Holder of Stainless Steel Glass Clamp
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Pieces pc
- Supply Capability:
- 100000 Pieces per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Material:Stainless steel 304 or 316
2.Surface: Satin or mirror surface treatment
3.Type:Stainless steel two way arm spider
4.Application:Used on handrail or balustrade
5.Certificates:International testimonials of ISO9001:2008,CE&PED of TUV
6.Delivery:By ship,by plane or by express
7.We can also accept ODM or OEM service
8.We have our own lost-wax casting and machining factories,we can make sure that the material component and quality are totally up to your requirements
- Q: Residential stone curtain wall design height of not more than 50m to demonstrate it
- Not more than 50 meters, do not need expert argument.
- Q: Curtain wall design documents review how qualified newspaper supervision
- You should say is the curtain wall of the drawings review certificate. Do not need any format, do not have a separate inspection, copy a copy of the supervision to the OK. The The And the original should be given to the Party
- Q: Department of Construction and Construction (2017) 38 on the construction of glass curtain wall what are the requirements
- Personnel-intensive, large-scale commercial center, transportation hub, public cultural and sports facilities and other places, near the road, square and the lower for the entrance, personnel access to the building, is strictly prohibited with the whole frame glass curtain wall. Above the building in the second floor and above the installation of glass curtain wall, should be in the surrounding area below the curtain wall reasonable set of green belt or podium and other buffer areas, can also be used to pick the canopy, anti-impact awning and other protective facilities.
- Q: What is the construction process of the point glass curtain wall?
- First measure whether the steel structure and drawings in line to see if there is no deviation. If there is no deviation in the steel structure on the line to set the location of the mother, the location should be as accurate as possible. And then welding to the mother base. The welding is completed and then the jaw pieces are mounted on the female base, and then the splice fitting is mounted on the hole of the glass, and then the hook is hung up and the screw is tightened. Out of place.
- Q: Building energy efficiency acceptance of what documents
- Technical documents 1.1 through the review of the agency to review the energy-saving design and related technical documents (such as energy-saving design, energy-saving design calculations, etc.); 1.2 exterior wall, roof and hot bridge parts of the insulation construction practices or construction program design and construction plans; 2 Building and insulation materials for the manufacture of specimens 2.1 wall samples: If the ordinary clay hollow brick wall should be asked about 60 ordinary clay hollow brick, such as small hollow block (190 × 190 × 390) wall should obtain 14 blocks and seven small pieces of small hollow block ; Roof test specimen: 0.20 cubic meters of concrete material should be obtained; 2.2 sand: about 200 kg; 2.3, cementing material (cement 30 kg, lime cream 10 kg, etc.); 2.4 insulation materials and installation of insulation materials annex (calculated by 1.5 square meters); 2.5 plaster material and finishes (in 1.5 square meters).
- Q: What is the classification of building materials?
- Main points: foundation and foundation, the main structure, architectural decoration, construction roof, hydropower, fire, elevators, etc.
- Q: Curtain wall energy-saving project acceptance of the general project which
- Curtain wall thermal construction requirements, including insulation material installation, steam layer, curtain wall and wall joints, structural joints, structural joints, hot bridge parts, heat sink joints, unit curtain wall plate joints, condensate set Row structure and so on.
- Q: What are the contents of the curtain wall energy conservation project quality acceptance?
- Curtain wall energy-saving project quality acceptance includes the following: 1) hidden acceptance requirements. 2) curtain wall materials, accessories, accessories, components of the quality, including insulation materials, glass, shade components, unit curtain wall panels, seals, insulation profiles. 3) materials, accessories, accessories, components witnessed sampling, re-inspection requirements. 4) curtain wall air tightness requirements, laboratory inspection requirements. 5) curtain wall thermal construction requirements, including insulation material installation, steam layer, curtain wall and wall joints, structural joints, structural joints, hot bridge parts, heat sink joints, unit curtain wall between the joints, Water drainage structure and so on. 6) construction and installation requirements, including insulation material fixed, partition thermal bridge, steam layer, ventilation equipment, glass installation, shade installation, condensate drainage system installation.
- Q: Bidding documents are glass curtain wall, the party has to check the aluminum alloy window, how to do?
- Should be agreed by the contract, if the contract is not agreed, that is, according to the actual settlement of the two sides resolved.
- Q: What are the curtain wall materials to do? The beginning of the time
- At the same time, the curtain wall project acceptance, but also to the owners to provide "curtain wall use maintenance instructions", in the curtain wall before delivery, but also for the owners of training curtain wall maintenance and maintenance personnel. Curtain wall works other technical and economic documents, in accordance with the "Construction Project Document Archiving Code" (GB / T50328-2001) provisions of the directory filing.
1. Manufacturer Overview
Location | Guangdong,China (Mainland) |
Year Established | 2008 |
Annual Output Value | |
Main Markets | North America South America Eastern Europe Southeast Asia Oceania Mid East Eastern Asia Western Europe |
Company Certifications | ISO 9001:2000;ISO 9001:2008;QS-System nach EN 764-5, Abschnitt 4.2, und AD 2000-Merkblatt W O |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b) Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Holder of Stainless Steel Glass Clamp
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Pieces pc
- Supply Capability:
- 100000 Pieces per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords