be paid first and others should be paid after your get the B/L

 

8. You can order the full set including the routels and the connector or only the spider

 

9. precision casting,investment casting,304/316 stainless steel,building hardware, curtain wall

 

10. surface:Mirror /Sation finish

Q: Residential stone curtain wall design height of not more than 50m to demonstrate it
In accordance with the provisions of Article 6, paragraph 1, of Annex II of the "more dangerous part of the project with a greater risk than that of the" more dangerous part of the project safety management approach ", only 50 meters and above Expert argument.
Q: Curtain wall design documents review how qualified newspaper supervision
Upstairs that is also OK, but I think the best to play an A4 table, followed by a certificate sent in the past better, so it seems more formal, but the certificate to his copy is on the line.
Q: Department of Construction and Construction (2017) 38 on the construction of glass curtain wall what are the requirements
The new glass curtain wall should take into account the urban landscape, the surrounding environment and the nature of the building and the use of functions and other factors, in accordance with building safety, environmental protection and energy saving requirements, reasonable control of the glass curtain wall type, shape and area. Encourage the use of lightweight energy-saving decorative materials, from the source to reduce the glass curtain wall security risks.
Q: What is the construction process of the point glass curtain wall?
First measure whether the steel structure and drawings in line to see if there is no deviation. If there is no deviation in the steel structure on the line to set the location of the mother, the location should be as accurate as possible. And then welding to the mother base. The welding is completed and then the jaw pieces are mounted on the female base, and then the splice fitting is mounted on the hole of the glass, and then the hook is hung up and the screw is tightened. Out of place.
Q: Stainless steel sheet approach to provide any proof of quality documents
The simplest is the material certificate slightly, generally large steel mills are made of stainless steel material certificate. If your product needs environmentally friendly, then the use of stainless steel on the need for environmental certification, like ROSH certification.
Q: Building energy efficiency acceptance of what documents
Technical documents 1.1 through the review of the agency to review the energy-saving design and related technical documents (such as energy-saving design, energy-saving design calculations, etc.); 1.2 exterior wall, roof and hot bridge parts of the insulation construction practices or construction program design and construction plans; 2 Building and insulation materials for the manufacture of specimens 2.1 wall samples: If the ordinary clay hollow brick wall should be asked about 60 ordinary clay hollow brick, such as small hollow block (190 × 190 × 390) wall should obtain 14 blocks and seven small pieces of small hollow block ; Roof test specimen: 0.20 cubic meters of concrete material should be obtained; 2.2 sand: about 200 kg; 2.3, cementing material (cement 30 kg, lime cream 10 kg, etc.); 2.4 insulation materials and installation of insulation materials annex (calculated by 1.5 square meters); 2.5 plaster material and finishes (in 1.5 square meters).
Q: What is the classification of building materials?
Main points: foundation and foundation, the main structure, architectural decoration, construction roof, hydropower, fire, elevators, etc.
Q: What are the contents of the curtain wall energy conservation project quality acceptance?
Curtain wall energy-saving construction of the following parts or projects should be hidden project acceptance, and should have a detailed text and the necessary image information: 1 is the thickness of the insulation material and insulation material is fixed; 2 wall around the wall and the joints of the insulation material filling; 3 construction joints, settlement joints; 4 steam layer; 5 hot bridge parts, heat sink nodes; 6 joints between the curtain wall panels; 7 Condensate collection and discharge structures; 8 curtain wall ventilation device.
Q: How many calculations for a square meter of material?
Upstairs is also quite detailed, when we offer the general is for different types of curtain wall (different panels, keel in different forms to be separated), take a standard position of the surface, calculate the amount of various materials inside * Loss coefficient, and then divided by the area of this face, came out no square meters of the material.
Q: Whether the civil tender contains the curtain wall and does not contain the curtain wall, behind the owner and the general contract of the contract agreement What is the difference
If the total tender documents contain curtain wall, indicating that the total subcontract management, behind the curtain wall unit calibration, signed the total package, the owner and the curtain wall units of the tripartite agreement, take the total package of the notice and the three parties can be directly filed for the record.
We make every step strictly, especially for testing. We have spectroscopy analysis, metallographic microscope, tensile, hardness, impact and X-Ray test, liquid penetrant, magnetic particle test and NTD inspection. The interpretation of the data from these test facilities could promise the best quality of our raw casting, any required test report of process should be attached before delivery of all the casting parts of each.

1. Manufacturer Overview

Location Guangdong,China (Mainland)
Year Established 2008
Annual Output Value
Main Markets North America
South America
Eastern Europe
Southeast Asia
Oceania
Mid East
Eastern Asia
Western Europe
Company Certifications ISO 9001:2000;ISO 9001:2008;QS-System nach EN 764-5, Abschnitt 4.2, und AD 2000-Merkblatt W O

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a) Trade Capacity
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b) Factory Information
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords