• Stainless Steel Glass fittings for Curtain Wall System 1
Stainless Steel Glass fittings for Curtain Wall

Stainless Steel Glass fittings for Curtain Wall

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
100 Pieces pc
Supply Capability:
100000 Pieces per Month pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

We are a professional manufacturer of glass clamp, balustrade and handrail fittings,pipe fittings and curtain wall spiders,including wall bracket,end cap,tube base,flange,elbow,tee,rail support,crossbar holder,wall spider,also we can supply the whole set of handrail and balustrade series etc.

 

We have our own lost-wax casting and machining foundries,have high-qualified workmen with advanced experience,examination,equipment and quality-guaranteed system.

 

1.one-arm spider

 

2.two-way spider

 

3.three-way spider

 

4.four-way spider

 

5.route is also available

 

6.Material: SS304 (AISI304) and SS316(AISI316);

 

7.Surface: satin/brushed finish or mirror/polished finish;

 

8.Certificates:international testimonials of ISO9001/2008,CE & PED;

 

9.Payment: T/T 30% paid in advance as deposit, 70% balance to be paid upon receipt of copy of B\L.

 

10.Delivery time: 35-45 days upon receipt of deposit;

 

11.Terms of delivery: By ship, by plane or by express;

 

12.Packng:Each one is wrapped in EPE bag,6 pcs are put into a small white box,ten boxes makes a outer carton;

 

13.100% guarantee on the highest quality,the material is analyzed by German Spectrometer for each furnace.

 

14.Reputation: We enjoy a good reputataion from home and abroad,so far we have not received any complaints;

 

15.ODM and OEM: Our R & D department is able to offer technical support for customers on the basis of your sample or drawing. A mould cost will be paid back if your order reaches a specific quantity.

Q:What is the classification of building materials?
Construction technology information according to its nature is divided into seven categories: The first category: construction project legal construction procedures necessary documents; Category II: Integrated management information; The third category: engineering quality control information; Including: acceptance of information Construction management information Product quality certification documents Inspection Report Construction record and inspection report The fourth category: engineering safety and functional inspection data and the main function of the record; The fifth category: inspection batch quality acceptance records; Category 6: Construction log; The seventh category: the completion of the map;
Q:Whether the civil tender contains the curtain wall and does not contain the curtain wall, behind the owner and the general contract of the contract agreement What is the difference
If the total tender documents contain curtain wall, indicating that the total subcontract management, behind the curtain wall unit calibration, signed the total package, the owner and the curtain wall units of the tripartite agreement, take the total package of the notice and the three parties can be directly filed for the record.
Q:Curtain wall design documents review how qualified newspaper supervision
You should say is the curtain wall of the drawings review certificate. Do not need any format, do not have a separate inspection, copy a copy of the supervision to the OK. The The And the original should be given to the Party
Q:What are the curtain wall materials to do? The beginning of the time
Other quality assurance information.
Q:Curtain wall energy-saving project acceptance of the general project which
Curtain wall energy conservation project quality acceptance includes the following: 1) hidden acceptance requirements. 2) curtain wall materials, accessories, accessories, components of the quality, including insulation materials, glass, shade components, unit curtain wall panels, seals, insulation profiles. 3) materials, accessories, accessories, components witnessed sampling, re-inspection requirements. 4) curtain wall air tightness requirements, laboratory inspection requirements.
Q:Bidding documents are glass curtain wall, the party has to check the aluminum alloy window, how to do?
Should be agreed by the contract, if the contract is not agreed, that is, according to the actual settlement of the two sides resolved.
Q:What is the construction process of the point glass curtain wall?
First measure whether the steel structure and drawings in line to see if there is no deviation. If there is no deviation in the steel structure on the line to set the location of the mother, the location should be as accurate as possible. And then welding to the mother base. The welding is completed and then the jaw pieces are mounted on the female base, and then the splice fitting is mounted on the hole of the glass, and then the hook is hung up and the screw is tightened. Out of place.
Q:What are the contents of the curtain wall energy conservation project quality acceptance?
Curtain wall energy-saving construction of the following parts or projects should be hidden project acceptance, and should have a detailed text and the necessary image information: 1 is the thickness of the insulation material and insulation material is fixed; 2 wall around the wall and the joints of the insulation material filling; 3 construction joints, settlement joints; 4 steam layer; 5 hot bridge parts, heat sink nodes; 6 joints between the curtain wall panels; 7 Condensate collection and discharge structures; 8 curtain wall ventilation device.
Q:Residential stone curtain wall design height of not more than 50m to demonstrate it
In accordance with the provisions of Article 6, paragraph 1, of Annex II of the "more dangerous part of the project with a greater risk than that of the" more dangerous part of the project safety management approach ", only 50 meters and above Expert argument.
Q:Department of Construction and Construction (2017) 38 on the construction of glass curtain wall what are the requirements
The new glass curtain wall should be based on national laws and regulations and standards, to strengthen the program design, construction design and construction program safety technology demonstration, and completed before the special acceptance.
We make every step strictly, especially for testing. We have spectroscopy analysis, metallographic microscope, tensile, hardness, impact and X-Ray test, liquid penetrant, magnetic particle test and NTD inspection. The interpretation of the data from these test facilities could promise the best quality of our raw casting, any required test report of process should be attached before delivery of all the casting parts of each.

1. Manufacturer Overview

Location Guangdong,China (Mainland)
Year Established 2008
Annual Output Value
Main Markets North America
South America
Eastern Europe
Southeast Asia
Oceania
Mid East
Eastern Asia
Western Europe
Company Certifications ISO 9001:2000;ISO 9001:2008;QS-System nach EN 764-5, Abschnitt 4.2, und AD 2000-Merkblatt W O

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords