• Stainless Steel Fin Spider for Glass Curtain Wall System 1
Stainless Steel Fin Spider for Glass Curtain Wall

Stainless Steel Fin Spider for Glass Curtain Wall

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
100 Piece/Pieces pc
Supply Capability:
60 Ton/Tons Per Month pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Intruduction:precision casting,investment casting,304/316 stainless steel,building hardware,glass spider,building curtain wall

2. Size:100mm,120mm,150mm,160mm,200mm,210mm,220mm,250mm,300mm.

3. Material201,202,301,304,316,316L/304 and 316 material are popular in the market

4. Each type include the 4 arms,3 arms,2 arms,90.2 arms,108.1arm long and 1 arm short

5. The surface can be coated with paint of different colors

6. Package:carton package or can do as the requirement of our clients with your logo

7. The payment is T/T or L/C 30% down payment should be paid first and others should be paid after your get the B/L

8. You can order the full set including the routels and the connector or only the spider

Q: Residential stone curtain wall design height of not more than 50m to demonstrate it
Not more than 50 meters, do not need expert argument.
Q: Department of Construction and Construction (2017) 38 on the construction of glass curtain wall what are the requirements
Personnel-intensive, large-scale commercial center, transportation hub, public cultural and sports facilities and other places, near the road, square and the lower for the entrance, personnel access to the building, is strictly prohibited with the whole frame glass curtain wall. Above the building in the second floor and above the installation of glass curtain wall, should be in the surrounding area below the curtain wall reasonable set of green belt or podium and other buffer areas, can also be used to pick the canopy, anti-impact awning and other protective facilities.
Q: Building energy efficiency acceptance of what documents
Building energy efficiency to complete the record form 2 copies of the design review of a copy of the record, a total of a total description of building energy, a report on the external wall, a three-window test, the system of a report on energy-saving test.
Q: What is the classification of building materials?
Generally have: progress, quality, safety, cost
Q: Curtain wall energy-saving project acceptance of the general project which
Curtain wall energy conservation project quality acceptance includes the following: 1) hidden acceptance requirements. 2) curtain wall materials, accessories, accessories, components of the quality, including insulation materials, glass, shade components, unit curtain wall panels, seals, insulation profiles. 3) materials, accessories, accessories, components witnessed sampling, re-inspection requirements. 4) curtain wall air tightness requirements, laboratory inspection requirements.
Q: What are the contents of the curtain wall energy conservation project quality acceptance?
Curtain wall energy-saving project quality acceptance includes the following: 1) hidden acceptance requirements. 2) curtain wall materials, accessories, accessories, components of the quality, including insulation materials, glass, shade components, unit curtain wall panels, seals, insulation profiles. 3) materials, accessories, accessories, components witnessed sampling, re-inspection requirements. 4) curtain wall air tightness requirements, laboratory inspection requirements. 5) curtain wall thermal construction requirements, including insulation material installation, steam layer, curtain wall and wall joints, structural joints, structural joints, hot bridge parts, heat sink joints, unit curtain wall between the joints, Water drainage structure and so on. 6) construction and installation requirements, including insulation material fixed, partition thermal bridge, steam layer, ventilation equipment, glass installation, shade installation, condensate drainage system installation.
Q: How many calculations for a square meter of material?
Curtain wall material calculation points: 1. Panel: panel ratio of expansion area * utilization (general 1.03) 2. keel: linear density * per square meter length * utilization (generally 1.05 ~ 1.15, according to material specifications) 3. Attachment: use per square meter (weight or volume number) * Utilization rate (general 1.03) 4. Low-value consumables: 15 ~ 25 (yuan / m2, according to the type of curtain wall to consider) 5. Labor costs: market decisions
Q: Bidding documents are glass curtain wall, the party has to check the aluminum alloy window, how to do?
Should be agreed by the contract, if the contract is not agreed, that is, according to the actual settlement of the two sides resolved.
Q: Whether the civil tender contains the curtain wall and does not contain the curtain wall, behind the owner and the general contract of the contract agreement What is the difference
If not included, that the curtain wall to a separate tender, not included in the total package management, that curtain wall bid to issue a separate bid notice, the top of the tender to do the chapter, curtain wall units and owners signed a contract, the record is to take both sides of the contract and curtain wall Successful notice of the record.
Q: What are the curtain wall materials to do? The beginning of the time
Other quality assurance information.
We make every step strictly, especially for testing. We have spectroscopy analysis, metallographic microscope, tensile, hardness, impact and X-Ray test, liquid penetrant, magnetic particle test and NTD inspection. The interpretation of the data from these test facilities could promise the best quality of our raw casting, any required test report of process should be attached before delivery of all the casting parts of each.

1. Manufacturer Overview

Location Guangdong,China (Mainland)
Year Established 2008
Annual Output Value
Main Markets North America
South America
Eastern Europe
Southeast Asia
Oceania
Mid East
Eastern Asia
Western Europe
Company Certifications ISO 9001:2000;ISO 9001:2008;QS-System nach EN 764-5, Abschnitt 4.2, und AD 2000-Merkblatt W O

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a) Trade Capacity
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b) Factory Information
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords