• Stainless Steel Hinge Cabinet Hardware System 1
Stainless Steel Hinge Cabinet Hardware

Stainless Steel Hinge Cabinet Hardware

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
500 Kilogram/Kilograms m.t.
Supply Capability:
60 Ton/Tons Per Month m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.stainless steel hinge cabinet hardware ,304/316 stainless

 

2.Surface :Satin 320#,Mirror polished

 

3.Material201,202,301,304,316,316L...304 and 316 material are popular in the market

     

4.The surface can be coated with paint of different colors

 

5.Package:carton package or can do as the requirement of our clients with your logo

 

6.The payment is T/T or L/C 30% down payment should be paid first and others should be   paid after your get the B/L

 

Q:How many calculations for a square meter of material?
Curtain wall material calculation points: 1. Panel: panel ratio of expansion area * utilization (general 1.03) 2. keel: linear density * per square meter length * utilization (generally 1.05 ~ 1.15, according to material specifications) 3. Attachment: use per square meter (weight or volume number) * Utilization rate (general 1.03) 4. Low-value consumables: 15 ~ 25 (yuan / m2, according to the type of curtain wall to consider) 5. Labor costs: market decisions
Q:Fire aluminum glass is what glass where to sell
This involves more, you can special check, of course, you need to be specific communication
Q:What is the classification of building materials?
Generally have: progress, quality, safety, cost
Q:Whether the civil tender contains the curtain wall and does not contain the curtain wall, behind the owner and the general contract of the contract agreement What is the difference
If not included, that the curtain wall to a separate tender, not included in the total package management, that curtain wall bid to issue a separate bid notice, the top of the tender to do the chapter, curtain wall units and owners signed a contract, the record is to take both sides of the contract and curtain wall Successful notice of the record.
Q:Curtain wall design documents review how qualified newspaper supervision
You should say is the curtain wall of the drawings review certificate. Do not need any format, do not have a separate inspection, copy a copy of the supervision to the OK. The The And the original should be given to the Party
Q:Building energy efficiency acceptance of what documents
Technical documents 1.1 through the review of the agency to review the energy-saving design and related technical documents (such as energy-saving design, energy-saving design calculations, etc.); 1.2 exterior wall, roof and hot bridge parts of the insulation construction practices or construction program design and construction plans; 2 Building and insulation materials for the manufacture of specimens 2.1 wall samples: If the ordinary clay hollow brick wall should be asked about 60 ordinary clay hollow brick, such as small hollow block (190 × 190 × 390) wall should obtain 14 blocks and seven small pieces of small hollow block ; Roof test specimen: 0.20 cubic meters of concrete material should be obtained; 2.2 sand: about 200 kg; 2.3, cementing material (cement 30 kg, lime cream 10 kg, etc.); 2.4 insulation materials and installation of insulation materials annex (calculated by 1.5 square meters); 2.5 plaster material and finishes (in 1.5 square meters).
Q:What are the curtain wall materials to do? The beginning of the time
Other quality assurance information.
Q:Curtain wall energy-saving project acceptance of the general project which
Curtain wall thermal construction requirements, including insulation material installation, steam layer, curtain wall and wall joints, structural joints, structural joints, hot bridge parts, heat sink joints, unit curtain wall plate joints, condensate set Row structure and so on.
Q:Residential stone curtain wall design height of not more than 50m to demonstrate it
In accordance with the provisions of Article 6, paragraph 1, of Annex II of the "more dangerous part of the project with a greater risk than that of the" more dangerous part of the project safety management approach ", only 50 meters and above Expert argument.
Q:Department of Construction and Construction (2017) 38 on the construction of glass curtain wall what are the requirements
The new glass curtain wall should be based on national laws and regulations and standards, to strengthen the program design, construction design and construction program safety technology demonstration, and completed before the special acceptance.
We make every step strictly, especially for testing. We have spectroscopy analysis, metallographic microscope, tensile, hardness, impact and X-Ray test, liquid penetrant, magnetic particle test and NTD inspection. The interpretation of the data from these test facilities could promise the best quality of our raw casting, any required test report of process should be attached before delivery of all the casting parts of each.

1. Manufacturer Overview

Location Guangdong,China (Mainland)
Year Established 2008
Annual Output Value
Main Markets North America
South America
Eastern Europe
Southeast Asia
Oceania
Mid East
Eastern Asia
Western Europe
Company Certifications ISO 9001:2000;ISO 9001:2008;QS-System nach EN 764-5, Abschnitt 4.2, und AD 2000-Merkblatt W O

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords