Stainless Steel Point-fixed Glass Wall Fittings Fluorocabon Coating Spiders/Glass Spider
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Sets set
- Supply Capability:
- 30000 Sets Per Month set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Those Fluorocarbon Coating Spiders have excellent weather ability and are best used in heavily polluted and coastle areas.
We are the professional manufacturer of producing point-fixed Glass Wall Fittings (Flat Cap Routel, Countersunk Routel, Splice Routel, Connector, Spider for the end Tension Rod, Spider for the Cable Net, Fin Spider, Glass Clamp, The Accessories of the Opening Window for the Point-fixed Glass Curtain Wall, The Strut Bar for the TensionCable, The Strut Bar for the Tension Rod, Tension Rod, Tension Cable etc.).
1 |
Product Name |
Stainless steel point-fixed Glass Wall Fittings |
2 |
Brand |
FITSHY |
5 |
Material |
201, 302, 304, 304L, 316, 316L, according to customers' requirements |
6 |
Standard |
GB, JIS, AISI, BS, DIN |
7 |
Size |
CC=150mm |
CC=160mm | ||
CC=200mm | ||
CC=210mm | ||
CC=220mm | ||
CC=250mm | ||
CC=300mm | ||
8 |
Finishing |
Mirror polished, Matte finish, Fluorocarbon coating(all kinds of colors) |
9 |
Usage |
Glass curtain wall and glass canopy |
10 |
Package |
Bubble bag + Inner box + Carton |
11 |
MOQ |
100 SETS |
12 |
Delivery time |
In stock |
13 |
Price |
0-10000 USD/set |
14 |
Service |
1.Product design drawings (CAD) |
2.Professional engineer advices | ||
3.Installation guiding | ||
4.Product Warranty is offered | ||
5.OEM, ODM , Customer design | ||
15 |
Payment |
L/C, T/T |
16 |
Ability |
30,000 sets |
The recommended value for the loading of single arm of spider
NO. |
Spider Series Code |
Material:304 | |
Permissible axial load (N) (negative pressure) |
Radial Allowable load (N) (dead weight) | ||
1 |
ST-150 Series “X” Shape |
1500 |
1000 |
2 |
ST-160 Series “X” Shape |
2000 |
1200 |
3 |
ST-200 Series “X” Shape |
3000 |
1500 |
4 |
ST-210 Series “X” Shape |
3000 |
2000 |
5 |
ST-220 Series “X” Shape |
3000 |
2000 |
6 |
ST-250 Series “X” Shape |
3500 |
2000 |
7 |
ST-300 Series “X” Shape |
4000 |
2000 |
- Q: Residential stone curtain wall design height of not more than 50m to demonstrate it
- In accordance with the provisions of Article 6, paragraph 1, of Annex II of the "more dangerous part of the project with a greater risk than that of the" more dangerous part of the project safety management approach ", only 50 meters and above Expert argument.
- Q: Department of Construction and Construction (2017) 38 on the construction of glass curtain wall what are the requirements
- Personnel-intensive, large-scale commercial center, transportation hub, public cultural and sports facilities and other places, near the road, square and the lower for the entrance, personnel access to the building, is strictly prohibited with the whole frame glass curtain wall. Above the building in the second floor and above the installation of glass curtain wall, should be in the surrounding area below the curtain wall reasonable set of green belt or podium and other buffer areas, can also be used to pick the canopy, anti-impact awning and other protective facilities.
- Q: What is the construction process of the point glass curtain wall?
- First measure whether the steel structure and drawings in line to see if there is no deviation. If there is no deviation in the steel structure on the line to set the location of the mother, the location should be as accurate as possible. And then welding to the mother base. The welding is completed and then the jaw pieces are mounted on the female base, and then the splice fitting is mounted on the hole of the glass, and then the hook is hung up and the screw is tightened. Out of place.
- Q: What is the classification of building materials?
- Generally have: progress, quality, safety, cost
- Q: Curtain wall energy-saving project acceptance of the general project which
- Curtain wall thermal construction requirements, including insulation material installation, steam layer, curtain wall and wall joints, structural joints, structural joints, hot bridge parts, heat sink joints, unit curtain wall plate joints, condensate set Row structure and so on.
- Q: What are the contents of the curtain wall energy conservation project quality acceptance?
- Curtain wall energy-saving construction of the following parts or projects should be hidden project acceptance, and should have a detailed text and the necessary image information: 1 is the thickness of the insulation material and insulation material is fixed; 2 wall around the wall and the joints of the insulation material filling; 3 construction joints, settlement joints; 4 steam layer; 5 hot bridge parts, heat sink nodes; 6 joints between the curtain wall panels; 7 Condensate collection and discharge structures; 8 curtain wall ventilation device.
- Q: How many calculations for a square meter of material?
- Curtain wall material calculation points: 1. Panel: panel ratio of expansion area * utilization (general 1.03) 2. keel: linear density * per square meter length * utilization (generally 1.05 ~ 1.15, according to material specifications) 3. Attachment: use per square meter (weight or volume number) * Utilization rate (general 1.03) 4. Low-value consumables: 15 ~ 25 (yuan / m2, according to the type of curtain wall to consider) 5. Labor costs: market decisions
- Q: Bidding documents are glass curtain wall, the party has to check the aluminum alloy window, how to do?
- Generally fixed on the window lintel, is the top of the entire window.You need the proportion should be on the proportion of solid slip, the slide is the sash of the slide plus fixed, is a dual-use profiles, doors and windows designed to save Material, and it can be made to the sill a chute, you can also fix the above glass. Generally no fixed ratio
- Q: Whether the civil tender contains the curtain wall and does not contain the curtain wall, behind the owner and the general contract of the contract agreement What is the difference
- If the total tender documents contain curtain wall, indicating that the total subcontract management, behind the curtain wall unit calibration, signed the total package, the owner and the curtain wall units of the tripartite agreement, take the total package of the notice and the three parties can be directly filed for the record.
- Q: What are the curtain wall materials to do? The beginning of the time
- At the same time, the curtain wall project acceptance, but also to the owners to provide "curtain wall use maintenance instructions", in the curtain wall before delivery, but also for the owners of training curtain wall maintenance and maintenance personnel. Curtain wall works other technical and economic documents, in accordance with the "Construction Project Document Archiving Code" (GB / T50328-2001) provisions of the directory filing.
1. Manufacturer Overview
Location | Shanghai,China (Mainland) |
Year Established | 2012 |
Annual Output Value | US$1 Million - US$2.5 Million |
Main Markets | Southeast Asia; Africa; Mid East; Eastern Asia; South Asia; Domestic Market |
Company Certifications | HACCP;ISO 9001:2000;ISO 9001:2008 |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | |
Export Percentage | 31% - 40% |
No.of Employees in Trade Department | 1-2 People |
Language Spoken: | |
b) Factory Information | |
Factory Size: | 3,000-5,000 square meters |
No. of Production Lines | 5 |
Contract Manufacturing | OEM Service Offered |
Product Price Range | Average |
Send your message to us
Stainless Steel Point-fixed Glass Wall Fittings Fluorocabon Coating Spiders/Glass Spider
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Sets set
- Supply Capability:
- 30000 Sets Per Month set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords